EP2381486 - Method for forming back contact electrodes for cadmium telluride photovoltaic cells [Right-click to bookmark this link] | |||
Former [2011/43] | Methods for forming back contact electrodes for cadmium telluride photovoltaic cells | ||
[2019/52] | Status | No opposition filed within time limit Status updated on 09.04.2021 Database last updated on 31.05.2024 | |
Former | The patent has been granted Status updated on 01.05.2020 | ||
Former | Grant of patent is intended Status updated on 12.01.2020 | ||
Former | Examination is in progress Status updated on 01.12.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states First Solar Malaysia SDN.BHD No 8, Jalan Hi-Tech 3/3 Zon Industri Fasa 3 Kulim Hi-Tech Park, 09000 Kulim Kedah Darul Aman / MY | [2014/04] |
Former [2011/43] | For all designated states General Electric Company a New York Company 1 River Road Schenectady, NY 12345 / US | Inventor(s) | 01 /
Korevaar, Bastiaan Arie GE Global Research 1 Research Circle Building K1- Niskayuna, NY 12309 / US | 02 /
Rojo, Juan Carlos GE Global Research 1 Research Circle Building K1- Niskayuna, NY 12309 / US | 03 /
Shuba, Roman GE Global Research 1 Research Circle Building K1 Niskayuna, NY 12309 / US | [2011/43] | Representative(s) | Thurston, Joanna, et al Withers & Rogers LLP 2 London Bridge London SE1 9RA / GB | [N/P] |
Former [2013/42] | Thurston, Joanna, et al Withers & Rogers LLP 4 More London Riverside London SE1 2AU / GB | ||
Former [2011/43] | Bedford, Grant Richard Global Patent Operation - Europe GE International Inc. 15 John Adam Street London WC2N 6LU / GB | Application number, filing date | 11163286.5 | 20.04.2011 | [2011/43] | Priority number, date | US20100765225 | 22.04.2010 Original published format: US 765225 | [2011/43] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2381486 | Date: | 26.10.2011 | Language: | EN | [2011/43] | Type: | A3 Search report | No.: | EP2381486 | Date: | 15.04.2015 | Language: | EN | [2015/16] | Type: | B1 Patent specification | No.: | EP2381486 | Date: | 03.06.2020 | Language: | EN | [2020/23] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 16.03.2015 | Classification | IPC: | H01L31/0224, H01L31/18, H01L31/073 | [2019/52] | CPC: |
H01L31/022425 (EP,US);
H01L31/022441 (US);
H01L31/0296 (US);
H01L31/073 (EP,US);
H01L33/0083 (US);
Y02E10/543 (EP,US)
|
Former IPC [2015/16] | H01L31/0224, H01L31/18 | ||
Former IPC [2011/43] | H01L31/18, H01L31/0224 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/52] |
Former [2011/43] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Verfahren zur Herstellung der Rückkontaktelektroden für Cadmiumtellurid-Photovoltaikzellen | [2011/43] | English: | Method for forming back contact electrodes for cadmium telluride photovoltaic cells | [2019/52] | French: | Procédé de formation d'électrodes de contact arrière pour cellules photovoltaïques en tellurure de cadmium | [2019/52] |
Former [2011/43] | Methods for forming back contact electrodes for cadmium telluride photovoltaic cells | ||
Former [2011/43] | Procédés de formation d'électrodes de contact arrière pour cellules photovoltaïques en tellurure de cadmium | Examination procedure | 14.10.2015 | Amendment by applicant (claims and/or description) | 11.11.2015 | Examination requested [2015/52] | 04.12.2017 | Despatch of a communication from the examining division (Time limit: M06) | 03.04.2018 | Reply to a communication from the examining division | 20.11.2019 | Cancellation of oral proceeding that was planned for 26.11.2019 | 26.11.2019 | Date of oral proceedings (cancelled) | 13.01.2020 | Communication of intention to grant the patent | 25.03.2020 | Fee for grant paid | 25.03.2020 | Fee for publishing/printing paid | 25.03.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 04.12.2017 | Opposition(s) | 04.03.2021 | No opposition filed within time limit [2021/19] | Request for further processing for: | The application is deemed to be withdrawn due to non-payment of the examination fee | 11.11.2015 | Request for further processing filed | 11.11.2015 | Full payment received (date of receipt of payment) Request granted | 23.11.2015 | Decision despatched | The application is deemed to be withdrawn due to non-payment of designation fees TR, SM, SK, SI, SE, RS, RO, PT, PL, NO, NL, MT, MK, MC, LV, LU, LT, IT, IS, IE, HU, HR, GR, GB, FR, FI, ES, EE, DK, DE, CZ, CY, CH, BG, BE, AT, AL | 11.11.2015 | Request for further processing filed | 11.11.2015 | Full payment received (date of receipt of payment) Request granted | 23.11.2015 | Decision despatched | Fees paid | Renewal fee | 02.05.2013 | Renewal fee patent year 03 | 28.04.2014 | Renewal fee patent year 04 | 27.04.2015 | Renewal fee patent year 05 | 27.04.2016 | Renewal fee patent year 06 | 27.04.2017 | Renewal fee patent year 07 | 27.04.2018 | Renewal fee patent year 08 | 29.04.2019 | Renewal fee patent year 09 | 27.04.2020 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.04.2011 | AL | 03.06.2020 | AT | 03.06.2020 | CY | 03.06.2020 | CZ | 03.06.2020 | DK | 03.06.2020 | EE | 03.06.2020 | ES | 03.06.2020 | FI | 03.06.2020 | HR | 03.06.2020 | IT | 03.06.2020 | LT | 03.06.2020 | LV | 03.06.2020 | MC | 03.06.2020 | MK | 03.06.2020 | NL | 03.06.2020 | PL | 03.06.2020 | RO | 03.06.2020 | RS | 03.06.2020 | SE | 03.06.2020 | SI | 03.06.2020 | SK | 03.06.2020 | SM | 03.06.2020 | BG | 03.09.2020 | NO | 03.09.2020 | GR | 04.09.2020 | IS | 03.10.2020 | PT | 06.10.2020 | [2024/22] |
Former [2023/29] | HU | 20.04.2011 | |
AL | 03.06.2020 | ||
AT | 03.06.2020 | ||
CY | 03.06.2020 | ||
CZ | 03.06.2020 | ||
DK | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
IT | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
MC | 03.06.2020 | ||
NL | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SI | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2023/24] | AL | 03.06.2020 | |
AT | 03.06.2020 | ||
CY | 03.06.2020 | ||
CZ | 03.06.2020 | ||
DK | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
IT | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
MC | 03.06.2020 | ||
NL | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SI | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2022/13] | AL | 03.06.2020 | |
AT | 03.06.2020 | ||
CZ | 03.06.2020 | ||
DK | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
IT | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
MC | 03.06.2020 | ||
NL | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SI | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2022/10] | AL | 03.06.2020 | |
AT | 03.06.2020 | ||
CZ | 03.06.2020 | ||
DK | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
IT | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
MC | 03.06.2020 | ||
NL | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SI | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
PT | 06.10.2020 | ||
Former [2021/50] | AL | 03.06.2020 | |
AT | 03.06.2020 | ||
CZ | 03.06.2020 | ||
DK | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
IT | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
MC | 03.06.2020 | ||
NL | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SI | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2021/24] | AL | 03.06.2020 | |
AT | 03.06.2020 | ||
CZ | 03.06.2020 | ||
DK | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
IT | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
NL | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SI | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2021/20] | AL | 03.06.2020 | |
AT | 03.06.2020 | ||
CZ | 03.06.2020 | ||
DK | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
IT | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
NL | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2021/10] | AL | 03.06.2020 | |
AT | 03.06.2020 | ||
CZ | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
IT | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
NL | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2021/09] | AL | 03.06.2020 | |
AT | 03.06.2020 | ||
CZ | 03.06.2020 | ||
EE | 03.06.2020 | ||
ES | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
IT | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
NL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
PT | 06.10.2020 | ||
Former [2021/04] | AL | 03.06.2020 | |
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
NL | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
Former [2021/01] | FI | 03.06.2020 | |
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
Former [2020/51] | FI | 03.06.2020 | |
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
RS | 03.06.2020 | ||
SE | 03.06.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
Former [2020/50] | FI | 03.06.2020 | |
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
SE | 03.06.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
Former [2020/48] | FI | 03.06.2020 | |
LT | 03.06.2020 | ||
SE | 03.06.2020 | ||
NO | 03.09.2020 | ||
Former [2020/47] | LT | 03.06.2020 | |
NO | 03.09.2020 | Documents cited: | Search | [A]US5501744 (ALBRIGHT SCOT P [US], et al) [A] 1-10* column 49, lines 45-52 *; | [XAI]WO03032406 (SOLAR SYSTEMS & EQUIPMENTS S R [IT], et al) [X] 9 * page 2, line 25 - page 3, line 16 * [A] 1-8 [I] 10; | [XAI]US2004063326 (SZLUFCIK JOZEF [BE], et al) [X] 1,9 * page 4, paragraph 57 - page 5, paragraph 62 * * figure 3 * [A] 4-8 [I] 2,3 | Examination | - MCCANDLESS B E ET AL, "Processing options for CdTe thin film solar cells", SOLAR ENE, PERGAMON PRESS. OXFORD, GB, (20041201), vol. 77, no. 6, doi:10.1016/J.SOLENER.2004.04.012, ISSN 0038-092X, pages 839 - 856, XP004661825 DOI: http://dx.doi.org/10.1016/j.solener.2004.04.012 |