EP2583212 - MASS STORAGE DEVICE MEMORY ENCRYPTION METHODS, SYSTEMS, AND APPARATUS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.07.2020 Database last updated on 05.07.2024 | |
Former | The patent has been granted Status updated on 12.07.2019 | ||
Former | Grant of patent is intended Status updated on 21.02.2019 | ||
Former | Examination is in progress Status updated on 20.01.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states OneSpan International GmbH World-Wide Business Center Balz-Zimmermannstrasse 7 8152 Glattbrugg / CH | [2018/34] |
Former [2013/19] | For all designated states Vasco Data Security International GmbH World-Wide Business Center Balsberg Balz-Zimmermannstrasse 7 8152 Glattbrugg / CH | ||
Former [2013/17] | For all designated states Vasco Data Security Inc. Suite 210, 1901 South Meyers Road Oakbrook Terrace, IL 60181 / US | ||
For all designated states Vasco Data Security International GmbH World-Wide Business Center Balz-Zimmermannstrasse 7 8152 Glattbrugg / CH | Inventor(s) | 01 /
BRAAMS, Harm Kiezelmonde 11 NL-3434 GD Nieuwegein / NL | [2013/17] | Representative(s) | Beck, Michaël Andries T., et al IPLodge Technologielaan 9 3001 Heverlee / BE | [N/P] |
Former [2019/33] | Beck, Michaël Andries T., et al IPLodge bvba Technologielaan 9 3001 Heverlee / BE | ||
Former [2013/26] | Beck, Michaël Andries T., et al IPLodge Bondgenotenlaan 93/5 3000 Leuven / BE | ||
Former [2013/17] | Beck, Michaël Andries T Arnold Siedsma Sweelinckplein 1 2517 GK The Hague / NL | Application number, filing date | 11729812.5 | 16.06.2011 | [2019/33] | WO2011US40729 | Priority number, date | US20100355399P | 16.06.2010 Original published format: US 355399 P | [2013/17] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2011159918 | Date: | 22.12.2011 | Language: | EN | [2011/51] | Type: | A2 Application without search report | No.: | EP2583212 | Date: | 24.04.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 22.12.2011 takes the place of the publication of the European patent application. | [2013/17] | Type: | B1 Patent specification | No.: | EP2583212 | Date: | 14.08.2019 | Language: | EN | [2019/33] | Search report(s) | International search report - published on: | EP | 03.05.2012 | Classification | IPC: | G06F21/79, G06F21/62 | [2019/09] | CPC: |
G06F21/78 (EP);
G06F21/62 (US);
G06F21/79 (US)
|
Former IPC [2013/17] | G06F21/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/17] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN, SYSTEME UND VORRICHTUNG ZUR SPEICHERVERSCHLÜSSELUNG BEI EINER MASSENSPEICHERVORRICHTUNG | [2013/17] | English: | MASS STORAGE DEVICE MEMORY ENCRYPTION METHODS, SYSTEMS, AND APPARATUS | [2013/17] | French: | PROCÉDÉS, SYSTÈMES ET APPAREIL DE CHIFFREMENT DE MÉMOIRE DE DISPOSITIF DE STOCKAGE DE MASSE | [2013/17] | Entry into regional phase | 15.01.2013 | National basic fee paid | 15.01.2013 | Designation fee(s) paid | 15.01.2013 | Examination fee paid | Examination procedure | 15.01.2013 | Examination requested [2013/17] | 24.07.2013 | Amendment by applicant (claims and/or description) | 19.01.2017 | Despatch of a communication from the examining division (Time limit: M04) | 29.05.2017 | Reply to a communication from the examining division | 22.02.2019 | Communication of intention to grant the patent | 03.07.2019 | Fee for grant paid | 03.07.2019 | Fee for publishing/printing paid | 03.07.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 19.01.2017 | Opposition(s) | 03.06.2020 | No opposition filed within time limit [2020/32] | Fees paid | Renewal fee | 10.06.2013 | Renewal fee patent year 03 | 31.03.2014 | Renewal fee patent year 04 | 10.06.2015 | Renewal fee patent year 05 | 10.06.2016 | Renewal fee patent year 06 | 16.06.2017 | Renewal fee patent year 07 | 11.06.2018 | Renewal fee patent year 08 | 13.06.2019 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.06.2011 | AL | 14.08.2019 | AT | 14.08.2019 | CY | 14.08.2019 | CZ | 14.08.2019 | DK | 14.08.2019 | EE | 14.08.2019 | ES | 14.08.2019 | FI | 14.08.2019 | HR | 14.08.2019 | IT | 14.08.2019 | LT | 14.08.2019 | LV | 14.08.2019 | MC | 14.08.2019 | MK | 14.08.2019 | MT | 14.08.2019 | NL | 14.08.2019 | PL | 14.08.2019 | RO | 14.08.2019 | RS | 14.08.2019 | SE | 14.08.2019 | SI | 14.08.2019 | SK | 14.08.2019 | SM | 14.08.2019 | TR | 14.08.2019 | BG | 14.11.2019 | NO | 14.11.2019 | GR | 15.11.2019 | IS | 14.12.2019 | PT | 16.12.2019 | [2022/32] |
Former [2022/27] | HU | 16.06.2011 | |
AL | 14.08.2019 | ||
AT | 14.08.2019 | ||
CY | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
IT | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
MC | 14.08.2019 | ||
MT | 14.08.2019 | ||
NL | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
SI | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2021/12] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
IT | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
MC | 14.08.2019 | ||
NL | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
SI | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/37] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
IT | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
SI | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/36] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
IT | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/27] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
IT | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
SK | 14.08.2019 | ||
SM | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
PT | 16.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
CZ | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
IT | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
SK | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
PT | 16.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
IT | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
PT | 16.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AL | 14.08.2019 | |
AT | 14.08.2019 | ||
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
IT | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
PL | 14.08.2019 | ||
RO | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/22] | AL | 14.08.2019 | |
DK | 14.08.2019 | ||
EE | 14.08.2019 | ||
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/17] | AL | 14.08.2019 | |
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
TR | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/15] | AL | 14.08.2019 | |
ES | 14.08.2019 | ||
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/12] | ES | 14.08.2019 | |
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
IS | 14.12.2019 | ||
PT | 16.12.2019 | ||
Former [2020/11] | ES | 14.08.2019 | |
FI | 14.08.2019 | ||
HR | 14.08.2019 | ||
LT | 14.08.2019 | ||
LV | 14.08.2019 | ||
NL | 14.08.2019 | ||
RS | 14.08.2019 | ||
SE | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
GR | 15.11.2019 | ||
PT | 16.12.2019 | ||
Former [2020/10] | FI | 14.08.2019 | |
LT | 14.08.2019 | ||
NL | 14.08.2019 | ||
SE | 14.08.2019 | ||
BG | 14.11.2019 | ||
NO | 14.11.2019 | ||
PT | 16.12.2019 | ||
Former [2020/09] | FI | 14.08.2019 | |
LT | 14.08.2019 | ||
NL | 14.08.2019 | ||
NO | 14.11.2019 | ||
Former [2020/08] | LT | 14.08.2019 | |
NO | 14.11.2019 | Cited in | International search | [A]EP0455064 (NAT SEMICONDUCTOR CORP [US]) [A] 1-18* figure 3; claim 1 *; | [YA]US6014745 (ASHE VINCENT [IE]) [Y] 5,6 * claim 1 * [A] 1-4,7-18; | [XY]US2007198856 (LEE CHARLES C [US], et al) [X] 1-4,16-18 * paragraphs [0041] - [0043]; figures 6,7,13; claim 1 * [Y] 5,6; | [XAI]WO2008127408 (MICRON TECHNOLOGY INC [US], et al) [X] 1-4,16-18 * figure 1 * [A] 7-15 [I] 5,6 | by applicant | - UNIVERSAL SERIAL BUS - DEVICE CLASS: SMART CARD - CCID - SPECIFICATION FOR INTEGRATED CIRCUIT(S) CARDS INTERFACE DEVICES - REVISION 1.1, URL: en. wikipedia. org/wiki/Integrated_Circuit_Card_Interface_Device | US19990613553 |