EP2577413 - METHOD AND SYSTEM FOR CLOSED-LOOP CONTROLLER PROGRAMMING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 29.04.2016 Database last updated on 29.06.2024 | Most recent event Tooltip | 19.10.2018 | Lapse of the patent in a contracting state New state(s): AL | published on 21.11.2018 [2018/47] | Applicant(s) | For all designated states Siemens Product Lifecycle Management Software Inc. 5800 Granite Parkway, Suite 600 Plano, TX 75024 / US | [2013/15] | Inventor(s) | 01 /
SCHNEIDER, Roland Röttenbacherstr. 34 91325 Adelsdorf / DE | 02 /
MCDANIEL, Richard Gary 2 Pershing Avenue Hightstown New Jersey 08520 / US | [2013/15] | Representative(s) | Maier, Daniel Oliver, et al Siemens AG Postfach 22 16 34 80506 München / DE | [N/P] |
Former [2014/33] | Maier, Daniel Oliver, et al Siemens AG Postfach 22 16 34 80506 München / DE | ||
Former [2013/15] | Kley, Hansjörg Siemens AG Postfach 22 16 34 80506 München / DE | Application number, filing date | 11724106.7 | 23.05.2011 | WO2011US37532 | Priority number, date | US20100786938 | 25.05.2010 Original published format: US 786938 | [2013/15] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011149826 | Date: | 01.12.2011 | Language: | EN | [2011/48] | Type: | A1 Application with search report | No.: | EP2577413 | Date: | 10.04.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 01.12.2011 takes the place of the publication of the European patent application. | [2013/15] | Type: | B1 Patent specification | No.: | EP2577413 | Date: | 24.06.2015 | Language: | EN | [2015/26] | Search report(s) | International search report - published on: | EP | 01.12.2011 | Classification | IPC: | G05B19/4061 | [2013/15] | CPC: |
G05B19/0426 (EP,US);
G06F8/34 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN UND SYSTEM ZUR PROGRAMMIERUNG EINES GESCHLOSSENEN REGELKREISES | [2013/15] | English: | METHOD AND SYSTEM FOR CLOSED-LOOP CONTROLLER PROGRAMMING | [2013/15] | French: | PROCÉDÉ ET SYSTÈME DE PROGRAMMATION DE CONTRÔLEUR EN BOUCLE FERMÉE | [2013/15] | Entry into regional phase | 18.12.2012 | National basic fee paid | 18.12.2012 | Designation fee(s) paid | 18.12.2012 | Examination fee paid | Examination procedure | 14.12.2012 | Amendment by applicant (claims and/or description) | 18.12.2012 | Examination requested [2013/15] | 13.01.2015 | Communication of intention to grant the patent | 16.03.2015 | Receipt of the translation of the claim(s) | 05.05.2015 | Fee for grant paid | 05.05.2015 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 13.01.2015 | Opposition(s) | 29.03.2016 | No opposition filed within time limit [2016/22] | Fees paid | Renewal fee | 21.05.2013 | Renewal fee patent year 03 | 19.05.2014 | Renewal fee patent year 04 | 13.05.2015 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.05.2011 | AL | 24.06.2015 | AT | 24.06.2015 | BE | 24.06.2015 | CY | 24.06.2015 | CZ | 24.06.2015 | DK | 24.06.2015 | EE | 24.06.2015 | ES | 24.06.2015 | FI | 24.06.2015 | HR | 24.06.2015 | IT | 24.06.2015 | LT | 24.06.2015 | LV | 24.06.2015 | MC | 24.06.2015 | MK | 24.06.2015 | NL | 24.06.2015 | PL | 24.06.2015 | RO | 24.06.2015 | RS | 24.06.2015 | SE | 24.06.2015 | SI | 24.06.2015 | SK | 24.06.2015 | SM | 24.06.2015 | TR | 24.06.2015 | BG | 24.09.2015 | NO | 24.09.2015 | GR | 25.09.2015 | IS | 24.10.2015 | PT | 26.10.2015 | [2018/47] |
Former [2018/31] | HU | 23.05.2011 | |
AT | 24.06.2015 | ||
BE | 24.06.2015 | ||
CY | 24.06.2015 | ||
CZ | 24.06.2015 | ||
DK | 24.06.2015 | ||
EE | 24.06.2015 | ||
ES | 24.06.2015 | ||
FI | 24.06.2015 | ||
HR | 24.06.2015 | ||
IT | 24.06.2015 | ||
LT | 24.06.2015 | ||
LV | 24.06.2015 | ||
MC | 24.06.2015 | ||
MK | 24.06.2015 | ||
NL | 24.06.2015 | ||
PL | 24.06.2015 | ||
RO | 24.06.2015 | ||
RS | 24.06.2015 | ||
SE | 24.06.2015 | ||
SI | 24.06.2015 | ||
SK | 24.06.2015 | ||
SM | 24.06.2015 | ||
TR | 24.06.2015 | ||
BG | 24.09.2015 | ||
NO | 24.09.2015 | ||
GR | 25.09.2015 | ||
IS | 24.10.2015 | ||
PT | 26.10.2015 | ||
Former [2018/29] | HU | 23.05.2011 | |
AT | 24.06.2015 | ||
BE | 24.06.2015 | ||
CY | 24.06.2015 | ||
CZ | 24.06.2015 | ||
DK | 24.06.2015 | ||
EE | 24.06.2015 | ||
ES | 24.06.2015 | ||
FI | 24.06.2015 | ||
HR | 24.06.2015 | ||
IT | 24.06.2015 | ||
LT | 24.06.2015 | ||
LV | 24.06.2015 | ||
MC | 24.06.2015 | ||
MK | 24.06.2015 | ||
NL | 24.06.2015 | ||
PL | 24.06.2015 | ||
RO | 24.06.2015 | ||
RS | 24.06.2015 | ||
SE | 24.06.2015 | ||
SI | 24.06.2015 | ||
SK | 24.06.2015 | ||
SM | 24.06.2015 | ||
TR | 24.06.2015 | ||
BG | 24.09.2015 | ||
NO | 24.09.2015 | ||
GR | 25.09.2015 | ||
IS | 24.10.2015 | ||
PT | 26.10.2015 | ||
Former [2018/28] | HU | 23.05.2011 | |
AT | 24.06.2015 | ||
BE | 24.06.2015 | ||
CY | 24.06.2015 | ||
CZ | 24.06.2015 | ||
DK | 24.06.2015 | ||
EE | 24.06.2015 | ||
ES | 24.06.2015 | ||
FI | 24.06.2015 | ||
HR | 24.06.2015 | ||
IT | 24.06.2015 | ||
LT | 24.06.2015 | ||
LV | 24.06.2015 | ||
MC | 24.06.2015 | ||
MK | 24.06.2015 | ||
NL | 24.06.2015 | ||
PL | 24.06.2015 | ||
RO | 24.06.2015 | ||
RS | 24.06.2015 | ||
SE | 24.06.2015 | ||
SI | 24.06.2015 | ||
SK | 24.06.2015 | ||
SM | 24.06.2015 | ||
BG | 24.09.2015 | ||
NO | 24.09.2015 | ||
GR | 25.09.2015 | ||
IS | 24.10.2015 | ||
PT | 26.10.2015 | ||
Former [2017/40] | AT | 24.06.2015 | |
BE | 24.06.2015 | ||
CZ | 24.06.2015 | ||
DK | 24.06.2015 | ||
EE | 24.06.2015 | ||
ES | 24.06.2015 | ||
FI | 24.06.2015 | ||
HR | 24.06.2015 | ||
IT | 24.06.2015 | ||
LT | 24.06.2015 | ||
LV | 24.06.2015 | ||
NL | 24.06.2015 | ||
PL | 24.06.2015 | ||
RO | 24.06.2015 | ||
RS | 24.06.2015 | ||
SE | 24.06.2015 | ||
SI | 24.06.2015 | ||
SK | 24.06.2015 | ||
BG | 24.09.2015 | ||
NO | 24.09.2015 | ||
GR | 25.09.2015 | ||
IS | 24.10.2015 | ||
PT | 26.10.2015 | ||
Former [2017/03] | AT | 24.06.2015 | |
BE | 24.06.2015 | ||
CZ | 24.06.2015 | ||
DK | 24.06.2015 | ||
EE | 24.06.2015 | ||
ES | 24.06.2015 | ||
FI | 24.06.2015 | ||
HR | 24.06.2015 | ||
IT | 24.06.2015 | ||
LT | 24.06.2015 | ||
LV | 24.06.2015 | ||
PL | 24.06.2015 | ||
RO | 24.06.2015 | ||
RS | 24.06.2015 | ||
SI | 24.06.2015 | ||
SK | 24.06.2015 | ||
BG | 24.09.2015 | ||
NO | 24.09.2015 | ||
GR | 25.09.2015 | ||
IS | 24.10.2015 | ||
PT | 26.10.2015 | ||
Former [2016/36] | AT | 24.06.2015 | |
CZ | 24.06.2015 | ||
DK | 24.06.2015 | ||
EE | 24.06.2015 | ||
ES | 24.06.2015 | ||
FI | 24.06.2015 | ||
HR | 24.06.2015 | ||
IT | 24.06.2015 | ||
LT | 24.06.2015 | ||
LV | 24.06.2015 | ||
PL | 24.06.2015 | ||
RO | 24.06.2015 | ||
RS | 24.06.2015 | ||
SI | 24.06.2015 | ||
SK | 24.06.2015 | ||
BG | 24.09.2015 | ||
NO | 24.09.2015 | ||
GR | 25.09.2015 | ||
IS | 24.10.2015 | ||
PT | 26.10.2015 | ||
Former [2016/21] | AT | 24.06.2015 | |
CZ | 24.06.2015 | ||
DK | 24.06.2015 | ||
EE | 24.06.2015 | ||
ES | 24.06.2015 | ||
FI | 24.06.2015 | ||
HR | 24.06.2015 | ||
IT | 24.06.2015 | ||
LT | 24.06.2015 | ||
LV | 24.06.2015 | ||
PL | 24.06.2015 | ||
RO | 24.06.2015 | ||
RS | 24.06.2015 | ||
SK | 24.06.2015 | ||
BG | 24.09.2015 | ||
NO | 24.09.2015 | ||
GR | 25.09.2015 | ||
IS | 24.10.2015 | ||
PT | 26.10.2015 | ||
Former [2016/20] | AT | 24.06.2015 | |
CZ | 24.06.2015 | ||
DK | 24.06.2015 | ||
EE | 24.06.2015 | ||
ES | 24.06.2015 | ||
FI | 24.06.2015 | ||
HR | 24.06.2015 | ||
LT | 24.06.2015 | ||
LV | 24.06.2015 | ||
PL | 24.06.2015 | ||
RO | 24.06.2015 | ||
RS | 24.06.2015 | ||
SK | 24.06.2015 | ||
BG | 24.09.2015 | ||
NO | 24.09.2015 | ||
GR | 25.09.2015 | ||
IS | 24.10.2015 | ||
PT | 26.10.2015 | ||
Former [2016/11] | AT | 24.06.2015 | |
CZ | 24.06.2015 | ||
EE | 24.06.2015 | ||
ES | 24.06.2015 | ||
FI | 24.06.2015 | ||
HR | 24.06.2015 | ||
LT | 24.06.2015 | ||
LV | 24.06.2015 | ||
PL | 24.06.2015 | ||
RO | 24.06.2015 | ||
RS | 24.06.2015 | ||
SK | 24.06.2015 | ||
BG | 24.09.2015 | ||
NO | 24.09.2015 | ||
GR | 25.09.2015 | ||
IS | 24.10.2015 | ||
PT | 26.10.2015 | ||
Former [2016/10] | CZ | 24.06.2015 | |
EE | 24.06.2015 | ||
ES | 24.06.2015 | ||
FI | 24.06.2015 | ||
HR | 24.06.2015 | ||
LT | 24.06.2015 | ||
LV | 24.06.2015 | ||
PL | 24.06.2015 | ||
RO | 24.06.2015 | ||
RS | 24.06.2015 | ||
SK | 24.06.2015 | ||
BG | 24.09.2015 | ||
NO | 24.09.2015 | ||
GR | 25.09.2015 | ||
IS | 24.10.2015 | ||
PT | 26.10.2015 | ||
Former [2016/09] | EE | 24.06.2015 | |
FI | 24.06.2015 | ||
HR | 24.06.2015 | ||
LT | 24.06.2015 | ||
LV | 24.06.2015 | ||
RS | 24.06.2015 | ||
BG | 24.09.2015 | ||
NO | 24.09.2015 | ||
GR | 25.09.2015 | ||
Former [2015/50] | FI | 24.06.2015 | |
HR | 24.06.2015 | ||
LT | 24.06.2015 | ||
LV | 24.06.2015 | ||
RS | 24.06.2015 | ||
BG | 24.09.2015 | ||
NO | 24.09.2015 | ||
GR | 25.09.2015 | ||
Former [2015/49] | FI | 24.06.2015 | |
HR | 24.06.2015 | ||
LT | 24.06.2015 | ||
LV | 24.06.2015 | ||
RS | 24.06.2015 | ||
NO | 24.09.2015 | ||
GR | 25.09.2015 | Cited in | International search | [XAI]EP1832947 (FANUC LTD [JP]) [X] 1-3,6-11,14-18,21,22 * paragraphs [0021] - [0030] * [A] 5,13,20[I] 4,12,19 | by applicant | EP1832947 |