EP2569523 - AN ENGINE ENHANCEMENT METHOD AND SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 15.02.2019 Database last updated on 19.07.2024 | |
Former | The patent has been granted Status updated on 09.03.2018 | ||
Former | Grant of patent is intended Status updated on 20.11.2017 | ||
Former | Examination is in progress Status updated on 06.01.2017 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): IS | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states ULTIMATE CELL, LDA. Rua Mato das Cruzadas, n° 1, bloco 4 - r/c dt° São Pedro de Penaferrim 2710-144 Sintra / PT | [2016/50] |
Former [2014/42] | For all designated states Ultimate Power, Lda Estrada de Paços de Arcos, 66 A 2735-336 Cacém / PT | ||
Former [2013/12] | For all designated states Adair, Christopher Duchalla Ballinskelligs Killarney, County Kerry / IE | Inventor(s) | 01 /
Adair, Christopher Duchalla, Ballinskelligs Killarney, Co. Kerry / IE | [2014/42] |
Former [2013/12] | 01 /
see applicant ... | Representative(s) | FRKelly Waterways House Grand Canal Quay Dublin D02 PD39 / IE | [N/P] |
Former [2018/15] | FRKelly 27 Clyde Road Dublin D04 F838 / IE | ||
Former [2013/12] | O'Neill, Brian F. R. Kelly & Co. 27 Clyde Road Ballsbridge IRL-Dublin 4 / IE | Application number, filing date | 11720075.8 | 06.05.2011 | [2018/15] | WO2011EP57353 | Priority number, date | IE20100000301 | 11.05.2010 Original published format: IE 20100301 | [2013/12] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011141392 | Date: | 17.11.2011 | Language: | EN | [2011/46] | Type: | A1 Application with search report | No.: | EP2569523 | Date: | 20.03.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 17.11.2011 takes the place of the publication of the European patent application. | [2013/12] | Type: | B1 Patent specification | No.: | EP2569523 | Date: | 11.04.2018 | Language: | EN | [2018/15] | Search report(s) | International search report - published on: | EP | 17.11.2011 | Classification | IPC: | F02B43/10, C25B1/04, F02M25/12, C25B15/02 | [2017/01] | CPC: |
F02M25/12 (EP,US);
C25B1/04 (EP,US);
C25B15/02 (EP,US);
F02B43/10 (EP,US);
Y02E60/36 (EP,US);
Y02T10/12 (EP,US)
|
Former IPC [2013/12] | F02B23/00, F02M25/10, F02M27/02, F02M25/12, C25B1/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/12] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN UND SYSTEM ZUR MOTOROPTIMIERUNG | [2013/12] | English: | AN ENGINE ENHANCEMENT METHOD AND SYSTEM | [2013/12] | French: | PROCÉDÉ ET SYSTÈME D'AMÉLIORATION DE MOTEUR | [2013/12] | Entry into regional phase | 11.12.2012 | National basic fee paid | 11.12.2012 | Designation fee(s) paid | 11.12.2012 | Examination fee paid | Examination procedure | 11.12.2012 | Examination requested [2013/12] | 24.06.2013 | Amendment by applicant (claims and/or description) | 05.02.2015 | Despatch of a communication from the examining division (Time limit: M06) | 11.08.2015 | Reply to a communication from the examining division | 21.01.2016 | Despatch of a communication from the examining division (Time limit: M06) | 18.07.2016 | Reply to a communication from the examining division | 03.01.2017 | Despatch of a communication from the examining division (Time limit: M04) | 11.05.2017 | Reply to a communication from the examining division | 21.11.2017 | Communication of intention to grant the patent | 22.02.2018 | Fee for grant paid | 22.02.2018 | Fee for publishing/printing paid | 22.02.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 05.02.2015 | Opposition(s) | 14.01.2019 | No opposition filed within time limit [2019/12] | Fees paid | Renewal fee | 31.05.2013 | Renewal fee patent year 03 | 02.06.2014 | Renewal fee patent year 04 | 05.11.2015 | Renewal fee patent year 05 | 18.10.2016 | Renewal fee patent year 06 | 16.05.2017 | Renewal fee patent year 07 | Penalty fee | Additional fee for renewal fee | 31.05.2015 | 05   M06   Fee paid on   05.11.2015 | 31.05.2016 | 06   M06   Fee paid on   18.10.2016 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 06.05.2011 | AL | 11.04.2018 | AT | 11.04.2018 | CY | 11.04.2018 | CZ | 11.04.2018 | DK | 11.04.2018 | EE | 11.04.2018 | ES | 11.04.2018 | FI | 11.04.2018 | GR | 11.04.2018 | HR | 11.04.2018 | IT | 11.04.2018 | LT | 11.04.2018 | LV | 11.04.2018 | MC | 11.04.2018 | MK | 11.04.2018 | NL | 11.04.2018 | PL | 11.04.2018 | RO | 11.04.2018 | RS | 11.04.2018 | SE | 11.04.2018 | SI | 11.04.2018 | SK | 11.04.2018 | SM | 11.04.2018 | LU | 06.05.2018 | MT | 06.05.2018 | BE | 31.05.2018 | CH | 31.05.2018 | LI | 31.05.2018 | FR | 11.06.2018 | BG | 11.07.2018 | NO | 11.07.2018 | IS | 11.08.2018 | [2020/33] |
Former [2020/31] | HU | 06.05.2011 | |
AL | 11.04.2018 | ||
AT | 11.04.2018 | ||
CY | 11.04.2018 | ||
CZ | 11.04.2018 | ||
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
GR | 11.04.2018 | ||
HR | 11.04.2018 | ||
IT | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
MC | 11.04.2018 | ||
MK | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
SI | 11.04.2018 | ||
SK | 11.04.2018 | ||
SM | 11.04.2018 | ||
LU | 06.05.2018 | ||
MT | 06.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
FR | 11.06.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
Former [2020/30] | HU | 06.05.2011 | |
AL | 11.04.2018 | ||
AT | 11.04.2018 | ||
CZ | 11.04.2018 | ||
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
GR | 11.04.2018 | ||
HR | 11.04.2018 | ||
IT | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
MC | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
SI | 11.04.2018 | ||
SK | 11.04.2018 | ||
SM | 11.04.2018 | ||
LU | 06.05.2018 | ||
MT | 06.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
FR | 11.06.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
Former [2020/28] | HU | 06.05.2011 | |
AL | 11.04.2018 | ||
AT | 11.04.2018 | ||
CZ | 11.04.2018 | ||
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
IT | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
MC | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
SI | 11.04.2018 | ||
SK | 11.04.2018 | ||
SM | 11.04.2018 | ||
LU | 06.05.2018 | ||
MT | 06.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
FR | 11.06.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
Former [2020/08] | AL | 11.04.2018 | |
AT | 11.04.2018 | ||
CZ | 11.04.2018 | ||
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
IT | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
MC | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
SI | 11.04.2018 | ||
SK | 11.04.2018 | ||
SM | 11.04.2018 | ||
LU | 06.05.2018 | ||
MT | 06.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
FR | 11.06.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
Former [2019/26] | AL | 11.04.2018 | |
AT | 11.04.2018 | ||
CZ | 11.04.2018 | ||
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
IT | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
MC | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
SI | 11.04.2018 | ||
SK | 11.04.2018 | ||
SM | 11.04.2018 | ||
LU | 06.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
FR | 11.06.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
Former [2019/23] | AL | 11.04.2018 | |
AT | 11.04.2018 | ||
CZ | 11.04.2018 | ||
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
IT | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
MC | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
SK | 11.04.2018 | ||
SM | 11.04.2018 | ||
LU | 06.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
FR | 11.06.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
Former [2019/17] | AL | 11.04.2018 | |
AT | 11.04.2018 | ||
CZ | 11.04.2018 | ||
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
IT | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
MC | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
SK | 11.04.2018 | ||
SM | 11.04.2018 | ||
LU | 06.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
Former [2019/11] | AL | 11.04.2018 | |
AT | 11.04.2018 | ||
CZ | 11.04.2018 | ||
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
IT | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
MC | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
SK | 11.04.2018 | ||
SM | 11.04.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
Former [2019/10] | AL | 11.04.2018 | |
AT | 11.04.2018 | ||
CZ | 11.04.2018 | ||
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
MC | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RO | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
SK | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
Former [2019/09] | AL | 11.04.2018 | |
DK | 11.04.2018 | ||
EE | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
Former [2019/08] | AL | 11.04.2018 | |
DK | 11.04.2018 | ||
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
Former [2018/51] | AL | 11.04.2018 | |
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
LT | 11.04.2018 | ||
LV | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
RS | 11.04.2018 | ||
SE | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
Former [2018/50] | AL | 11.04.2018 | |
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
HR | 11.04.2018 | ||
LT | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
SE | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
Former [2018/49] | AL | 11.04.2018 | |
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
LT | 11.04.2018 | ||
NL | 11.04.2018 | ||
PL | 11.04.2018 | ||
SE | 11.04.2018 | ||
BG | 11.07.2018 | ||
NO | 11.07.2018 | ||
Former [2018/47] | AL | 11.04.2018 | |
ES | 11.04.2018 | ||
FI | 11.04.2018 | ||
LT | 11.04.2018 | ||
NL | 11.04.2018 | ||
NO | 11.07.2018 | ||
Former [2018/46] | AL | 11.04.2018 | |
LT | 11.04.2018 | ||
NL | 11.04.2018 | ||
NO | 11.07.2018 | ||
Former [2018/43] | NL | 11.04.2018 | Cited in | International search | [XI]CH116428 (BUSCHMANN HEINRICH [DE]) [X] 1,2,5-10,16 * the whole document * [I] 11; | [XI]DE2455540 (BAUMHAUER RUDOLF) [X] 1,2,6,10,16 * page 3, line 1 - page 4, line 1 * [I] 3,5,7,8; | [A]US4185593 (MCCLURE KENNETH S [US]) [A] 1,2,9,16* the whole document *; | [XI]DE3419783 (MORGENWEG EDGAR) [X] 1-5,9,10,16 * the whole document * [I] 6; | [XI]DE3828764 (SCHAEPERKOETTER HEINRICH DIPL [DE]) [X] 1-5,9,16,17 * column 1, line 56 - column 2, line 59 * [I] 6,8; | [XI]WO2008150901 (HYDROGEN ENGINE CT INC [US], et al) [X] 1,2,16 * paragraph [0005] - paragraph [0010] * [I] 3,6,7; | [XI]DE102008003126 (CLEAN WORLD EN GMBH [DE]) [X] 1-5,7,9-12,16,17 * paragraph [0036] - paragraph [0065] * [I] 6,8,13-15 |