blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2394865

EP2394865 - Method and device for diagnosing the functioning of an energy supply device [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  17.04.2020
Database last updated on 11.09.2024
FormerThe patent has been granted
Status updated on  10.05.2019
FormerGrant of patent is intended
Status updated on  13.12.2018
FormerExamination is in progress
Status updated on  07.12.2016
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Robert Bosch GmbH
Postfach 30 02 20
70442 Stuttgart / DE
[2020/18]
Former [2011/50]For all designated states
Robert Bosch GmbH
C/IPE Postfach 30 02 20
70442 Stuttgart / DE
Inventor(s)01 / Jousse, Alain
Hermann-Pleuer-Str. 35
70192, Stuttgart / DE
 [2011/50]
Representative(s)(deleted)
[2011/50]
Application number, filing date11161855.911.04.2011
[2011/50]
Priority number, dateDE2010104310029.10.2010         Original published format: DE102010043100
DE2010102992710.06.2010         Original published format: DE102010029927
[2011/50]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP2394865
Date:14.12.2011
Language:DE
[2011/50]
Type: B1 Patent specification 
No.:EP2394865
Date:12.06.2019
Language:DE
[2019/24]
Search report(s)(Supplementary) European search report - dispatched on:EP05.10.2011
ClassificationIPC:B60R21/017
[2011/50]
CPC:
B60R21/0173 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/24]
Former [2011/50]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Verfahren und Vorrichtung zur Diagnose einer Funktionsfähigkeit einer Energieversorgungseinrichtung[2011/50]
English:Method and device for diagnosing the functioning of an energy supply device[2011/50]
French:Procédé et dispositif de diagnostic du fonctionnement d'un dispositif d'alimentation d'énergie[2011/50]
Examination procedure29.05.2012Amendment by applicant (claims and/or description)
14.06.2012Examination requested  [2012/31]
04.11.2013Despatch of a communication from the examining division (Time limit: M06)
03.07.2014Reply to a communication from the examining division
03.11.2014Despatch of a communication from the examining division (Time limit: M04)
11.03.2015Reply to a communication from the examining division
28.11.2016Despatch of a communication from the examining division (Time limit: M06)
10.07.2017Reply to a communication from the examining division
13.11.2017Despatch of a communication from the examining division (Time limit: M04)
19.04.2018Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
29.06.2018Reply to a communication from the examining division
14.12.2018Communication of intention to grant the patent
02.04.2019Fee for grant paid
02.04.2019Fee for publishing/printing paid
02.04.2019Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  04.11.2013
Opposition(s)13.03.2020No opposition filed within time limit [2020/21]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
29.06.2018Request for further processing filed
29.06.2018Full payment received (date of receipt of payment)
Request granted
13.07.2018Decision despatched
The application is deemed to be withdrawn due to failure to reply to the examination report
10.07.2017Request for further processing filed
10.07.2017Full payment received (date of receipt of payment)
Request granted
21.07.2017Decision despatched
The application is deemed to be withdrawn due to failure to reply to the examination report
03.07.2014Request for further processing filed
03.07.2014Full payment received (date of receipt of payment)
Request granted
16.07.2014Decision despatched
Fees paidRenewal fee
02.05.2013Renewal fee patent year 03
30.04.2014Renewal fee patent year 04
30.04.2015Renewal fee patent year 05
02.05.2016Renewal fee patent year 06
02.05.2017Renewal fee patent year 07
30.04.2018Renewal fee patent year 08
30.04.2019Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU11.04.2011
AL12.06.2019
CY12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
MC12.06.2019
MK12.06.2019
MT12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SI12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
PT14.10.2019
IS12.11.2019
[2022/32]
Former [2022/27]HU11.04.2011
AL12.06.2019
CY12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
MC12.06.2019
MT12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SI12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
PT14.10.2019
IS12.11.2019
Former [2020/52]AL12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
MC12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SI12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
PT14.10.2019
IS12.11.2019
Former [2020/36]AL12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SI12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
PT14.10.2019
IS12.11.2019
Former [2020/24]AL12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SI12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
PT14.10.2019
IS24.02.2020
Former [2020/22]AL12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/17]AL12.06.2019
CZ12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/13]AL12.06.2019
CZ12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
SK12.06.2019
SM12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/12]AL12.06.2019
CZ12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
SK12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/11]AL12.06.2019
CZ12.06.2019
EE12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
SK12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
PT14.10.2019
Former [2020/10]AL12.06.2019
CZ12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
PT14.10.2019
Former [2020/09]AL12.06.2019
CZ12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RS12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
Former [2020/07]AL12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RS12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
Former [2019/51]AL12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
RS12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
Former [2019/50]AL12.06.2019
ES12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
RS12.06.2019
NO12.09.2019
GR13.09.2019
Former [2019/47]ES12.06.2019
FI12.06.2019
LT12.06.2019
NO12.09.2019
Documents cited:Search[XA]EP0752592  (TELEFUNKEN MICROELECTRON [DE]) [X] 10 * claim - * [A] 1,9;
 [XA]DE19815391  (DENSO CORP [JP]) [X] 10 * the whole document * [A] 1,9;
 [XA]DE19837167  (DAIMLER CHRYSLER AG [DE]) [X] 10 * the whole document * [A] 1,9;
 [AD]DE102004010135  (BOSCH GMBH ROBERT [DE])[AD] 1,9,10
by applicantDE102004010135
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.