EP2569832 - EDGE-EMITTING SEMICONDUCTOR LASER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 16.10.2020 Database last updated on 15.05.2024 | |
Former | The patent has been granted Status updated on 08.11.2019 | ||
Former | Grant of patent is intended Status updated on 12.08.2019 | ||
Former | Examination is in progress Status updated on 20.10.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states OSRAM Opto Semiconductors GmbH Leibnizstraße 4 93055 Regensburg / DE | [2019/37] |
Former [2013/12] | For all designated states Osram Opto Semiconductors Gmbh Leibnizstr 4 93055 Regensburg / DE | Inventor(s) | 01 /
KÖNIG, Harald Am Eichelacker 14 93170 Bernhardswald / DE | 02 /
STRAUSS, Uwe Erich-Kästner-Str. 32 93077 Bad Abbach / DE | 03 /
REILL, Wolfgang Schulstr. 12 93080 Pentling / DE | [2013/12] | Representative(s) | Epping - Hermann - Fischer Patentanwaltsgesellschaft mbH Schloßschmidstraße 5 80639 München / DE | [2019/50] |
Former [2013/12] | Epping - Hermann - Fischer Patentanwaltsgesellschaft mbH Ridlerstrasse 55 80339 München / DE | Application number, filing date | 11724985.4 | 09.05.2011 | [2019/50] | WO2011EP57415 | Priority number, date | DE20101020625 | 14.05.2010 Original published format: DE102010020625 | [2013/12] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | WO2011141421 | Date: | 17.11.2011 | Language: | DE | [2011/46] | Type: | A2 Application without search report | No.: | EP2569832 | Date: | 20.03.2013 | Language: | DE | The application published by WIPO in one of the EPO official languages on 17.11.2011 takes the place of the publication of the European patent application. | [2013/12] | Type: | B1 Patent specification | No.: | EP2569832 | Date: | 11.12.2019 | Language: | DE | [2019/50] | Search report(s) | International search report - published on: | EP | 28.06.2012 | Classification | IPC: | H01S5/042, H01S5/0625, H01S5/40 | [2013/12] | CPC: |
H01S5/4031 (EP,US);
H01S5/30 (US);
H01L33/005 (US);
H01S5/04254 (EP,US);
H01L2924/0002 (EP,US);
H01S5/0201 (EP,US);
H01S5/0237 (EP);
H01S5/0283 (EP,US);
H01S5/0625 (EP,US);
| C-Set: |
H01L2924/0002, H01L2924/00 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/12] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | KANTENEMITTIERENDER HALBLEITERLASER | [2013/12] | English: | EDGE-EMITTING SEMICONDUCTOR LASER | [2013/12] | French: | LASER À SEMI-CONDUCTEURS À ÉMISSION LATÉRALE | [2013/12] | Entry into regional phase | 09.10.2012 | National basic fee paid | 09.10.2012 | Designation fee(s) paid | 09.10.2012 | Examination fee paid | Examination procedure | 09.10.2012 | Examination requested [2013/12] | 21.06.2013 | Amendment by applicant (claims and/or description) | 24.10.2017 | Despatch of a communication from the examining division (Time limit: M04) | 08.01.2018 | Reply to a communication from the examining division | 13.08.2019 | Communication of intention to grant the patent | 30.10.2019 | Fee for grant paid | 30.10.2019 | Fee for publishing/printing paid | 30.10.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 24.10.2017 | Opposition(s) | 14.09.2020 | No opposition filed within time limit [2020/47] | Fees paid | Renewal fee | 24.05.2013 | Renewal fee patent year 03 | 22.05.2014 | Renewal fee patent year 04 | 21.05.2015 | Renewal fee patent year 05 | 20.05.2016 | Renewal fee patent year 06 | 23.05.2017 | Renewal fee patent year 07 | 25.05.2018 | Renewal fee patent year 08 | 23.05.2019 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.05.2011 | AL | 11.12.2019 | CY | 11.12.2019 | CZ | 11.12.2019 | DK | 11.12.2019 | EE | 11.12.2019 | ES | 11.12.2019 | FI | 11.12.2019 | HR | 11.12.2019 | IT | 11.12.2019 | LT | 11.12.2019 | LV | 11.12.2019 | MC | 11.12.2019 | MK | 11.12.2019 | MT | 11.12.2019 | NL | 11.12.2019 | PL | 11.12.2019 | RO | 11.12.2019 | RS | 11.12.2019 | SE | 11.12.2019 | SI | 11.12.2019 | SK | 11.12.2019 | SM | 11.12.2019 | TR | 11.12.2019 | BG | 11.03.2020 | NO | 11.03.2020 | GR | 12.03.2020 | IS | 11.04.2020 | PT | 06.05.2020 | AT | 09.05.2020 | GB | 09.05.2020 | IE | 09.05.2020 | LU | 09.05.2020 | BE | 31.05.2020 | CH | 31.05.2020 | FR | 31.05.2020 | LI | 31.05.2020 | [2022/32] |
Former [2022/27] | HU | 09.05.2011 | |
AL | 11.12.2019 | ||
CY | 11.12.2019 | ||
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
MT | 11.12.2019 | ||
NL | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
TR | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
AT | 09.05.2020 | ||
GB | 09.05.2020 | ||
IE | 09.05.2020 | ||
LU | 09.05.2020 | ||
BE | 31.05.2020 | ||
CH | 31.05.2020 | ||
FR | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2022/26] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
NL | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
TR | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
AT | 09.05.2020 | ||
GB | 09.05.2020 | ||
IE | 09.05.2020 | ||
LU | 09.05.2020 | ||
BE | 31.05.2020 | ||
CH | 31.05.2020 | ||
FR | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/37] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
NL | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
AT | 09.05.2020 | ||
GB | 09.05.2020 | ||
IE | 09.05.2020 | ||
LU | 09.05.2020 | ||
BE | 31.05.2020 | ||
CH | 31.05.2020 | ||
FR | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/23] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
NL | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
GB | 09.05.2020 | ||
IE | 09.05.2020 | ||
LU | 09.05.2020 | ||
BE | 31.05.2020 | ||
CH | 31.05.2020 | ||
FR | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/22] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
NL | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
GB | 09.05.2020 | ||
IE | 09.05.2020 | ||
LU | 09.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/20] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
NL | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
IE | 09.05.2020 | ||
LU | 09.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/15] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
NL | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
LU | 09.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/10] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
IT | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
NL | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/08] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2020/51] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
Former [2020/47] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
DK | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
Former [2020/40] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
Former [2020/37] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
PT | 06.05.2020 | ||
Former [2020/36] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
EE | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
PT | 06.05.2020 | ||
Former [2020/35] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/32] | AL | 11.12.2019 | |
ES | 11.12.2019 | ||
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
NL | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/26] | ES | 11.12.2019 | |
FI | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
RS | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/23] | ES | 11.12.2019 | |
FI | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/22] | FI | 11.12.2019 | |
LT | 11.12.2019 | ||
SE | 11.12.2019 | ||
BG | 11.03.2020 | ||
NO | 11.03.2020 | ||
Former [2020/21] | NO | 11.03.2020 | Cited in | International search | [A]JPH01251686 (CANON KK) [A] 1-7* abstract *; | [I]US5561682 (AOKI MASAHIRO [JP], et al) [I] 1-7 * figure 7 *; | [X]DE19708385 (DEUTSCHE TELEKOM AG [DE]) [X] 1 * figure 1 *; | [X]EP1460742 (FUJITSU LTD [JP]) [X] 1 * figure 1 *; | [I]EP1710876 (MATSUSHITA ELECTRIC IND CO LTD [JP]) [I] 1-15 * figures 1,7 *; | [I]EP1713150 (FUJITSU LTD [JP]) [I] 1-7 * figures 6D,7,8 * | Examination | JPH01251686 | US2009310630 | - STAREEV G, "FORMATION OF EXTREMELY LOW RESISTANCE TI/PT/AU OHMIC CONTACTS TO P-GAAS", APPLIED PHYSICS LETTERS, A I P PUBLISHING LLC, US, (19930531), vol. 62, no. 22, doi:10.1063/1.109214, ISSN 0003-6951, pages 2801 - 2803, XP000380907 DOI: http://dx.doi.org/10.1063/1.109214 | by applicant | US5561682 | DE19708385 | EP1460742 | EP1710876 | EP1713150 | DE102010020625 |