blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2388666

EP2388666 - System and method for enhancement of power generation facilities [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  03.07.2020
Database last updated on 05.10.2024
FormerThe patent has been granted
Status updated on  31.05.2019
FormerGrant of patent is intended
Status updated on  02.01.2019
FormerExamination is in progress
Status updated on  11.11.2016
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
GENERAL ELECTRIC COMPANY
1 River Road
Schenectady, NY 12345 / US
[2011/47]
Inventor(s)01 / Long, Christopher Eugene
300 Garlington Road
P O Box 648
Greenville, SC 29615 / US
02 / Iasillo, Robert Joseph
4200 Wildwood Parkway NE
42-3-2C-08
Atlanta, GA 30339 / US
03 / Thatcher, Jonathan Carl
300 Garlington Road
P O Box 648
Greenville, SC 29615 / US
04 / McCarthy, Kevin Thomas
6 Northstar Drive
Troy, NY 12180 / US
05 / Vittal, Sameer
4200 Wildwood Parkway NE
Room 03-12C-04
Atlanta, GA 30339 / US
 [2011/47]
Representative(s)Rüger Abel Patentanwälte PartGmbB
Postfach 10 04 61
73704 Esslingen a.N. / DE
[N/P]
Former [2019/27]Rüger Abel
Patentanwälte
Postfach 10 04 61
73704 Esslingen a.N. / DE
Former [2011/47]Bedford, Grant Richard
Global Patent Operation - Europe GE International Inc. 15 John Adam Street
London WC2N 6LU / GB
Application number, filing date11165530.410.05.2011
[2011/47]
Priority number, dateUS2010078177517.05.2010         Original published format: US 781775
[2011/47]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2388666
Date:23.11.2011
Language:EN
[2011/47]
Type: A3 Search report 
No.:EP2388666
Date:30.10.2013
Language:EN
[2013/44]
Type: B1 Patent specification 
No.:EP2388666
Date:03.07.2019
Language:EN
[2019/27]
Search report(s)(Supplementary) European search report - dispatched on:EP27.09.2013
ClassificationIPC:G06Q10/06, G05B17/02
[2019/02]
CPC:
G06Q10/063 (EP,US); G05B17/02 (EP,US); Y04S10/50 (EP)
Former IPC [2011/47]G05B17/02
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/27]
Former [2011/47]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:System und Verfahren zur Verbesserung von Stromerzeugungsanlagen[2011/47]
English:System and method for enhancement of power generation facilities[2011/47]
French:Système et procédé d'amélioration des installations de génération de puissance[2011/47]
Examination procedure24.04.2014Amendment by applicant (claims and/or description)
30.04.2014Examination requested  [2014/24]
27.10.2015Despatch of a communication from the examining division (Time limit: M06)
06.05.2016Reply to a communication from the examining division
23.05.2016Despatch of a communication from the examining division (Time limit: M06)
09.11.2016Reply to a communication from the examining division
03.01.2019Communication of intention to grant the patent
25.04.2019Fee for grant paid
25.04.2019Fee for publishing/printing paid
25.04.2019Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  27.10.2015
Opposition(s)03.06.2020No opposition filed within time limit [2020/32]
Fees paidRenewal fee
31.05.2013Renewal fee patent year 03
12.06.2014Renewal fee patent year 04
01.06.2015Renewal fee patent year 05
31.05.2016Renewal fee patent year 06
31.05.2017Renewal fee patent year 07
01.06.2018Renewal fee patent year 08
21.05.2019Renewal fee patent year 09
Penalty fee
Additional fee for renewal fee
31.05.201404   M06   Fee paid on   01.12.2014
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU10.05.2011
AL03.07.2019
AT03.07.2019
CY03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
MC03.07.2019
MK03.07.2019
MT03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SE03.07.2019
SI03.07.2019
SK03.07.2019
SM03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
IS03.11.2019
PT04.11.2019
IE10.05.2020
LU10.05.2020
BE31.05.2020
CH31.05.2020
FR31.05.2020
LI31.05.2020
[2022/32]
Former [2022/27]HU10.05.2011
AL03.07.2019
AT03.07.2019
CY03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
MC03.07.2019
MT03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SE03.07.2019
SI03.07.2019
SK03.07.2019
SM03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
IS03.11.2019
PT04.11.2019
IE10.05.2020
LU10.05.2020
BE31.05.2020
CH31.05.2020
FR31.05.2020
LI31.05.2020
Former [2021/23]AL03.07.2019
AT03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
MC03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SE03.07.2019
SI03.07.2019
SK03.07.2019
SM03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
IS03.11.2019
PT04.11.2019
IE10.05.2020
LU10.05.2020
BE31.05.2020
CH31.05.2020
FR31.05.2020
LI31.05.2020
Former [2021/20]AL03.07.2019
AT03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
MC03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SE03.07.2019
SI03.07.2019
SK03.07.2019
SM03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
IS03.11.2019
PT04.11.2019
IE10.05.2020
LU10.05.2020
CH31.05.2020
LI31.05.2020
Former [2021/15]AL03.07.2019
AT03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
MC03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SE03.07.2019
SI03.07.2019
SK03.07.2019
SM03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
IS03.11.2019
PT04.11.2019
LU10.05.2020
CH31.05.2020
LI31.05.2020
Former [2021/12]AL03.07.2019
AT03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
MC03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SE03.07.2019
SI03.07.2019
SK03.07.2019
SM03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
IS03.11.2019
PT04.11.2019
CH31.05.2020
LI31.05.2020
Former [2021/08]AL03.07.2019
AT03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SE03.07.2019
SI03.07.2019
SK03.07.2019
SM03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
IS03.11.2019
PT04.11.2019
CH31.05.2020
LI31.05.2020
Former [2020/37]AL03.07.2019
AT03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SE03.07.2019
SI03.07.2019
SK03.07.2019
SM03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
IS03.11.2019
PT04.11.2019
Former [2020/36]AL03.07.2019
AT03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SE03.07.2019
SK03.07.2019
SM03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
IS03.11.2019
PT04.11.2019
Former [2020/27]AL03.07.2019
AT03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SE03.07.2019
SK03.07.2019
SM03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
PT04.11.2019
IS24.02.2020
Former [2020/25]AL03.07.2019
AT03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SE03.07.2019
SK03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
PT04.11.2019
IS24.02.2020
Former [2020/24]AL03.07.2019
AT03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SE03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
PT04.11.2019
IS24.02.2020
Former [2020/23]AL03.07.2019
AT03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SE03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
IS03.11.2019
PT04.11.2019
Former [2020/22]AL03.07.2019
AT03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
RS03.07.2019
SE03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
IS03.11.2019
PT04.11.2019
Former [2020/17]AL03.07.2019
AT03.07.2019
CZ03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
RS03.07.2019
SE03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
IS03.11.2019
PT04.11.2019
Former [2020/15]AL03.07.2019
AT03.07.2019
CZ03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
RS03.07.2019
SE03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
IS03.11.2019
PT04.11.2019
Former [2020/12]AT03.07.2019
CZ03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
RS03.07.2019
SE03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
IS03.11.2019
PT04.11.2019
Former [2020/11]AT03.07.2019
CZ03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
RS03.07.2019
SE03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
PT04.11.2019
Former [2020/10]AT03.07.2019
CZ03.07.2019
FI03.07.2019
LT03.07.2019
NL03.07.2019
SE03.07.2019
BG03.10.2019
NO03.10.2019
PT04.11.2019
Former [2020/09]CZ03.07.2019
FI03.07.2019
LT03.07.2019
NL03.07.2019
NO03.10.2019
Former [2020/08]LT03.07.2019
NL03.07.2019
NO03.10.2019
Former [2020/07]NL03.07.2019
Documents cited:Search[A]US2010100248  (MINTO KARL DEAN [US], et al) [A] 1 * paragraph [0034] ** paragraph [0041]; figure 1 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.