blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2472058

EP2472058 - Gas turbine engine component material addition process [Right-click to bookmark this link]
StatusThe application has been withdrawn
Status updated on  12.06.2015
Database last updated on 19.10.2024
Most recent event   Tooltip12.06.2015Withdrawal of applicationpublished on 15.07.2015  [2015/29]
Applicant(s)For all designated states
Rolls-Royce Corporation
2001 S. Tibbs Avenue, Mail Drop U27
Indianapolis, IN 46241 / US
[2012/27]
Inventor(s)01 / Shuck, Quinlan Yee
4835 East 71st Street
Indianapolis Indiana 46220 / US
 [2012/27]
Representative(s)Dauncey, Mark Peter, et al
Marks & Clerk LLP
1 New York Street
Manchester M1 4HD / GB
[N/P]
Former [2012/27]Dauncey, Mark Peter, et al
Marks & Clerk LLP
1 New York Street
Manchester, M1 4HD / GB
Application number, filing date11250945.028.12.2011
[2012/27]
Priority number, dateUS201061427690P28.12.2010         Original published format: US 201061427690 P
[2012/27]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2472058
Date:04.07.2012
Language:EN
[2012/27]
Type: A3 Search report 
No.:EP2472058
Date:12.03.2014
Language:EN
[2014/11]
Search report(s)(Supplementary) European search report - dispatched on:EP10.02.2014
ClassificationIPC:F01D5/00, B23P6/00, B23K26/34
[2014/11]
CPC:
F01D5/005 (EP,US); B23K26/342 (EP,US); B23K35/0244 (EP,US);
B23P6/007 (EP,US); B23K2101/001 (EP,US); B23K2101/34 (EP,US);
B23K2103/08 (EP,US); B23P6/045 (EP,US); F05D2230/31 (EP,US);
F05D2230/80 (EP,US) (-)
Former IPC [2012/27]F01D5/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2012/27]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:Verfahren zum Hinzufügen eines Komponentenmaterials eines Gasturbinenmotors[2012/27]
English:Gas turbine engine component material addition process[2012/27]
French:Procédé d'ajout de matériau de composant de moteur de turbine à gaz[2012/27]
Examination procedure05.09.2014Examination requested  [2014/42]
11.09.2014Amendment by applicant (claims and/or description)
08.06.2015Application withdrawn by applicant  [2015/29]
Fees paidRenewal fee
27.12.2013Renewal fee patent year 03
29.12.2014Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XY]DE19547903  (MTU MUENCHEN GMBH [DE]) [X] 1-4,6-15 * columns 2-6; figures 1-3 * [Y] 5;
 [A]US2008135530  (LEE CHING-PANG [US], et al) [A] 1-4,6-15 * paragraphs [0007] , [0013] , [0018] , [0024] , [0038]; figures 1,2 *;
 [Y]WO2009143909  (SIEMENS AG [DE], et al) [Y] 5 * page 21, lines 19-34; figure 4 *;
 [A]DE102008056336  (MTU AERO ENGINES GMBH [DE]) [A] 1-4,6-15* paragraphs [0005] , [0008] , [0018] - [0021] - [0028] , [0029] , [0033] , [0035]; figures 2,3 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.