blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2388524

EP2388524 - System for cooling turbine combustor transition piece [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  25.11.2022
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  17.12.2021
FormerGrant of patent is intended
Status updated on  25.08.2021
FormerExamination is in progress
Status updated on  06.03.2020
FormerRequest for examination was made
Status updated on  28.09.2018
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
General Electric Company
1 River Road
Schenectady, NY 12345 / US
[2022/03]
Former [2011/47]For all designated states
General Electric Company
a New York Company 1 River Road
Schenectady, NY 12345 / US
Inventor(s)01 / CHILA, Ronald James
300 Garlington Road
Greenville, SC 29615 / US
02 / CIHLAR, David William
300 Garlington Road
Greenville, SC 29615 / US
 [2011/47]
Representative(s)Novagraaf Group
Chemin de l'Echo 3
1213 Onex / CH
[2022/03]
Former [2013/08]Cleary, Fidelma, et al
GE International Inc.
Global Patent Operation-Europe
15 John Adam Street
London WC2N 6LU / GB
Former [2011/47]Gray, Thomas
GE International Inc. Global Patent Operation - Europe 15 John Adam Street
London WC2N 6LU / GB
Application number, filing date11166702.819.05.2011
[2011/47]
Priority number, dateUS2010078447720.05.2010         Original published format: US 784477
[2011/47]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2388524
Date:23.11.2011
Language:EN
[2011/47]
Type: A3 Search report 
No.:EP2388524
Date:21.03.2018
Language:EN
[2018/12]
Type: B1 Patent specification 
No.:EP2388524
Date:19.01.2022
Language:EN
[2022/03]
Search report(s)(Supplementary) European search report - dispatched on:EP16.02.2018
ClassificationIPC:F23R3/00, F01D9/02
[2011/47]
CPC:
F23R3/002 (EP,US); F01D9/023 (EP,US); F02C7/12 (EP,US);
Y02T50/60 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/44]
Former [2011/47]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:System zur Kühlung eines Turbinenbrenner-Übergangsstücks[2011/47]
English:System for cooling turbine combustor transition piece[2011/47]
French:Système de refroidissement d'une pièce de transition d'une chambre de combustion de turbine[2011/47]
Examination procedure19.05.2011Date on which the examining division has become responsible
11.09.2018Amendment by applicant (claims and/or description)
21.09.2018Examination requested  [2018/44]
10.03.2020Despatch of a communication from the examining division (Time limit: M06)
02.07.2020Reply to a communication from the examining division
07.08.2020Despatch of a communication from the examining division (Time limit: M06)
26.01.2021Reply to a communication from the examining division
05.02.2021Despatch of a communication from the examining division (Time limit: M06)
30.07.2021Reply to a communication from the examining division
26.08.2021Communication of intention to grant the patent
08.12.2021Fee for grant paid
08.12.2021Fee for publishing/printing paid
08.12.2021Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  10.03.2020
Opposition(s)20.10.2022No opposition filed within time limit [2022/52]
Fees paidRenewal fee
31.05.2013Renewal fee patent year 03
12.06.2014Renewal fee patent year 04
01.06.2015Renewal fee patent year 05
31.05.2016Renewal fee patent year 06
31.05.2017Renewal fee patent year 07
01.06.2018Renewal fee patent year 08
21.05.2019Renewal fee patent year 09
20.05.2020Renewal fee patent year 10
19.05.2021Renewal fee patent year 11
Penalty fee
Additional fee for renewal fee
31.05.201404   M06   Fee paid on   01.12.2014
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU19.05.2011
AL19.01.2022
AT19.01.2022
CY19.01.2022
CZ19.01.2022
DK19.01.2022
EE19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
IT19.01.2022
LT19.01.2022
LV19.01.2022
MC19.01.2022
MK19.01.2022
NL19.01.2022
PL19.01.2022
RO19.01.2022
RS19.01.2022
SE19.01.2022
SI19.01.2022
SK19.01.2022
SM19.01.2022
TR19.01.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
GB19.05.2022
IE19.05.2022
IS19.05.2022
LU19.05.2022
PT19.05.2022
BE31.05.2022
CH31.05.2022
FR31.05.2022
LI31.05.2022
[2024/29]
Former [2024/22]HU19.05.2011
AL19.01.2022
AT19.01.2022
CY19.01.2022
CZ19.01.2022
DK19.01.2022
EE19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
IT19.01.2022
LT19.01.2022
LV19.01.2022
MC19.01.2022
MK19.01.2022
NL19.01.2022
PL19.01.2022
RO19.01.2022
RS19.01.2022
SE19.01.2022
SI19.01.2022
SK19.01.2022
SM19.01.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
GB19.05.2022
IE19.05.2022
IS19.05.2022
LU19.05.2022
PT19.05.2022
BE31.05.2022
CH31.05.2022
FR31.05.2022
LI31.05.2022
Former [2024/20]HU19.05.2011
AL19.01.2022
AT19.01.2022
CY19.01.2022
CZ19.01.2022
DK19.01.2022
EE19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
IT19.01.2022
LT19.01.2022
LV19.01.2022
MC19.01.2022
NL19.01.2022
PL19.01.2022
RO19.01.2022
RS19.01.2022
SE19.01.2022
SI19.01.2022
SK19.01.2022
SM19.01.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
GB19.05.2022
IE19.05.2022
IS19.05.2022
LU19.05.2022
PT19.05.2022
BE31.05.2022
CH31.05.2022
FR31.05.2022
LI31.05.2022
Former [2024/18]HU19.05.2011
AL19.01.2022
AT19.01.2022
CZ19.01.2022
DK19.01.2022
EE19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
IT19.01.2022
LT19.01.2022
LV19.01.2022
MC19.01.2022
NL19.01.2022
PL19.01.2022
RO19.01.2022
RS19.01.2022
SE19.01.2022
SI19.01.2022
SK19.01.2022
SM19.01.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
GB19.05.2022
IE19.05.2022
IS19.05.2022
LU19.05.2022
PT19.05.2022
BE31.05.2022
CH31.05.2022
FR31.05.2022
LI31.05.2022
Former [2023/35]AL19.01.2022
AT19.01.2022
CZ19.01.2022
DK19.01.2022
EE19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
IT19.01.2022
LT19.01.2022
LV19.01.2022
MC19.01.2022
NL19.01.2022
PL19.01.2022
RO19.01.2022
RS19.01.2022
SE19.01.2022
SI19.01.2022
SK19.01.2022
SM19.01.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
GB19.05.2022
IE19.05.2022
IS19.05.2022
LU19.05.2022
PT19.05.2022
BE31.05.2022
CH31.05.2022
FR31.05.2022
LI31.05.2022
Former [2023/27]AL19.01.2022
AT19.01.2022
CZ19.01.2022
DK19.01.2022
EE19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
MC19.01.2022
NL19.01.2022
PL19.01.2022
RO19.01.2022
RS19.01.2022
SE19.01.2022
SI19.01.2022
SK19.01.2022
SM19.01.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
GB19.05.2022
IE19.05.2022
IS19.05.2022
LU19.05.2022
PT19.05.2022
BE31.05.2022
CH31.05.2022
FR31.05.2022
LI31.05.2022
Former [2023/25]AL19.01.2022
AT19.01.2022
CZ19.01.2022
DK19.01.2022
EE19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
MC19.01.2022
NL19.01.2022
PL19.01.2022
RO19.01.2022
RS19.01.2022
SE19.01.2022
SI19.01.2022
SK19.01.2022
SM19.01.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
IE19.05.2022
IS19.05.2022
LU19.05.2022
PT19.05.2022
BE31.05.2022
CH31.05.2022
FR31.05.2022
LI31.05.2022
Former [2023/22]AL19.01.2022
AT19.01.2022
CZ19.01.2022
DK19.01.2022
EE19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
MC19.01.2022
NL19.01.2022
PL19.01.2022
RO19.01.2022
RS19.01.2022
SE19.01.2022
SI19.01.2022
SK19.01.2022
SM19.01.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
IE19.05.2022
IS19.05.2022
LU19.05.2022
PT19.05.2022
CH31.05.2022
FR31.05.2022
LI31.05.2022
Former [2023/20]AL19.01.2022
AT19.01.2022
CZ19.01.2022
DK19.01.2022
EE19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
MC19.01.2022
NL19.01.2022
PL19.01.2022
RO19.01.2022
RS19.01.2022
SE19.01.2022
SI19.01.2022
SK19.01.2022
SM19.01.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
IE19.05.2022
IS19.05.2022
LU19.05.2022
PT19.05.2022
CH31.05.2022
LI31.05.2022
Former [2023/10]AL19.01.2022
AT19.01.2022
CZ19.01.2022
DK19.01.2022
EE19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
MC19.01.2022
NL19.01.2022
PL19.01.2022
RO19.01.2022
RS19.01.2022
SE19.01.2022
SI19.01.2022
SK19.01.2022
SM19.01.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
IS19.05.2022
LU19.05.2022
PT19.05.2022
CH31.05.2022
LI31.05.2022
Former [2023/09]AL19.01.2022
AT19.01.2022
CZ19.01.2022
DK19.01.2022
EE19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
MC19.01.2022
NL19.01.2022
PL19.01.2022
RO19.01.2022
RS19.01.2022
SE19.01.2022
SK19.01.2022
SM19.01.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
IS19.05.2022
LU19.05.2022
PT19.05.2022
CH31.05.2022
LI31.05.2022
Former [2023/08]AL19.01.2022
AT19.01.2022
CZ19.01.2022
DK19.01.2022
EE19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
MC19.01.2022
NL19.01.2022
PL19.01.2022
RO19.01.2022
RS19.01.2022
SE19.01.2022
SK19.01.2022
SM19.01.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
IS19.05.2022
LU19.05.2022
PT19.05.2022
Former [2023/06]AL19.01.2022
AT19.01.2022
CZ19.01.2022
DK19.01.2022
EE19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
MC19.01.2022
NL19.01.2022
PL19.01.2022
RO19.01.2022
RS19.01.2022
SE19.01.2022
SK19.01.2022
SM19.01.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
IS19.05.2022
PT19.05.2022
Former [2023/01]AL19.01.2022
AT19.01.2022
CZ19.01.2022
DK19.01.2022
EE19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
NL19.01.2022
PL19.01.2022
RO19.01.2022
RS19.01.2022
SE19.01.2022
SK19.01.2022
SM19.01.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
IS19.05.2022
PT19.05.2022
Former [2022/49]AT19.01.2022
CZ19.01.2022
DK19.01.2022
EE19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
NL19.01.2022
PL19.01.2022
RO19.01.2022
RS19.01.2022
SE19.01.2022
SK19.01.2022
SM19.01.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
IS19.05.2022
PT19.05.2022
Former [2022/48]AT19.01.2022
CZ19.01.2022
DK19.01.2022
EE19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
NL19.01.2022
PL19.01.2022
RO19.01.2022
RS19.01.2022
SE19.01.2022
SM19.01.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
IS19.05.2022
PT19.05.2022
Former [2022/47]AT19.01.2022
DK19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
NL19.01.2022
PL19.01.2022
RO19.01.2022
RS19.01.2022
SE19.01.2022
SM19.01.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
IS19.05.2022
PT19.05.2022
Former [2022/46]AT19.01.2022
DK19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
NL19.01.2022
PL19.01.2022
RS19.01.2022
SE19.01.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
IS19.05.2022
PT19.05.2022
Former [2022/42]AT19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
NL19.01.2022
PL19.01.2022
RS19.01.2022
SE19.01.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
IS19.05.2022
PT19.05.2022
Former [2022/39]AT19.01.2022
ES19.01.2022
FI19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
NL19.01.2022
PL19.01.2022
RS19.01.2022
SE19.01.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
PT19.05.2022
Former [2022/36]AT19.01.2022
ES19.01.2022
HR19.01.2022
LT19.01.2022
LV19.01.2022
NL19.01.2022
PL19.01.2022
RS19.01.2022
SE19.01.2022
BG19.04.2022
NO19.04.2022
GR20.04.2022
PT19.05.2022
Former [2022/35]ES19.01.2022
HR19.01.2022
LT19.01.2022
NL19.01.2022
RS19.01.2022
SE19.01.2022
BG19.04.2022
NO19.04.2022
PT19.05.2022
Former [2022/34]ES19.01.2022
LT19.01.2022
NL19.01.2022
NO19.04.2022
PT19.05.2022
Former [2022/33]LT19.01.2022
NL19.01.2022
NO19.04.2022
Former [2022/30]NL19.01.2022
Documents cited:Search[XI]US4903477  (BUTT GRAHAM P [CA]) [X] 1-4,10 * column 2, line 39 - column 4, line 2; figures 1-4 * [I] 5-9;
 [XI]US2007180827  (DAWSON ROBERT W [US], et al) [X] 1-4,10 * paragraph [0012] - paragraph [0036]; figures 1-4 * [I] 5-9;
 [A]JPS5581228  (HITACHI LTD) [A] 1 * paragraph [0003]; figures 1-4 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.