EP2372638 - A black and white stretch method for dynamic range extension [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.09.2013 Database last updated on 16.07.2024 | Most recent event Tooltip | 17.07.2015 | Lapse of the patent in a contracting state New state(s): HU, LU | published on 19.08.2015 [2015/34] | Applicant(s) | For all designated states Vestel Elektronik Sanayi ve Ticaret A.S. Organize Sanayi Bölgesi 45030 Manisa / TR | [2011/40] | Inventor(s) | 01 /
Cigla, Cevahir Vestel Elektronik Sanayi ve Ticaret A.S. Organize Sanayi Bölgesi 45030, Manisa / TR | [2011/40] | Representative(s) | Cayli, Hülya Paragon Consultancy Inc. Koza Sokak No: 63/2 GOP 06540 Ankara / TR | [2011/40] | Application number, filing date | 11156605.5 | 02.03.2011 | [2011/40] | Priority number, date | TR20100001660 | 04.03.2010 Original published format: TR 201001660 | [2011/40] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2372638 | Date: | 05.10.2011 | Language: | EN | [2011/40] | Type: | B1 Patent specification | No.: | EP2372638 | Date: | 07.11.2012 | Language: | EN | [2012/45] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 01.07.2011 | Classification | IPC: | G06T5/40, // G06T5/00 | [2012/28] | CPC: |
G06T5/40 (EP);
G06T5/92 (EP);
G06T2207/10016 (EP)
|
Former IPC [2011/40] | G06T5/40 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2011/40] | Title | German: | Schwarz-Weiss-Spannverfahren zur dynamischen Bereichserweiterung | [2011/40] | English: | A black and white stretch method for dynamic range extension | [2011/40] | French: | Procédé d'étirement en noir et blanc pour extension de plage dynamique | [2011/40] | Examination procedure | 30.03.2012 | Amendment by applicant (claims and/or description) | 30.03.2012 | Examination requested [2012/19] | 19.06.2012 | Communication of intention to grant the patent | 26.09.2012 | Fee for grant paid | 26.09.2012 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 19.06.2012 | Opposition(s) | 08.08.2013 | No opposition filed within time limit [2013/42] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 02.03.2011 | AL | 07.11.2012 | AT | 07.11.2012 | BE | 07.11.2012 | CY | 07.11.2012 | CZ | 07.11.2012 | DK | 07.11.2012 | EE | 07.11.2012 | FI | 07.11.2012 | HR | 07.11.2012 | LT | 07.11.2012 | LV | 07.11.2012 | MK | 07.11.2012 | MT | 07.11.2012 | NL | 07.11.2012 | PL | 07.11.2012 | RO | 07.11.2012 | RS | 07.11.2012 | SE | 07.11.2012 | SI | 07.11.2012 | SK | 07.11.2012 | SM | 07.11.2012 | BG | 07.02.2013 | NO | 07.02.2013 | GR | 08.02.2013 | IE | 02.03.2013 | LU | 02.03.2013 | IS | 07.03.2013 | PT | 07.03.2013 | MC | 31.03.2013 | [2015/34] |
Former [2015/32] | AL | 07.11.2012 | |
AT | 07.11.2012 | ||
BE | 07.11.2012 | ||
CY | 07.11.2012 | ||
CZ | 07.11.2012 | ||
DK | 07.11.2012 | ||
EE | 07.11.2012 | ||
FI | 07.11.2012 | ||
HR | 07.11.2012 | ||
LT | 07.11.2012 | ||
LV | 07.11.2012 | ||
MK | 07.11.2012 | ||
MT | 07.11.2012 | ||
NL | 07.11.2012 | ||
PL | 07.11.2012 | ||
RO | 07.11.2012 | ||
RS | 07.11.2012 | ||
SE | 07.11.2012 | ||
SI | 07.11.2012 | ||
SK | 07.11.2012 | ||
SM | 07.11.2012 | ||
BG | 07.02.2013 | ||
NO | 07.02.2013 | ||
GR | 08.02.2013 | ||
IE | 02.03.2013 | ||
IS | 07.03.2013 | ||
PT | 07.03.2013 | ||
MC | 31.03.2013 | ||
Former [2015/24] | AL | 07.11.2012 | |
AT | 07.11.2012 | ||
BE | 07.11.2012 | ||
CY | 07.11.2012 | ||
CZ | 07.11.2012 | ||
DK | 07.11.2012 | ||
EE | 07.11.2012 | ||
FI | 07.11.2012 | ||
HR | 07.11.2012 | ||
LT | 07.11.2012 | ||
LV | 07.11.2012 | ||
MT | 07.11.2012 | ||
NL | 07.11.2012 | ||
PL | 07.11.2012 | ||
RO | 07.11.2012 | ||
RS | 07.11.2012 | ||
SE | 07.11.2012 | ||
SI | 07.11.2012 | ||
SK | 07.11.2012 | ||
SM | 07.11.2012 | ||
BG | 07.02.2013 | ||
NO | 07.02.2013 | ||
GR | 08.02.2013 | ||
IE | 02.03.2013 | ||
IS | 07.03.2013 | ||
PT | 07.03.2013 | ||
MC | 31.03.2013 | ||
Former [2014/32] | AL | 07.11.2012 | |
AT | 07.11.2012 | ||
BE | 07.11.2012 | ||
CY | 07.11.2012 | ||
CZ | 07.11.2012 | ||
DK | 07.11.2012 | ||
EE | 07.11.2012 | ||
FI | 07.11.2012 | ||
HR | 07.11.2012 | ||
LT | 07.11.2012 | ||
LV | 07.11.2012 | ||
MT | 07.11.2012 | ||
NL | 07.11.2012 | ||
PL | 07.11.2012 | ||
RO | 07.11.2012 | ||
RS | 07.11.2012 | ||
SE | 07.11.2012 | ||
SI | 07.11.2012 | ||
SK | 07.11.2012 | ||
BG | 07.02.2013 | ||
NO | 07.02.2013 | ||
GR | 08.02.2013 | ||
IE | 02.03.2013 | ||
IS | 07.03.2013 | ||
PT | 07.03.2013 | ||
MC | 31.03.2013 | ||
Former [2014/09] | AL | 07.11.2012 | |
AT | 07.11.2012 | ||
BE | 07.11.2012 | ||
CY | 07.11.2012 | ||
CZ | 07.11.2012 | ||
DK | 07.11.2012 | ||
EE | 07.11.2012 | ||
FI | 07.11.2012 | ||
HR | 07.11.2012 | ||
LT | 07.11.2012 | ||
LV | 07.11.2012 | ||
NL | 07.11.2012 | ||
PL | 07.11.2012 | ||
RO | 07.11.2012 | ||
RS | 07.11.2012 | ||
SE | 07.11.2012 | ||
SI | 07.11.2012 | ||
SK | 07.11.2012 | ||
BG | 07.02.2013 | ||
NO | 07.02.2013 | ||
GR | 08.02.2013 | ||
IE | 02.03.2013 | ||
IS | 07.03.2013 | ||
PT | 07.03.2013 | ||
MC | 31.03.2013 | ||
Former [2014/07] | AT | 07.11.2012 | |
BE | 07.11.2012 | ||
CY | 07.11.2012 | ||
CZ | 07.11.2012 | ||
DK | 07.11.2012 | ||
EE | 07.11.2012 | ||
FI | 07.11.2012 | ||
HR | 07.11.2012 | ||
LT | 07.11.2012 | ||
LV | 07.11.2012 | ||
NL | 07.11.2012 | ||
PL | 07.11.2012 | ||
RO | 07.11.2012 | ||
RS | 07.11.2012 | ||
SE | 07.11.2012 | ||
SI | 07.11.2012 | ||
SK | 07.11.2012 | ||
BG | 07.02.2013 | ||
NO | 07.02.2013 | ||
GR | 08.02.2013 | ||
IE | 02.03.2013 | ||
IS | 07.03.2013 | ||
PT | 07.03.2013 | ||
MC | 31.03.2013 | ||
Former [2013/52] | AT | 07.11.2012 | |
BE | 07.11.2012 | ||
CY | 07.11.2012 | ||
CZ | 07.11.2012 | ||
DK | 07.11.2012 | ||
EE | 07.11.2012 | ||
FI | 07.11.2012 | ||
HR | 07.11.2012 | ||
LT | 07.11.2012 | ||
LV | 07.11.2012 | ||
NL | 07.11.2012 | ||
PL | 07.11.2012 | ||
RO | 07.11.2012 | ||
RS | 07.11.2012 | ||
SE | 07.11.2012 | ||
SI | 07.11.2012 | ||
SK | 07.11.2012 | ||
BG | 07.02.2013 | ||
NO | 07.02.2013 | ||
GR | 08.02.2013 | ||
IS | 07.03.2013 | ||
PT | 07.03.2013 | ||
MC | 31.03.2013 | ||
Former [2013/47] | AT | 07.11.2012 | |
BE | 07.11.2012 | ||
CZ | 07.11.2012 | ||
DK | 07.11.2012 | ||
EE | 07.11.2012 | ||
FI | 07.11.2012 | ||
HR | 07.11.2012 | ||
LT | 07.11.2012 | ||
LV | 07.11.2012 | ||
NL | 07.11.2012 | ||
PL | 07.11.2012 | ||
RO | 07.11.2012 | ||
RS | 07.11.2012 | ||
SE | 07.11.2012 | ||
SI | 07.11.2012 | ||
SK | 07.11.2012 | ||
BG | 07.02.2013 | ||
NO | 07.02.2013 | ||
GR | 08.02.2013 | ||
IS | 07.03.2013 | ||
PT | 07.03.2013 | ||
MC | 31.03.2013 | ||
Former [2013/37] | AT | 07.11.2012 | |
BE | 07.11.2012 | ||
CZ | 07.11.2012 | ||
DK | 07.11.2012 | ||
EE | 07.11.2012 | ||
FI | 07.11.2012 | ||
HR | 07.11.2012 | ||
LT | 07.11.2012 | ||
LV | 07.11.2012 | ||
NL | 07.11.2012 | ||
PL | 07.11.2012 | ||
RO | 07.11.2012 | ||
RS | 07.11.2012 | ||
SE | 07.11.2012 | ||
SI | 07.11.2012 | ||
SK | 07.11.2012 | ||
BG | 07.02.2013 | ||
NO | 07.02.2013 | ||
GR | 08.02.2013 | ||
IS | 07.03.2013 | ||
PT | 07.03.2013 | ||
Former [2013/35] | AT | 07.11.2012 | |
BE | 07.11.2012 | ||
CZ | 07.11.2012 | ||
DK | 07.11.2012 | ||
EE | 07.11.2012 | ||
FI | 07.11.2012 | ||
HR | 07.11.2012 | ||
LT | 07.11.2012 | ||
LV | 07.11.2012 | ||
NL | 07.11.2012 | ||
PL | 07.11.2012 | ||
RS | 07.11.2012 | ||
SE | 07.11.2012 | ||
SI | 07.11.2012 | ||
SK | 07.11.2012 | ||
BG | 07.02.2013 | ||
NO | 07.02.2013 | ||
GR | 08.02.2013 | ||
IS | 07.03.2013 | ||
PT | 07.03.2013 | ||
Former [2013/34] | AT | 07.11.2012 | |
BE | 07.11.2012 | ||
DK | 07.11.2012 | ||
FI | 07.11.2012 | ||
HR | 07.11.2012 | ||
LT | 07.11.2012 | ||
LV | 07.11.2012 | ||
NL | 07.11.2012 | ||
PL | 07.11.2012 | ||
RS | 07.11.2012 | ||
SE | 07.11.2012 | ||
SI | 07.11.2012 | ||
BG | 07.02.2013 | ||
NO | 07.02.2013 | ||
GR | 08.02.2013 | ||
IS | 07.03.2013 | ||
PT | 07.03.2013 | ||
Former [2013/32] | AT | 07.11.2012 | |
BE | 07.11.2012 | ||
FI | 07.11.2012 | ||
HR | 07.11.2012 | ||
LT | 07.11.2012 | ||
LV | 07.11.2012 | ||
NL | 07.11.2012 | ||
PL | 07.11.2012 | ||
RS | 07.11.2012 | ||
SE | 07.11.2012 | ||
SI | 07.11.2012 | ||
NO | 07.02.2013 | ||
GR | 08.02.2013 | ||
IS | 07.03.2013 | ||
PT | 07.03.2013 | ||
Former [2013/31] | AT | 07.11.2012 | |
BE | 07.11.2012 | ||
FI | 07.11.2012 | ||
HR | 07.11.2012 | ||
LT | 07.11.2012 | ||
LV | 07.11.2012 | ||
NL | 07.11.2012 | ||
PL | 07.11.2012 | ||
SE | 07.11.2012 | ||
SI | 07.11.2012 | ||
NO | 07.02.2013 | ||
GR | 08.02.2013 | ||
IS | 07.03.2013 | ||
PT | 07.03.2013 | ||
Former [2013/28] | BE | 07.11.2012 | |
FI | 07.11.2012 | ||
HR | 07.11.2012 | ||
LT | 07.11.2012 | ||
LV | 07.11.2012 | ||
NL | 07.11.2012 | ||
PL | 07.11.2012 | ||
SE | 07.11.2012 | ||
SI | 07.11.2012 | ||
NO | 07.02.2013 | ||
GR | 08.02.2013 | ||
IS | 07.03.2013 | ||
PT | 07.03.2013 | ||
Former [2013/27] | BE | 07.11.2012 | |
FI | 07.11.2012 | ||
HR | 07.11.2012 | ||
LT | 07.11.2012 | ||
LV | 07.11.2012 | ||
NL | 07.11.2012 | ||
PL | 07.11.2012 | ||
SE | 07.11.2012 | ||
SI | 07.11.2012 | ||
NO | 07.02.2013 | ||
GR | 08.02.2013 | ||
IS | 07.03.2013 | ||
Former [2013/26] | FI | 07.11.2012 | |
HR | 07.11.2012 | ||
LT | 07.11.2012 | ||
LV | 07.11.2012 | ||
NL | 07.11.2012 | ||
PL | 07.11.2012 | ||
SE | 07.11.2012 | ||
SI | 07.11.2012 | ||
NO | 07.02.2013 | ||
GR | 08.02.2013 | ||
IS | 07.03.2013 | ||
Former [2013/24] | FI | 07.11.2012 | |
HR | 07.11.2012 | ||
LT | 07.11.2012 | ||
LV | 07.11.2012 | ||
NL | 07.11.2012 | ||
PL | 07.11.2012 | ||
SE | 07.11.2012 | ||
NO | 07.02.2013 | ||
GR | 08.02.2013 | ||
IS | 07.03.2013 | ||
Former [2013/23] | FI | 07.11.2012 | |
HR | 07.11.2012 | ||
LT | 07.11.2012 | ||
LV | 07.11.2012 | ||
NL | 07.11.2012 | ||
PL | 07.11.2012 | ||
SE | 07.11.2012 | ||
NO | 07.02.2013 | ||
IS | 07.03.2013 | ||
Former [2013/22] | FI | 07.11.2012 | |
LT | 07.11.2012 | ||
NL | 07.11.2012 | ||
SE | 07.11.2012 | ||
NO | 07.02.2013 | ||
IS | 07.03.2013 | ||
Former [2013/21] | LT | 07.11.2012 | |
SE | 07.11.2012 | ||
NO | 07.02.2013 | ||
Former [2013/20] | LT | 07.11.2012 | |
NO | 07.02.2013 | Documents cited: | Search | [Y]US2005031200 (LEE SANG-SOO [KR], et al) [Y] 1-19 * paragraphs [0003] , [0049] - [0061]; figure 4 *; | [YD]US2006239581 (NEUMAN DARREN [US]) [YD] 1-19 * paragraphs [0074] - [0078]; figures 7a-7b *; | [Y]WO2008149363 (DBLUR TECHNOLOGIES LTD [IL], et al) [Y] 1-19* page 9, lines 14-30; figure 10 * | by applicant | US6148103 | US6782137 | US2006239581 | GB2425670 |