blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2501163

EP2501163 - TRAFFIC OFFLOAD IN A MULTI-ACCESS MOBILE COMMUNICATION SYSTEM SUPPORTING NETWORK-BASED IP MOBILITY [Right-click to bookmark this link]
Former [2012/38]Traffic offload in a multi-access mobile communication system supporting network-based IP mobility
[2019/19]
StatusThe application is deemed to be withdrawn
Status updated on  10.01.2020
Database last updated on 15.06.2024
FormerGrant of patent is intended
Status updated on  09.04.2019
FormerExamination is in progress
Status updated on  14.11.2017
Most recent event   Tooltip10.01.2020Application deemed to be withdrawnpublished on 12.02.2020  [2020/07]
Applicant(s)For all designated states
Alcatel Lucent
Site Nokia Paris Saclay
Route de Villejust
91620 Nozay / FR
[2018/16]
Former [2014/34]For all designated states
ALCATEL LUCENT
148/152 route de la Reine
92100 Boulogne-Billancourt / FR
Former [2012/38]For all designated states
Alcatel Lucent
3, avenue Octave Gréard
75007 Paris / FR
Inventor(s)01 / Melia, Telemaco
Alcatel-Lucent Bell Labs France
Route de Villejust
91620 Nozay / FR
02 / Scahill, Frank
B54 Rm86, Adastral Park
Marthesham Heath
Ipswich / GB
[N/P]
Former [2012/38]01 / Melia, Telemaco, @Alcatel-Lucent Bell Labs France
Route de Villejust
91620 Nozay / FR
02 / Scahill, Frank
B54 Rm86, Adastral Park
Marthesham Heath
Ipswich / GB
Representative(s)Nokia EPO representatives
Nokia Technologies Oy
Karakaari 7
02610 Espoo / FI
[N/P]
Former [2012/38]El Manouni, Josiane, et al
Alcatel-Lucent International
32, avenue Kléber
92700 Colombes / FR
Application number, filing date11290142.618.03.2011
[2012/38]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2501163
Date:19.09.2012
Language:EN
[2012/38]
Search report(s)(Supplementary) European search report - dispatched on:EP05.07.2011
ClassificationIPC:H04W8/08
[2012/38]
CPC:
H04W60/005 (EP,US); H04W28/02 (KR); H04W28/0226 (US);
H04W28/0865 (EP,KR,US); H04W8/08 (KR); H04W8/087 (EP,US);
H04W80/04 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2012/38]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:TRAFFIC-ENTLASTUNG IN EINEM MOBILEN, DIE NETZWERKBASIERTE IP-MOBILITÄT UNTERSTÜTZENDEN KOMMUNIKATIONSSYSTEM MIT MEHRFACHZUGRIFF[2019/19]
English:TRAFFIC OFFLOAD IN A MULTI-ACCESS MOBILE COMMUNICATION SYSTEM SUPPORTING NETWORK-BASED IP MOBILITY[2019/19]
French:DÉCHARGEMENT DE TRAFIC DANS UN SYSTÈME DE COMMUNICATION MOBILE À ACCÈS MULTIPLE PRENANT EN CHARGE LA MOBILITÉ IP DE TYPE RÉSEAU[2019/19]
Former [2012/38]Traffic-Entlastung in einem mobilen, die netzwerkbasierte IP-Mobilität unterstützenden Kommunikationssystem mit Mehrfachzugriff
Former [2012/38]Traffic offload in a multi-access mobile communication system supporting network-based IP mobility
Former [2012/38]Déchargement de trafic dans un système de communication mobile à accès multiple prenant en charge la mobilité IP de type réseau
Examination procedure18.03.2013Amendment by applicant (claims and/or description)
19.03.2013Examination requested  [2013/17]
12.07.2013Despatch of a communication from the examining division (Time limit: M06)
11.04.2014Reply to a communication from the examining division
06.11.2017Despatch of a communication from the examining division (Time limit: M06)
13.08.2018Reply to a communication from the examining division
10.04.2019Communication of intention to grant the patent
21.08.2019Application deemed to be withdrawn, date of legal effect  [2020/07]
26.09.2019Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time  [2020/07]
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  12.07.2013
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
13.08.2018Request for further processing filed
13.08.2018Full payment received (date of receipt of payment)
Request granted
27.08.2018Decision despatched
The application is deemed to be withdrawn due to failure to reply to the examination report
11.04.2014Request for further processing filed
11.04.2014Full payment received (date of receipt of payment)
Request granted
29.04.2014Decision despatched
Fees paidRenewal fee
26.03.2013Renewal fee patent year 03
21.03.2014Renewal fee patent year 04
24.03.2015Renewal fee patent year 05
25.03.2016Renewal fee patent year 06
24.03.2017Renewal fee patent year 07
23.03.2018Renewal fee patent year 08
13.03.2019Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Rights in Rem or Legal Means of Executiondeleted
[2014/47]
Former [2013/40]ID:01
For:AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR
Date:10.04.2013
[2014/47]
Documents cited:Search[X]WO2009091306  (ERICSSON TELEFON AB L M [SE], et al) [X] 1 * page 4, line 1 - line 12 * * page 11, line 3 - line 31 * * page 12, line 1 - line 17 *;
 [XYI]WO2010029464  (ERICSSON TELEFON AB L M [SE], et al) [X] 1,3-7,9,12,13 * page 5, paragraph 16 * * page 7, paragraph 31 * * page 9, paragraph 35 - paragraph 36 * [Y] 2,10,11 [I] 8;
 [Y]  - CJ. Bernardos, "Proxy Mobile IPv6 Extensions to Support Flow Mobility", (20110314), page 16PP, Internet Draft - NETEXT Working Group, URL: http://tools.ietf.org/id/draft-bernardos-netext-pmipv6-flowmob-03.txt, (20110527), XP002639330 [Y] 2,10,11 * abstract * * page 8 - page 10 *
 [A]  - HA. Chan et al., "Distributed and Dynamic Mobility Management in Mobile Internet: Current Approaches and Issues", Journal of Communications, vol. 6, no. 1, ISSN 1796-2021, (20110201), pages 4 - 15, URL: http://ojs.academypublisher.com/index.php/jcm/article/view/06010415, (20110527), XP002639331 [A] 1-13 * page 10, column 1, paragraph 2 - paragraph 3 *

DOI:   http://dx.doi.org/10.4304/JCM.6.1.4-15
 [A]  - CATT, "Whether PMIP is supported for the H(e)NB ?", 3GPP DRAFT; S2-102597, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), Kyoto, (20100505), vol. SA WG2, XP050434783 [A] 1-13 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.