blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2545011

EP2545011 - HIGH-REFLECTION GLASS PANEL [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  01.07.2022
Database last updated on 24.08.2024
FormerThe patent has been granted
Status updated on  23.07.2021
FormerGrant of patent is intended
Status updated on  23.03.2021
FormerExamination is in progress
Status updated on  03.03.2021
FormerGrant of patent is intended
Status updated on  11.11.2020
FormerExamination is in progress
Status updated on  21.04.2017
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For all designated states
AGC Glass Europe
Avenue Jean Monnet 4
1348 Louvain-la-Neuve / BE
[2014/18]
Former [2013/03]For all designated states
AGC Glass Europe
Chaussée de la Hulpe, 166
1170 Bruxelles (Watermael-Boitsfort) / BE
Inventor(s)01 / DUSOULIER, Laurent
AGC Glass Europe
R&D Centre
Rue de l'Aurore 2
B-6040 Jumet / BE
02 / COSTER, Dominique
AGC Glass Europe
R&D Centre
Rue de l'Aurore 2
B-6040 Jumet / BE
 [2013/03]
Representative(s)AGC Glass Europe
Technovation Centre
Intellectual Property Department
Rue Louis Blériot 12
6041 Gosselies / BE
[2021/34]
Former [2013/03]Le Vaguerèse, Sylvain Jacques
AGC Flat Glass Europe SA Propriété Intellectuelle Rue de l'Aurore 2
6040 Jumet / BE
Application number, filing date11707411.209.03.2011
[2021/34]
WO2011EP53517
Priority number, dateBE2010000015610.03.2010         Original published format: BE 201000156
[2013/03]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report
No.:WO2011110581
Date:15.09.2011
Language:FR
[2011/37]
Type: A1 Application with search report 
No.:EP2545011
Date:16.01.2013
Language:FR
The application published by WIPO in one of the EPO official languages on 15.09.2011 takes the place of the publication of the European patent application.
[2013/03]
Type: B1 Patent specification 
No.:EP2545011
Date:25.08.2021
Language:FR
[2021/34]
Search report(s)International search report - published on:EP15.09.2011
ClassificationIPC:C03C17/34, C03C17/245
[2013/03]
CPC:
C03C23/007 (EP,US); C03C17/245 (EP,US); C03C17/3417 (EP,US);
C03C2217/218 (EP,US); C03C2217/22 (EP,US); C03C2217/23 (EP,US);
C03C2218/154 (EP,US); Y10T428/24967 (EP,US); Y10T428/266 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2013/03]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:GLASPLATTE MIT HOHER REFLEXION[2013/03]
English:HIGH-REFLECTION GLASS PANEL[2013/03]
French:VITRAGE A REFLEXION ELEVEE[2013/03]
Entry into regional phase10.10.2012National basic fee paid 
10.10.2012Designation fee(s) paid 
10.10.2012Examination fee paid 
Examination procedure10.10.2012Examination requested  [2013/03]
30.03.2013Amendment by applicant (claims and/or description)
25.04.2017Despatch of a communication from the examining division (Time limit: M04)
20.08.2017Reply to a communication from the examining division
16.01.2020Despatch of a communication from the examining division (Time limit: M06)
24.06.2020Reply to a communication from the examining division
12.11.2020Communication of intention to grant the patent
02.03.2021Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
24.03.2021Communication of intention to grant the patent
14.07.2021Fee for grant paid
14.07.2021Fee for publishing/printing paid
14.07.2021Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  25.04.2017
Opposition(s)27.05.2022No opposition filed within time limit [2022/31]
Fees paidRenewal fee
02.04.2013Renewal fee patent year 03
31.03.2014Renewal fee patent year 04
01.04.2015Renewal fee patent year 05
31.03.2016Renewal fee patent year 06
31.03.2017Renewal fee patent year 07
03.04.2018Renewal fee patent year 08
01.04.2019Renewal fee patent year 09
31.03.2020Renewal fee patent year 10
31.03.2021Renewal fee patent year 11
Penalty fee
Additional fee for renewal fee
31.03.201505   M06   Fee paid on   20.05.2015
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU09.03.2011
AL25.08.2021
AT25.08.2021
CY25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
IT25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
MK25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SI25.08.2021
SK25.08.2021
SM25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
GB09.03.2022
IE09.03.2022
LU09.03.2022
BE31.03.2022
CH31.03.2022
LI31.03.2022
[2024/22]
Former [2024/20]HU09.03.2011
AL25.08.2021
AT25.08.2021
CY25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
IT25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SI25.08.2021
SK25.08.2021
SM25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
GB09.03.2022
IE09.03.2022
LU09.03.2022
BE31.03.2022
CH31.03.2022
LI31.03.2022
Former [2024/18]HU09.03.2011
AL25.08.2021
AT25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
IT25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SI25.08.2021
SK25.08.2021
SM25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
GB09.03.2022
IE09.03.2022
LU09.03.2022
BE31.03.2022
CH31.03.2022
LI31.03.2022
Former [2023/10]AL25.08.2021
AT25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
IT25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SI25.08.2021
SK25.08.2021
SM25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
GB09.03.2022
IE09.03.2022
LU09.03.2022
BE31.03.2022
CH31.03.2022
LI31.03.2022
Former [2023/09]AL25.08.2021
AT25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
IT25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SI25.08.2021
SK25.08.2021
SM25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
GB09.03.2022
IE09.03.2022
LU09.03.2022
CH31.03.2022
LI31.03.2022
Former [2023/08]AL25.08.2021
AT25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
IT25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SI25.08.2021
SK25.08.2021
SM25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
GB09.03.2022
IE09.03.2022
LU09.03.2022
Former [2022/47]AL25.08.2021
AT25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
IT25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SI25.08.2021
SK25.08.2021
SM25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/36]AL25.08.2021
AT25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
IT25.08.2021
LT25.08.2021
LV25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SI25.08.2021
SK25.08.2021
SM25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/29]AL25.08.2021
AT25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
LT25.08.2021
LV25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SK25.08.2021
SM25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/26]AT25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
LT25.08.2021
LV25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SK25.08.2021
SM25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/24]AT25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
LT25.08.2021
LV25.08.2021
NL25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SK25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/21]AT25.08.2021
DK25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
LT25.08.2021
LV25.08.2021
NL25.08.2021
PL25.08.2021
RS25.08.2021
SE25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/16]AT25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
LT25.08.2021
LV25.08.2021
NL25.08.2021
PL25.08.2021
RS25.08.2021
SE25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/10]AT25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
LT25.08.2021
LV25.08.2021
PL25.08.2021
RS25.08.2021
SE25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/09]AT25.08.2021
ES25.08.2021
FI25.08.2021
LT25.08.2021
RS25.08.2021
SE25.08.2021
BG25.11.2021
NO25.11.2021
PT27.12.2021
Former [2022/08]AT25.08.2021
ES25.08.2021
FI25.08.2021
LT25.08.2021
SE25.08.2021
BG25.11.2021
NO25.11.2021
Former [2022/07]AT25.08.2021
LT25.08.2021
NO25.11.2021
Cited inInternational search[X]EP0911302  (SAINT GOBAIN VITRAGE [FR]) [X] 1,2,5-11,13-18 * paragraphs [0001] , [0005] , [0006] , [0009] - [0024]; examples 1,2; claims 1-24 *;
 [X]US2003224181  (FINLEY JAMES J [US], et al) [X] 1,5-11,13,15-18 * sentences 28-43,55-66; figure -; example -; claims 1-50; table 1 *;
 [X]US2006159933  (DISTELDORF BERND [DE], et al) [X] 1-11,13-18 * paragraphs [0003] - [0005] - [0017] - [0020] - [0032] - [0036] - [0049] , [0051]; figure 1; example -; claims 1-26; tables 1,2 *;
 [X]WO2008010883  (GUARDIAN INDUSTRIES [US], et al) [X] 1,5-11,16-18 * paragraphs [0001] , [0002] , [0007] , [0008] , [0012] - [0021] - [0054] - [0056]; figures 1-6; example -; claims 1-33 *;
 [X]US2008028984  (MEREDITH WILLIAM A [US], et al) [X] 1,2,5-11,13-18 * paragraphs [0014] , [0015] , [0035] , [0041] , [0049]; figures 1-3; claims 1-20; tables 1,2 *;
 [X]WO2008123553  (ASAHI GLASS CO LTD [JP], et al) [X] 1,5-12,16-18 * figures 3-5; examples 1-22; claims 1-8 *;
 [XP]WO2010031808  (AGC FLAT GLASS EUROPE SA [BE], et al) [XP] 1,5-18* the whole document *
ExaminationEP2314553
 WO2011006883
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.