EP2375768 - Test and measurement device, system, and method for providing sychronized measurement views [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 15.12.2017 Database last updated on 30.10.2024 | |
Former | The patent has been granted Status updated on 06.01.2017 | ||
Former | Grant of patent is intended Status updated on 03.01.2017 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): AL, IS | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states Tektronix, Inc. 14150 SW Karl Braun Drive P.O. Box 500, M/S 50-LAW Beaverton, Oregon 97077-0001 / US | [2014/39] |
Former [2011/41] | For all designated states Tektronix, Inc. 14200 SW Karl Braun Drive, P.O. Box 500 Beaverton Oregon 97077-0001 / US | Inventor(s) | 01 /
Zhu, Xinyu 12972 NW Kyla Lane Portland, OR 97229 / US | 02 /
McKibben, Barry A. 16500 SW Timberland Drive Beaverton, OR 97007 / US | 03 /
Melling Jr., Laurent A. 29130 Hale Road Scappoose, OR 97056 / US | 04 /
Ivers, Kevin T. 3417 NW Bridge Road Woodland, WA 98674 / US | 05 /
Overton, Michael S. 9380 SW Palomino Place Beaverton, PA 97008 / US | [2011/41] | Representative(s) | HGF 8th Floor 140 London Wall London EC2Y 5DN / GB | [N/P] |
Former [2017/06] | Clarke, Jeffrey David HGF Limited 140 London Wall London EC2Y 5DN / GB | ||
Former [2011/41] | Clarke, Jeffrey Harrison Goddard Foote 40-43 Chancery Lane London WC2A 1JA / GB | Application number, filing date | 11161204.0 | 05.04.2011 | [2011/41] | Priority number, date | US20100754583 | 05.04.2010 Original published format: US 754583 | [2011/41] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2375768 | Date: | 12.10.2011 | Language: | EN | [2011/41] | Type: | A3 Search report | No.: | EP2375768 | Date: | 10.04.2013 | Language: | EN | [2013/15] | Type: | B1 Patent specification | No.: | EP2375768 | Date: | 08.02.2017 | Language: | EN | [2017/06] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 11.03.2013 | Classification | IPC: | H04N17/00 | [2011/41] | CPC: |
H04N17/00 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/06] |
Former [2011/41] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Test- und Messvorrichtung, System und Verfahren zur Bereitstellung von synchronisierten Messansichten | [2011/41] | English: | Test and measurement device, system, and method for providing sychronized measurement views | [2011/41] | French: | Dispositif de mesure et de test, système et procédé pour la fourniture de visualisations de mesures synchronisées | [2011/41] | Examination procedure | 10.10.2013 | Amendment by applicant (claims and/or description) | 10.10.2013 | Examination requested [2013/47] | 03.06.2014 | Despatch of a communication from the examining division (Time limit: M06) | 03.12.2014 | Reply to a communication from the examining division | 23.08.2016 | Communication of intention to grant the patent | 22.12.2016 | Fee for grant paid | 22.12.2016 | Fee for publishing/printing paid | 22.12.2016 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 03.06.2014 | Opposition(s) | 09.11.2017 | No opposition filed within time limit [2018/03] | Fees paid | Renewal fee | 12.06.2013 | Renewal fee patent year 03 | 28.04.2014 | Renewal fee patent year 04 | 27.04.2015 | Renewal fee patent year 05 | 27.04.2016 | Renewal fee patent year 06 | Penalty fee | Additional fee for renewal fee | 30.04.2013 | 03   M06   Fee paid on   12.06.2013 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.04.2011 | AL | 08.02.2017 | AT | 08.02.2017 | CY | 08.02.2017 | CZ | 08.02.2017 | DK | 08.02.2017 | EE | 08.02.2017 | ES | 08.02.2017 | FI | 08.02.2017 | HR | 08.02.2017 | IT | 08.02.2017 | LT | 08.02.2017 | LV | 08.02.2017 | MC | 08.02.2017 | MK | 08.02.2017 | NL | 08.02.2017 | PL | 08.02.2017 | RO | 08.02.2017 | RS | 08.02.2017 | SE | 08.02.2017 | SI | 08.02.2017 | SK | 08.02.2017 | SM | 08.02.2017 | TR | 08.02.2017 | IE | 05.04.2017 | LU | 05.04.2017 | MT | 05.04.2017 | BE | 30.04.2017 | CH | 30.04.2017 | LI | 30.04.2017 | FR | 02.05.2017 | BG | 08.05.2017 | NO | 08.05.2017 | GR | 09.05.2017 | IS | 08.06.2017 | PT | 08.06.2017 | [2020/33] |
Former [2020/15] | HU | 05.04.2011 | |
AT | 08.02.2017 | ||
CY | 08.02.2017 | ||
CZ | 08.02.2017 | ||
DK | 08.02.2017 | ||
EE | 08.02.2017 | ||
ES | 08.02.2017 | ||
FI | 08.02.2017 | ||
HR | 08.02.2017 | ||
IT | 08.02.2017 | ||
LT | 08.02.2017 | ||
LV | 08.02.2017 | ||
MC | 08.02.2017 | ||
MK | 08.02.2017 | ||
NL | 08.02.2017 | ||
PL | 08.02.2017 | ||
RO | 08.02.2017 | ||
RS | 08.02.2017 | ||
SE | 08.02.2017 | ||
SI | 08.02.2017 | ||
SK | 08.02.2017 | ||
SM | 08.02.2017 | ||
TR | 08.02.2017 | ||
IE | 05.04.2017 | ||
LU | 05.04.2017 | ||
MT | 05.04.2017 | ||
BE | 30.04.2017 | ||
CH | 30.04.2017 | ||
LI | 30.04.2017 | ||
FR | 02.05.2017 | ||
BG | 08.05.2017 | ||
NO | 08.05.2017 | ||
GR | 09.05.2017 | ||
PT | 08.06.2017 | ||
Former [2019/51] | HU | 05.04.2011 | |
AT | 08.02.2017 | ||
CY | 08.02.2017 | ||
CZ | 08.02.2017 | ||
DK | 08.02.2017 | ||
EE | 08.02.2017 | ||
ES | 08.02.2017 | ||
FI | 08.02.2017 | ||
HR | 08.02.2017 | ||
IT | 08.02.2017 | ||
LT | 08.02.2017 | ||
LV | 08.02.2017 | ||
MC | 08.02.2017 | ||
MK | 08.02.2017 | ||
NL | 08.02.2017 | ||
PL | 08.02.2017 | ||
RO | 08.02.2017 | ||
RS | 08.02.2017 | ||
SE | 08.02.2017 | ||
SI | 08.02.2017 | ||
SK | 08.02.2017 | ||
SM | 08.02.2017 | ||
IE | 05.04.2017 | ||
LU | 05.04.2017 | ||
MT | 05.04.2017 | ||
BE | 30.04.2017 | ||
CH | 30.04.2017 | ||
LI | 30.04.2017 | ||
FR | 02.05.2017 | ||
BG | 08.05.2017 | ||
NO | 08.05.2017 | ||
GR | 09.05.2017 | ||
PT | 08.06.2017 | ||
Former [2019/46] | HU | 05.04.2011 | |
AT | 08.02.2017 | ||
CY | 08.02.2017 | ||
CZ | 08.02.2017 | ||
DK | 08.02.2017 | ||
EE | 08.02.2017 | ||
ES | 08.02.2017 | ||
FI | 08.02.2017 | ||
HR | 08.02.2017 | ||
IT | 08.02.2017 | ||
LT | 08.02.2017 | ||
LV | 08.02.2017 | ||
MC | 08.02.2017 | ||
NL | 08.02.2017 | ||
PL | 08.02.2017 | ||
RO | 08.02.2017 | ||
RS | 08.02.2017 | ||
SE | 08.02.2017 | ||
SI | 08.02.2017 | ||
SK | 08.02.2017 | ||
SM | 08.02.2017 | ||
IE | 05.04.2017 | ||
LU | 05.04.2017 | ||
MT | 05.04.2017 | ||
BE | 30.04.2017 | ||
CH | 30.04.2017 | ||
LI | 30.04.2017 | ||
FR | 02.05.2017 | ||
BG | 08.05.2017 | ||
NO | 08.05.2017 | ||
GR | 09.05.2017 | ||
PT | 08.06.2017 | ||
Former [2019/31] | HU | 05.04.2011 | |
AT | 08.02.2017 | ||
CZ | 08.02.2017 | ||
DK | 08.02.2017 | ||
EE | 08.02.2017 | ||
ES | 08.02.2017 | ||
FI | 08.02.2017 | ||
HR | 08.02.2017 | ||
IT | 08.02.2017 | ||
LT | 08.02.2017 | ||
LV | 08.02.2017 | ||
MC | 08.02.2017 | ||
NL | 08.02.2017 | ||
PL | 08.02.2017 | ||
RO | 08.02.2017 | ||
RS | 08.02.2017 | ||
SE | 08.02.2017 | ||
SI | 08.02.2017 | ||
SK | 08.02.2017 | ||
SM | 08.02.2017 | ||
IE | 05.04.2017 | ||
LU | 05.04.2017 | ||
MT | 05.04.2017 | ||
BE | 30.04.2017 | ||
CH | 30.04.2017 | ||
LI | 30.04.2017 | ||
FR | 02.05.2017 | ||
BG | 08.05.2017 | ||
NO | 08.05.2017 | ||
GR | 09.05.2017 | ||
PT | 08.06.2017 | ||
Former [2018/43] | AT | 08.02.2017 | |
CZ | 08.02.2017 | ||
DK | 08.02.2017 | ||
EE | 08.02.2017 | ||
ES | 08.02.2017 | ||
FI | 08.02.2017 | ||
HR | 08.02.2017 | ||
IT | 08.02.2017 | ||
LT | 08.02.2017 | ||
LV | 08.02.2017 | ||
MC | 08.02.2017 | ||
NL | 08.02.2017 | ||
PL | 08.02.2017 | ||
RO | 08.02.2017 | ||
RS | 08.02.2017 | ||
SE | 08.02.2017 | ||
SI | 08.02.2017 | ||
SK | 08.02.2017 | ||
SM | 08.02.2017 | ||
IE | 05.04.2017 | ||
LU | 05.04.2017 | ||
MT | 05.04.2017 | ||
BE | 30.04.2017 | ||
CH | 30.04.2017 | ||
LI | 30.04.2017 | ||
FR | 02.05.2017 | ||
BG | 08.05.2017 | ||
NO | 08.05.2017 | ||
GR | 09.05.2017 | ||
PT | 08.06.2017 | ||
Former [2018/23] | AT | 08.02.2017 | |
CZ | 08.02.2017 | ||
DK | 08.02.2017 | ||
EE | 08.02.2017 | ||
ES | 08.02.2017 | ||
FI | 08.02.2017 | ||
HR | 08.02.2017 | ||
IT | 08.02.2017 | ||
LT | 08.02.2017 | ||
LV | 08.02.2017 | ||
MC | 08.02.2017 | ||
NL | 08.02.2017 | ||
PL | 08.02.2017 | ||
RO | 08.02.2017 | ||
RS | 08.02.2017 | ||
SE | 08.02.2017 | ||
SI | 08.02.2017 | ||
SK | 08.02.2017 | ||
SM | 08.02.2017 | ||
IE | 05.04.2017 | ||
LU | 05.04.2017 | ||
BE | 30.04.2017 | ||
CH | 30.04.2017 | ||
LI | 30.04.2017 | ||
FR | 02.05.2017 | ||
BG | 08.05.2017 | ||
NO | 08.05.2017 | ||
GR | 09.05.2017 | ||
PT | 08.06.2017 | ||
Former [2018/13] | AT | 08.02.2017 | |
CZ | 08.02.2017 | ||
DK | 08.02.2017 | ||
EE | 08.02.2017 | ||
ES | 08.02.2017 | ||
FI | 08.02.2017 | ||
HR | 08.02.2017 | ||
IT | 08.02.2017 | ||
LT | 08.02.2017 | ||
LV | 08.02.2017 | ||
MC | 08.02.2017 | ||
NL | 08.02.2017 | ||
PL | 08.02.2017 | ||
RO | 08.02.2017 | ||
RS | 08.02.2017 | ||
SE | 08.02.2017 | ||
SI | 08.02.2017 | ||
SK | 08.02.2017 | ||
SM | 08.02.2017 | ||
LU | 05.04.2017 | ||
CH | 30.04.2017 | ||
LI | 30.04.2017 | ||
FR | 02.05.2017 | ||
BG | 08.05.2017 | ||
NO | 08.05.2017 | ||
GR | 09.05.2017 | ||
PT | 08.06.2017 | ||
Former [2018/07] | AT | 08.02.2017 | |
CZ | 08.02.2017 | ||
DK | 08.02.2017 | ||
EE | 08.02.2017 | ||
ES | 08.02.2017 | ||
FI | 08.02.2017 | ||
HR | 08.02.2017 | ||
IT | 08.02.2017 | ||
LT | 08.02.2017 | ||
LV | 08.02.2017 | ||
MC | 08.02.2017 | ||
NL | 08.02.2017 | ||
PL | 08.02.2017 | ||
RO | 08.02.2017 | ||
RS | 08.02.2017 | ||
SE | 08.02.2017 | ||
SK | 08.02.2017 | ||
SM | 08.02.2017 | ||
FR | 02.05.2017 | ||
BG | 08.05.2017 | ||
NO | 08.05.2017 | ||
GR | 09.05.2017 | ||
PT | 08.06.2017 | ||
Former [2018/06] | AT | 08.02.2017 | |
CZ | 08.02.2017 | ||
DK | 08.02.2017 | ||
EE | 08.02.2017 | ||
ES | 08.02.2017 | ||
FI | 08.02.2017 | ||
HR | 08.02.2017 | ||
IT | 08.02.2017 | ||
LT | 08.02.2017 | ||
LV | 08.02.2017 | ||
MC | 08.02.2017 | ||
NL | 08.02.2017 | ||
PL | 08.02.2017 | ||
RO | 08.02.2017 | ||
RS | 08.02.2017 | ||
SE | 08.02.2017 | ||
SK | 08.02.2017 | ||
SM | 08.02.2017 | ||
BG | 08.05.2017 | ||
NO | 08.05.2017 | ||
GR | 09.05.2017 | ||
PT | 08.06.2017 | ||
Former [2017/51] | AT | 08.02.2017 | |
CZ | 08.02.2017 | ||
DK | 08.02.2017 | ||
EE | 08.02.2017 | ||
ES | 08.02.2017 | ||
FI | 08.02.2017 | ||
HR | 08.02.2017 | ||
IT | 08.02.2017 | ||
LT | 08.02.2017 | ||
LV | 08.02.2017 | ||
NL | 08.02.2017 | ||
PL | 08.02.2017 | ||
RO | 08.02.2017 | ||
RS | 08.02.2017 | ||
SE | 08.02.2017 | ||
SK | 08.02.2017 | ||
SM | 08.02.2017 | ||
BG | 08.05.2017 | ||
NO | 08.05.2017 | ||
GR | 09.05.2017 | ||
PT | 08.06.2017 | ||
Former [2017/50] | AT | 08.02.2017 | |
CZ | 08.02.2017 | ||
DK | 08.02.2017 | ||
EE | 08.02.2017 | ||
ES | 08.02.2017 | ||
FI | 08.02.2017 | ||
HR | 08.02.2017 | ||
IT | 08.02.2017 | ||
LT | 08.02.2017 | ||
LV | 08.02.2017 | ||
NL | 08.02.2017 | ||
PL | 08.02.2017 | ||
RO | 08.02.2017 | ||
RS | 08.02.2017 | ||
SE | 08.02.2017 | ||
SK | 08.02.2017 | ||
BG | 08.05.2017 | ||
NO | 08.05.2017 | ||
GR | 09.05.2017 | ||
PT | 08.06.2017 | ||
Former [2017/49] | AT | 08.02.2017 | |
CZ | 08.02.2017 | ||
EE | 08.02.2017 | ||
ES | 08.02.2017 | ||
FI | 08.02.2017 | ||
HR | 08.02.2017 | ||
IT | 08.02.2017 | ||
LT | 08.02.2017 | ||
LV | 08.02.2017 | ||
NL | 08.02.2017 | ||
RO | 08.02.2017 | ||
RS | 08.02.2017 | ||
SE | 08.02.2017 | ||
SK | 08.02.2017 | ||
BG | 08.05.2017 | ||
NO | 08.05.2017 | ||
GR | 09.05.2017 | ||
PT | 08.06.2017 | ||
Former [2017/48] | AT | 08.02.2017 | |
CZ | 08.02.2017 | ||
ES | 08.02.2017 | ||
FI | 08.02.2017 | ||
HR | 08.02.2017 | ||
LT | 08.02.2017 | ||
LV | 08.02.2017 | ||
NL | 08.02.2017 | ||
RS | 08.02.2017 | ||
SE | 08.02.2017 | ||
BG | 08.05.2017 | ||
NO | 08.05.2017 | ||
GR | 09.05.2017 | ||
PT | 08.06.2017 | ||
Former [2017/41] | AT | 08.02.2017 | |
ES | 08.02.2017 | ||
FI | 08.02.2017 | ||
HR | 08.02.2017 | ||
LT | 08.02.2017 | ||
LV | 08.02.2017 | ||
NL | 08.02.2017 | ||
RS | 08.02.2017 | ||
SE | 08.02.2017 | ||
BG | 08.05.2017 | ||
NO | 08.05.2017 | ||
GR | 09.05.2017 | ||
PT | 08.06.2017 | Documents cited: | Search | [XY]US4677481 (NICHOLAS DAN H [US]) [X] 11 * the whole document * [Y] 2-6; | [XAY]EP0336594 (MAGNI SYSTEMS INC [US]) [X] 1,7,11 * the whole document * [A] 12-15 [Y] 2-6,8-10; | [Y]US2004218044 (BAKER DANIEL G [US]) [Y] 8-10 * the whole document *; | [Y]US6532024 (EVERETT MARK J [US], et al) [Y] 8-10 * the whole document *; | [A]US5629957 (MURATA HIROYASU [JP]) [A] 1,7,11 * the whole document * | Examination | WO0067490 | JP2002344997 |