| EP2404516 - Wig and manufacturing method thereof [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.11.2018 Database last updated on 19.03.2026 | |
| Former | The patent has been granted Status updated on 22.12.2017 | ||
| Former | Grant of patent is intended Status updated on 10.09.2017 | ||
| Former | Examination is in progress Status updated on 07.12.2016 | Most recent event Tooltip | 26.06.2020 | Lapse of the patent in a contracting state New state(s): MK | published on 29.07.2020 [2020/31] | Applicant(s) | For all designated states NJ Diffusion S.A.R.L. (Société à Responsabilité Limitée) 44, rue Paul Valéry 75116 Paris / FR | [2018/04] |
| Former [2012/02] | For all designated states NJ Diffusion S.A.R.L. (Société à Responsabilité Limitée) 44, rue Paul Valéry 75116 Paris / FR | Inventor(s) | 01 /
Nicot, Jérôme 34, chemin de Kerlagatu 29000 Quimper / FR | [2012/02] | Representative(s) | Gaillarde, Frédéric F. Ch., et al Cabinet Germain & Maureau 31-33, rue de la Baume 75008 Paris / FR | [2018/04] |
| Former [2012/02] | Marek, Pierre 28, rue de la Loge B.P. 42413 13215 Marseille Cedex 02 / FR | Application number, filing date | 11358006.2 | 05.07.2011 | [2012/02] | Priority number, date | FR20100002851 | 07.07.2010 Original published format: FR 1002851 | [2012/02] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP2404516 | Date: | 11.01.2012 | Language: | FR | [2012/02] | Type: | B1 Patent specification | No.: | EP2404516 | Date: | 24.01.2018 | Language: | FR | [2018/04] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 21.11.2011 | Classification | IPC: | A41G3/00 | [2012/02] | CPC: |
A41G3/005 (EP);
A41G3/0025 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2012/02] | Title | German: | Perücke und ihr Herstellungsverfahren | [2012/02] | English: | Wig and manufacturing method thereof | [2012/02] | French: | Perruque et son procédé de fabrication | [2012/02] | Examination procedure | 04.07.2012 | Examination requested [2012/33] | 20.08.2012 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time | 28.09.2012 | Amendment by applicant (claims and/or description) | 29.06.2015 | Invitation to indicate the basis for amendments (Time limit: M01) | 29.07.2015 | Reply to an invitation to indicate the basis for amendments | 09.02.2016 | Despatch of a communication from the examining division (Time limit: M06) | 09.08.2016 | Reply to a communication from the examining division | 28.11.2016 | Despatch of a communication from the examining division (Time limit: M04) | 31.03.2017 | Reply to a communication from the examining division | 11.09.2017 | Communication of intention to grant the patent | 12.12.2017 | Fee for grant paid | 12.12.2017 | Fee for publishing/printing paid | 12.12.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 09.02.2016 | Opposition(s) | 25.10.2018 | No opposition filed within time limit [2019/01] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report | 17.09.2012 | Request for further processing filed | 17.09.2012 | Full payment received (date of receipt of payment) Request granted | 18.10.2012 | Decision despatched | Fees paid | Renewal fee | 20.06.2013 | Renewal fee patent year 03 | 02.07.2014 | Renewal fee patent year 04 | 31.07.2015 | Renewal fee patent year 05 | 15.06.2016 | Renewal fee patent year 06 | 15.06.2017 | Renewal fee patent year 07 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.07.2011 | AL | 24.01.2018 | CY | 24.01.2018 | CZ | 24.01.2018 | EE | 24.01.2018 | HR | 24.01.2018 | LT | 24.01.2018 | LV | 24.01.2018 | MC | 24.01.2018 | MK | 24.01.2018 | MT | 24.01.2018 | PL | 24.01.2018 | RO | 24.01.2018 | RS | 24.01.2018 | SI | 24.01.2018 | SK | 24.01.2018 | SM | 24.01.2018 | TR | 24.01.2018 | BG | 24.04.2018 | NO | 24.04.2018 | IS | 24.05.2018 | AT | 05.07.2018 | FI | 05.07.2018 | GB | 05.07.2018 | IE | 05.07.2018 | LU | 05.07.2018 | SE | 06.07.2018 | CH | 31.07.2018 | DK | 31.07.2018 | LI | 31.07.2018 | NL | 01.08.2018 | [2020/31] |
| Former [2020/28] | HU | 05.07.2011 | |
| AL | 24.01.2018 | ||
| CY | 24.01.2018 | ||
| CZ | 24.01.2018 | ||
| EE | 24.01.2018 | ||
| HR | 24.01.2018 | ||
| LT | 24.01.2018 | ||
| LV | 24.01.2018 | ||
| MC | 24.01.2018 | ||
| MT | 24.01.2018 | ||
| PL | 24.01.2018 | ||
| RO | 24.01.2018 | ||
| RS | 24.01.2018 | ||
| SI | 24.01.2018 | ||
| SK | 24.01.2018 | ||
| SM | 24.01.2018 | ||
| TR | 24.01.2018 | ||
| BG | 24.04.2018 | ||
| NO | 24.04.2018 | ||
| IS | 24.05.2018 | ||
| AT | 05.07.2018 | ||
| FI | 05.07.2018 | ||
| GB | 05.07.2018 | ||
| IE | 05.07.2018 | ||
| LU | 05.07.2018 | ||
| SE | 06.07.2018 | ||
| CH | 31.07.2018 | ||
| DK | 31.07.2018 | ||
| LI | 31.07.2018 | ||
| NL | 01.08.2018 | ||
| Former [2020/16] | AL | 24.01.2018 | |
| CY | 24.01.2018 | ||
| CZ | 24.01.2018 | ||
| EE | 24.01.2018 | ||
| HR | 24.01.2018 | ||
| LT | 24.01.2018 | ||
| LV | 24.01.2018 | ||
| MC | 24.01.2018 | ||
| MT | 24.01.2018 | ||
| PL | 24.01.2018 | ||
| RO | 24.01.2018 | ||
| RS | 24.01.2018 | ||
| SI | 24.01.2018 | ||
| SK | 24.01.2018 | ||
| SM | 24.01.2018 | ||
| TR | 24.01.2018 | ||
| BG | 24.04.2018 | ||
| NO | 24.04.2018 | ||
| IS | 24.05.2018 | ||
| AT | 05.07.2018 | ||
| FI | 05.07.2018 | ||
| GB | 05.07.2018 | ||
| IE | 05.07.2018 | ||
| LU | 05.07.2018 | ||
| SE | 06.07.2018 | ||
| CH | 31.07.2018 | ||
| DK | 31.07.2018 | ||
| LI | 31.07.2018 | ||
| NL | 01.08.2018 | ||
| Former [2020/03] | AL | 24.01.2018 | |
| CY | 24.01.2018 | ||
| CZ | 24.01.2018 | ||
| EE | 24.01.2018 | ||
| HR | 24.01.2018 | ||
| LT | 24.01.2018 | ||
| LV | 24.01.2018 | ||
| MC | 24.01.2018 | ||
| MT | 24.01.2018 | ||
| PL | 24.01.2018 | ||
| RO | 24.01.2018 | ||
| RS | 24.01.2018 | ||
| SI | 24.01.2018 | ||
| SK | 24.01.2018 | ||
| SM | 24.01.2018 | ||
| BG | 24.04.2018 | ||
| NO | 24.04.2018 | ||
| IS | 24.05.2018 | ||
| AT | 05.07.2018 | ||
| FI | 05.07.2018 | ||
| GB | 05.07.2018 | ||
| IE | 05.07.2018 | ||
| LU | 05.07.2018 | ||
| SE | 06.07.2018 | ||
| CH | 31.07.2018 | ||
| DK | 31.07.2018 | ||
| LI | 31.07.2018 | ||
| NL | 01.08.2018 | ||
| Former [2019/34] | AL | 24.01.2018 | |
| CY | 24.01.2018 | ||
| CZ | 24.01.2018 | ||
| EE | 24.01.2018 | ||
| HR | 24.01.2018 | ||
| LT | 24.01.2018 | ||
| LV | 24.01.2018 | ||
| MC | 24.01.2018 | ||
| MT | 24.01.2018 | ||
| PL | 24.01.2018 | ||
| RO | 24.01.2018 | ||
| RS | 24.01.2018 | ||
| SI | 24.01.2018 | ||
| SK | 24.01.2018 | ||
| SM | 24.01.2018 | ||
| BG | 24.04.2018 | ||
| NO | 24.04.2018 | ||
| IS | 24.05.2018 | ||
| FI | 05.07.2018 | ||
| GB | 05.07.2018 | ||
| IE | 05.07.2018 | ||
| LU | 05.07.2018 | ||
| SE | 06.07.2018 | ||
| CH | 31.07.2018 | ||
| DK | 31.07.2018 | ||
| LI | 31.07.2018 | ||
| NL | 01.08.2018 | ||
| Former [2019/24] | AL | 24.01.2018 | |
| CY | 24.01.2018 | ||
| CZ | 24.01.2018 | ||
| EE | 24.01.2018 | ||
| HR | 24.01.2018 | ||
| LT | 24.01.2018 | ||
| LV | 24.01.2018 | ||
| MC | 24.01.2018 | ||
| MT | 24.01.2018 | ||
| PL | 24.01.2018 | ||
| RO | 24.01.2018 | ||
| RS | 24.01.2018 | ||
| SI | 24.01.2018 | ||
| SK | 24.01.2018 | ||
| SM | 24.01.2018 | ||
| BG | 24.04.2018 | ||
| NO | 24.04.2018 | ||
| IS | 24.05.2018 | ||
| FI | 05.07.2018 | ||
| GB | 05.07.2018 | ||
| IE | 05.07.2018 | ||
| LU | 05.07.2018 | ||
| SE | 06.07.2018 | ||
| CH | 31.07.2018 | ||
| LI | 31.07.2018 | ||
| NL | 01.08.2018 | ||
| Former [2019/21] | AL | 24.01.2018 | |
| CY | 24.01.2018 | ||
| CZ | 24.01.2018 | ||
| EE | 24.01.2018 | ||
| HR | 24.01.2018 | ||
| LT | 24.01.2018 | ||
| LV | 24.01.2018 | ||
| MC | 24.01.2018 | ||
| MT | 24.01.2018 | ||
| PL | 24.01.2018 | ||
| RO | 24.01.2018 | ||
| RS | 24.01.2018 | ||
| SI | 24.01.2018 | ||
| SK | 24.01.2018 | ||
| SM | 24.01.2018 | ||
| BG | 24.04.2018 | ||
| NO | 24.04.2018 | ||
| IS | 24.05.2018 | ||
| FI | 05.07.2018 | ||
| GB | 05.07.2018 | ||
| IE | 05.07.2018 | ||
| LU | 05.07.2018 | ||
| CH | 31.07.2018 | ||
| LI | 31.07.2018 | ||
| Former [2019/19] | AL | 24.01.2018 | |
| CY | 24.01.2018 | ||
| CZ | 24.01.2018 | ||
| EE | 24.01.2018 | ||
| HR | 24.01.2018 | ||
| LT | 24.01.2018 | ||
| LV | 24.01.2018 | ||
| MC | 24.01.2018 | ||
| MT | 24.01.2018 | ||
| PL | 24.01.2018 | ||
| RO | 24.01.2018 | ||
| RS | 24.01.2018 | ||
| SI | 24.01.2018 | ||
| SK | 24.01.2018 | ||
| SM | 24.01.2018 | ||
| BG | 24.04.2018 | ||
| NO | 24.04.2018 | ||
| IS | 24.05.2018 | ||
| IE | 05.07.2018 | ||
| LU | 05.07.2018 | ||
| Former [2019/17] | AL | 24.01.2018 | |
| CY | 24.01.2018 | ||
| CZ | 24.01.2018 | ||
| EE | 24.01.2018 | ||
| HR | 24.01.2018 | ||
| LT | 24.01.2018 | ||
| LV | 24.01.2018 | ||
| MC | 24.01.2018 | ||
| MT | 24.01.2018 | ||
| PL | 24.01.2018 | ||
| RO | 24.01.2018 | ||
| RS | 24.01.2018 | ||
| SI | 24.01.2018 | ||
| SK | 24.01.2018 | ||
| SM | 24.01.2018 | ||
| BG | 24.04.2018 | ||
| NO | 24.04.2018 | ||
| IS | 24.05.2018 | ||
| LU | 05.07.2018 | ||
| Former [2019/15] | AL | 24.01.2018 | |
| CY | 24.01.2018 | ||
| CZ | 24.01.2018 | ||
| EE | 24.01.2018 | ||
| HR | 24.01.2018 | ||
| LT | 24.01.2018 | ||
| LV | 24.01.2018 | ||
| MC | 24.01.2018 | ||
| MT | 24.01.2018 | ||
| PL | 24.01.2018 | ||
| RO | 24.01.2018 | ||
| RS | 24.01.2018 | ||
| SI | 24.01.2018 | ||
| SK | 24.01.2018 | ||
| SM | 24.01.2018 | ||
| BG | 24.04.2018 | ||
| NO | 24.04.2018 | ||
| IS | 24.05.2018 | ||
| Former [2019/13] | AL | 24.01.2018 | |
| CY | 24.01.2018 | ||
| CZ | 24.01.2018 | ||
| EE | 24.01.2018 | ||
| HR | 24.01.2018 | ||
| LT | 24.01.2018 | ||
| LV | 24.01.2018 | ||
| MT | 24.01.2018 | ||
| PL | 24.01.2018 | ||
| RO | 24.01.2018 | ||
| RS | 24.01.2018 | ||
| SI | 24.01.2018 | ||
| SK | 24.01.2018 | ||
| SM | 24.01.2018 | ||
| BG | 24.04.2018 | ||
| NO | 24.04.2018 | ||
| IS | 24.05.2018 | ||
| Former [2018/52] | AL | 24.01.2018 | |
| CY | 24.01.2018 | ||
| CZ | 24.01.2018 | ||
| EE | 24.01.2018 | ||
| HR | 24.01.2018 | ||
| LT | 24.01.2018 | ||
| LV | 24.01.2018 | ||
| MT | 24.01.2018 | ||
| PL | 24.01.2018 | ||
| RO | 24.01.2018 | ||
| RS | 24.01.2018 | ||
| SK | 24.01.2018 | ||
| SM | 24.01.2018 | ||
| BG | 24.04.2018 | ||
| NO | 24.04.2018 | ||
| IS | 24.05.2018 | ||
| Former [2018/50] | AL | 24.01.2018 | |
| CY | 24.01.2018 | ||
| CZ | 24.01.2018 | ||
| EE | 24.01.2018 | ||
| HR | 24.01.2018 | ||
| LT | 24.01.2018 | ||
| LV | 24.01.2018 | ||
| MT | 24.01.2018 | ||
| PL | 24.01.2018 | ||
| RO | 24.01.2018 | ||
| RS | 24.01.2018 | ||
| SK | 24.01.2018 | ||
| BG | 24.04.2018 | ||
| NO | 24.04.2018 | ||
| IS | 24.05.2018 | ||
| Former [2018/49] | AL | 24.01.2018 | |
| CY | 24.01.2018 | ||
| EE | 24.01.2018 | ||
| HR | 24.01.2018 | ||
| LT | 24.01.2018 | ||
| LV | 24.01.2018 | ||
| MT | 24.01.2018 | ||
| PL | 24.01.2018 | ||
| RO | 24.01.2018 | ||
| RS | 24.01.2018 | ||
| BG | 24.04.2018 | ||
| NO | 24.04.2018 | ||
| IS | 24.05.2018 | ||
| Former [2018/46] | AL | 24.01.2018 | |
| CY | 24.01.2018 | ||
| HR | 24.01.2018 | ||
| LT | 24.01.2018 | ||
| LV | 24.01.2018 | ||
| MT | 24.01.2018 | ||
| PL | 24.01.2018 | ||
| RS | 24.01.2018 | ||
| BG | 24.04.2018 | ||
| NO | 24.04.2018 | ||
| IS | 24.05.2018 | ||
| Former [2018/43] | CY | 24.01.2018 | |
| HR | 24.01.2018 | ||
| LT | 24.01.2018 | ||
| LV | 24.01.2018 | ||
| MT | 24.01.2018 | ||
| PL | 24.01.2018 | ||
| RS | 24.01.2018 | ||
| BG | 24.04.2018 | ||
| NO | 24.04.2018 | ||
| IS | 24.05.2018 | ||
| Former [2018/40] | CY | 24.01.2018 | |
| HR | 24.01.2018 | ||
| LT | 24.01.2018 | ||
| LV | 24.01.2018 | ||
| PL | 24.01.2018 | ||
| RS | 24.01.2018 | ||
| BG | 24.04.2018 | ||
| NO | 24.04.2018 | ||
| IS | 24.05.2018 | ||
| Former [2018/39] | CY | 24.01.2018 | |
| HR | 24.01.2018 | ||
| LT | 24.01.2018 | ||
| LV | 24.01.2018 | ||
| PL | 24.01.2018 | ||
| RS | 24.01.2018 | ||
| NO | 24.04.2018 | ||
| IS | 24.05.2018 | ||
| Former [2018/36] | CY | 24.01.2018 | |
| HR | 24.01.2018 | ||
| LT | 24.01.2018 | ||
| PL | 24.01.2018 | ||
| NO | 24.04.2018 | ||
| Former [2018/35] | CY | 24.01.2018 | |
| HR | 24.01.2018 | ||
| LT | 24.01.2018 | ||
| NO | 24.04.2018 | Documents cited: | Search | [Y] GB1255440 (REID MEREDITH INC et al.) [Y] 1-13 * page 2, line 13 - line 27; figures 1,4,5 * * page 2, line 48 - line 55 * | [Y] FR2841749 (NJ DIFFUSION SARL et al.) [Y] 1-13 * abstract * * page 2, line 2 - page 3, line 16 * * page 3, line 8 - line 12 * * page 5, line 6 - line 14 * | [A] US6220249 (PARK HUN SIK et al.) [A] 1-13 * abstract * * column 2, line 55 - column 3, line 10 * | [A] GB637313 (HARMAN DEIGHTON STEINER et al.) [A] 1-13 * page 1, line 87 - page 2, line 28 * * page 2, line 57 - line 90 * * page 2, line 103 - page 3, line 2 * | [A] US2009199861 (PARIS JOSEPH et al.) [A] 1-13 * abstract * * paragraphs [0003] , [0004] , [0011] , [0043] , [0049] , [0050] , [0054] * |