blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2559128

EP2559128 - METHOD AND DEVICE FOR DETERMINING EXCEEDING ENERGY OF AN ENERGY STORAGE DEVICE IN A VEHICLE [Right-click to bookmark this link]
Former [2013/08]METHOD AND APPARATUS FOR DETERMINING AN EXCESS AMOUNT OF ENERGY OF AN ELECTRIC ENERGY STORE OF A VEHICLE
[2019/37]
StatusNo opposition filed within time limit
Status updated on  08.01.2021
Database last updated on 18.05.2024
FormerThe patent has been granted
Status updated on  31.01.2020
FormerGrant of patent is intended
Status updated on  23.09.2019
FormerExamination is in progress
Status updated on  23.12.2016
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Robert Bosch GmbH
Postfach 30 02 20
70442 Stuttgart / DE
[2020/18]
Former [2013/08]For all designated states
Robert Bosch GmbH
Postfach 30 02 20
70442 Stuttgart / DE
Inventor(s)01 / DUCKECK, Ralf
Schleitweg 21
31137 Hildesheim / DE
 [2013/08]
Application number, filing date11709438.323.03.2011
[2020/10]
WO2011EP54421
Priority number, dateDE2010102779315.04.2010         Original published format: DE102010027793
[2013/08]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2011141214
Date:17.11.2011
Language:DE
[2011/46]
Type: A1 Application with search report 
No.:EP2559128
Date:20.02.2013
Language:DE
The application published by WIPO in one of the EPO official languages on 17.11.2011 takes the place of the publication of the European patent application.
[2013/08]
Type: B1 Patent specification 
No.:EP2559128
Date:04.03.2020
Language:DE
[2020/10]
Search report(s)International search report - published on:EP17.11.2011
ClassificationIPC:H02J3/00, H02J3/32, B60K1/00, B60L58/12, B60L55/00
[2019/37]
CPC:
H02J3/008 (EP,US); B60L55/00 (EP); B60L58/12 (EP,US);
H02J3/003 (EP,US); H02J3/322 (EP,US); B60L2250/14 (EP);
B60L2260/54 (EP); B60W2556/50 (EP); Y02E60/00 (EP);
Y02T10/70 (EP); Y02T90/167 (EP); Y04S10/126 (EP);
Y04S30/14 (EP); Y04S50/10 (EP) (-)
Former IPC [2013/08]H02J3/00, H02J3/32, B60L11/18, B60K1/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2013/08]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:VERFAHREN UND VORRICHTUNG ZUM ERMITTELN EINER ÜBERSCHÜSSIGEN ENERGIEMENGE EINES ELEKTRISCHEN ENERGIESPEICHERS EINES FAHRZEUGS[2013/08]
English:METHOD AND DEVICE FOR DETERMINING EXCEEDING ENERGY OF AN ENERGY STORAGE DEVICE IN A VEHICLE[2019/37]
French:PROCÉDÉ ET DISPOSITIF DE DÉTERMINATION D'ÉNERGIE SUPERFLUE D'UN ACCUMULATEUR D'ÉNERGIE DANS UN VÉHICULE[2019/37]
Former [2013/08]METHOD AND APPARATUS FOR DETERMINING AN EXCESS AMOUNT OF ENERGY OF AN ELECTRIC ENERGY STORE OF A VEHICLE
Former [2013/08]PROCÉDÉ ET DISPOSITIF POUR LA DÉTERMINATION D'UNE QUANTITÉ D'ÉNERGIE EN EXCÈS D'UN ACCUMULATEUR D'ÉNERGIE ÉLECTRIQUE D'UN VÉHICULE
Entry into regional phase15.11.2012National basic fee paid 
15.11.2012Designation fee(s) paid 
15.11.2012Examination fee paid 
Examination procedure15.11.2012Examination requested  [2013/08]
11.12.2012Amendment by applicant (claims and/or description)
24.02.2016Despatch of a communication from the examining division (Time limit: M06)
26.08.2016Reply to a communication from the examining division
14.12.2016Despatch of a communication from the examining division (Time limit: M04)
09.05.2017Reply to a communication from the examining division
13.11.2018Despatch of a communication from the examining division (Time limit: M04)
23.01.2019Reply to a communication from the examining division
24.09.2019Communication of intention to grant the patent
17.01.2020Fee for grant paid
17.01.2020Fee for publishing/printing paid
17.01.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  24.02.2016
Opposition(s)07.12.2020No opposition filed within time limit [2021/06]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
09.05.2017Request for further processing filed
09.05.2017Full payment received (date of receipt of payment)
Request granted
19.05.2017Decision despatched
Fees paidRenewal fee
02.04.2013Renewal fee patent year 03
31.03.2014Renewal fee patent year 04
31.03.2015Renewal fee patent year 05
31.03.2016Renewal fee patent year 06
31.03.2017Renewal fee patent year 07
03.04.2018Renewal fee patent year 08
01.04.2019Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU23.03.2011
AL04.03.2020
CY04.03.2020
CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
MK04.03.2020
MT04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
TR04.03.2020
AT23.03.2020
IE23.03.2020
LU23.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
BG04.06.2020
GB04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
[2022/31]
Former [2022/30]HU23.03.2011
AL04.03.2020
CY04.03.2020
CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
MT04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
TR04.03.2020
AT23.03.2020
IE23.03.2020
LU23.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
BG04.06.2020
GB04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2022/27]HU23.03.2011
CY04.03.2020
CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
MT04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
TR04.03.2020
AT23.03.2020
IE23.03.2020
LU23.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
BG04.06.2020
GB04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2022/26]CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
TR04.03.2020
AT23.03.2020
IE23.03.2020
LU23.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
BG04.06.2020
GB04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2021/37]CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
AT23.03.2020
IE23.03.2020
LU23.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
BG04.06.2020
GB04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2021/22]CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
IE23.03.2020
LU23.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
BG04.06.2020
GB04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2021/12]CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
IE23.03.2020
LU23.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2021/08]CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
NL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SK04.03.2020
SM04.03.2020
IE23.03.2020
LU23.03.2020
CH31.03.2020
LI31.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2021/04]CZ04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
NL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SK04.03.2020
SM04.03.2020
LU23.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2020/50]CZ04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2020/49]CZ04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2020/48]ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2020/47]ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
RS04.03.2020
SE04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
Former [2020/46]FI04.03.2020
HR04.03.2020
LV04.03.2020
NL04.03.2020
RS04.03.2020
SE04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
Former [2020/45]FI04.03.2020
HR04.03.2020
LV04.03.2020
NL04.03.2020
RS04.03.2020
SE04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
Former [2020/39]FI04.03.2020
HR04.03.2020
LV04.03.2020
RS04.03.2020
SE04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
Former [2020/38]FI04.03.2020
HR04.03.2020
LV04.03.2020
RS04.03.2020
SE04.03.2020
NO04.06.2020
GR05.06.2020
Former [2020/37]FI04.03.2020
HR04.03.2020
LV04.03.2020
RS04.03.2020
SE04.03.2020
NO04.06.2020
Former [2020/35]FI04.03.2020
NO04.06.2020
Cited inInternational search[A]US2005127855  (WOBBEN ALOYS [DE]) [A] 1-10* the whole document *;
 [A]US2008039989  (POLLACK SETH B [US], et al) [A] 1-10 * abstract * * page 2, paragraph 35 - page 8, paragraph 114 *;
 [A]US2009210357  (PUDAR NIKOLA J [US], et al) [A] 1-10 * abstract * * page 1, paragraph 16 - page 9, paragraph 73 *;
 [XI]US2009229900  (HAFNER JAMES LEE [US], et al) [X] 1-3,6,9,10 * abstract * * page 2, paragraph 26 - page 6, paragraph 58 * [I] 4,5,7,8
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.