EP2569764 - AIRCRAFT INTERFACE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.11.2018 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 24.11.2017 | ||
Former | Grant of patent is intended Status updated on 13.07.2017 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states Bluebox Avionics Limited 3-8 Carburton Street London W1W 5AJ / GB | [2017/52] |
Former [2013/12] | For all designated states Bluebox Avionics Limited 3-8 Carburton Street London W1W 5AJ / GB | Inventor(s) | 01 /
MACRAE, James Bluebox Avionics Limited Century House 43 East Port Street Dunfermline Fife KY12 7JE / GB | 02 /
SKELTON, Murray Bluebox Avionics Limited Century House 43 East Port Street Dunfermline Fife KY12 7JE / GB | [2013/12] | Representative(s) | Hargreaves, Timothy Edward, et al Marks & Clerk LLP 40 Torphichen Street Edinburgh EH3 8JB / GB | [N/P] |
Former [2013/42] | Hargreaves, Timothy Edward, et al Marks & Clerk LLP Atholl Exchange 6 Canning Street Edinburgh EH3 8EG / GB | ||
Former [2013/12] | Hargreaves, Timothy Edward Marks & Clerk LLP Aurora 120 Bothwell Street Glasgow G2 7JS / GB | Application number, filing date | 11720160.8 | 12.05.2011 | [2017/52] | WO2011GB00720 | Priority number, date | GB20100008085 | 14.05.2010 Original published format: GB 201008085 | [2013/12] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011141702 | Date: | 17.11.2011 | Language: | EN | [2011/46] | Type: | A1 Application with search report | No.: | EP2569764 | Date: | 20.03.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 17.11.2011 takes the place of the publication of the European patent application. | [2013/12] | Type: | B1 Patent specification | No.: | EP2569764 | Date: | 27.12.2017 | Language: | EN | [2017/52] | Search report(s) | International search report - published on: | EP | 17.11.2011 | Classification | IPC: | G08C17/02 | [2017/31] | CPC: |
G08C17/00 (EP,US);
B64D43/00 (US);
G08C17/02 (EP,US);
G08C2201/40 (EP,US)
|
Former IPC [2013/12] | G08C17/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/12] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SCHNITTSTELLE FÜR EIN FLUGZEUG | [2013/12] | English: | AIRCRAFT INTERFACE | [2013/12] | French: | INTERFACE D'AÉRONEF | [2013/12] | Entry into regional phase | 16.11.2012 | National basic fee paid | 16.11.2012 | Designation fee(s) paid | 16.11.2012 | Examination fee paid | Examination procedure | 16.11.2012 | Amendment by applicant (claims and/or description) | 16.11.2012 | Examination requested [2013/12] | 16.08.2013 | Despatch of a communication from the examining division (Time limit: M06) | 26.02.2014 | Reply to a communication from the examining division | 14.07.2017 | Communication of intention to grant the patent | 09.11.2017 | Fee for grant paid | 09.11.2017 | Fee for publishing/printing paid | 09.11.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 16.08.2013 | Opposition(s) | 28.09.2018 | No opposition filed within time limit [2018/49] | Fees paid | Renewal fee | 10.05.2013 | Renewal fee patent year 03 | 27.03.2014 | Renewal fee patent year 04 | 12.05.2015 | Renewal fee patent year 05 | 10.05.2016 | Renewal fee patent year 06 | 10.05.2017 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.05.2011 | AL | 27.12.2017 | AT | 27.12.2017 | CY | 27.12.2017 | CZ | 27.12.2017 | DK | 27.12.2017 | EE | 27.12.2017 | FI | 27.12.2017 | HR | 27.12.2017 | IT | 27.12.2017 | LT | 27.12.2017 | LV | 27.12.2017 | MC | 27.12.2017 | MK | 27.12.2017 | PL | 27.12.2017 | PT | 27.12.2017 | RO | 27.12.2017 | RS | 27.12.2017 | SE | 27.12.2017 | SI | 27.12.2017 | SK | 27.12.2017 | SM | 27.12.2017 | TR | 27.12.2017 | BG | 27.03.2018 | NO | 27.03.2018 | GR | 28.03.2018 | IS | 27.04.2018 | IE | 12.05.2018 | LU | 12.05.2018 | MT | 12.05.2018 | BE | 31.05.2018 | CH | 31.05.2018 | LI | 31.05.2018 | [2020/33] |
Former [2020/31] | HU | 12.05.2011 | |
AT | 27.12.2017 | ||
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
MK | 27.12.2017 | ||
PL | 27.12.2017 | ||
PT | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SE | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
TR | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
IE | 12.05.2018 | ||
LU | 12.05.2018 | ||
MT | 12.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2020/29] | HU | 12.05.2011 | |
AT | 27.12.2017 | ||
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
PL | 27.12.2017 | ||
PT | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SE | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
TR | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
IE | 12.05.2018 | ||
LU | 12.05.2018 | ||
MT | 12.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2020/27] | HU | 12.05.2011 | |
AT | 27.12.2017 | ||
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
PL | 27.12.2017 | ||
PT | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
TR | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
IE | 12.05.2018 | ||
LU | 12.05.2018 | ||
MT | 12.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2020/16] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
TR | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
IE | 12.05.2018 | ||
LU | 12.05.2018 | ||
MT | 12.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2020/08] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
IE | 12.05.2018 | ||
LU | 12.05.2018 | ||
MT | 12.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2019/24] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
IE | 12.05.2018 | ||
LU | 12.05.2018 | ||
BE | 31.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2019/19] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
IE | 12.05.2018 | ||
LU | 12.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2019/17] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
LU | 12.05.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2019/12] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
CH | 31.05.2018 | ||
LI | 31.05.2018 | ||
Former [2019/06] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2018/51] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2018/40] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2018/39] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
PL | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2018/38] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
PL | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2018/37] | CY | 27.12.2017 | |
CZ | 27.12.2017 | ||
EE | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
PL | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
Former [2018/25] | FI | 27.12.2017 | |
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
RS | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
Former [2018/23] | FI | 27.12.2017 | |
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
RS | 27.12.2017 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
Former [2018/22] | FI | 27.12.2017 | |
LT | 27.12.2017 | ||
NO | 27.03.2018 | Cited in | International search | [XI]US2005268319 (BRADY KENNETH A JR [US]) [X] 1-8,10-13,17,22,23 * paragraph [0031] - paragraph [0042] * [I] 9,14-16,18-21; | [X]WO2006071457 (SNAP ON TOOLS CORP [US], et al) [X] 1-8,17,22,23 * paragraph [0029] - paragraph [0040] * * paragraph [0042] - paragraph [0046] ** paragraph [0054] - paragraph [0058] * | by applicant | US2005268319 | WO2006071457 |