blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2504126

EP2504126 - WAFER POLISHING APPARATUS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  26.03.2021
Database last updated on 03.08.2024
FormerThe patent has been granted
Status updated on  17.04.2020
FormerGrant of patent is intended
Status updated on  10.12.2019
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
LG Siltron Inc.
274, Imsu-dong Gumi-si
Gyeongbuk 730-350 / KR
[2012/40]
Inventor(s)01 / LEE, Hyung Rak
265 Bunji
Dae-ui-ri Gogyeong-myeon
Yeongcheon-si
Gyeongbuk 770-842 / KR
 [2012/40]
Representative(s)Novagraaf Technologies
Bâtiment O2
2, rue Sarah Bernhardt
CS90017
92665 Asnières-sur-Seine Cedex / FR
[2020/21]
Former [2012/40]Novagraaf Technologies
122, rue Edouard Vaillant
92593 Levallois-Perret Cedex / FR
Application number, filing date11731891.505.01.2011
[2020/21]
WO2011KR00034
Priority number, dateKR2010000231111.01.2010         Original published format: KR 20100002311
[2012/40]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report
No.:WO2011083953
Date:14.07.2011
Language:EN
[2011/28]
Type: A2 Application without search report 
No.:EP2504126
Date:03.10.2012
Language:EN
The application published by WIPO in one of the EPO official languages on 14.07.2011 takes the place of the publication of the European patent application.
[2012/40]
Type: B1 Patent specification 
No.:EP2504126
Date:20.05.2020
Language:EN
[2020/21]
Search report(s)International search report - published on:KR15.12.2011
(Supplementary) European search report - dispatched on:EP27.07.2016
ClassificationIPC:B24B37/00, H01L21/304, B24B37/08, B24B37/11, B24D13/12
[2019/49]
CPC:
B24B37/08 (EP,US); B24B37/11 (EP,US); B24D13/12 (EP,US)
Former IPC [2012/40]B24B37/00, H01L21/304
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2012/40]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:WAFERPOLIERVORRICHTUNG[2012/40]
English:WAFER POLISHING APPARATUS[2012/40]
French:APPAREIL DE POLISSAGE DE TRANCHE[2012/40]
Entry into regional phase25.06.2012National basic fee paid 
25.06.2012Search fee paid 
25.06.2012Designation fee(s) paid 
25.06.2012Examination fee paid 
Examination procedure25.06.2012Examination requested  [2012/40]
03.02.2017Amendment by applicant (claims and/or description)
11.12.2019Communication of intention to grant the patent
10.04.2020Fee for grant paid
10.04.2020Fee for publishing/printing paid
10.04.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  11.12.2019
Opposition(s)23.02.2021No opposition filed within time limit [2021/17]
Fees paidRenewal fee
28.01.2013Renewal fee patent year 03
17.01.2014Renewal fee patent year 04
29.01.2015Renewal fee patent year 05
29.01.2016Renewal fee patent year 06
08.12.2016Renewal fee patent year 07
24.11.2017Renewal fee patent year 08
28.01.2019Renewal fee patent year 09
30.01.2020Renewal fee patent year 10
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU05.01.2011
AL20.05.2020
AT20.05.2020
CY20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
MK20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
TR20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
PT21.09.2020
GB05.01.2021
IE05.01.2021
LU05.01.2021
BE31.01.2021
CH31.01.2021
FR31.01.2021
LI31.01.2021
[2024/29]
Former [2024/22]HU05.01.2011
AL20.05.2020
AT20.05.2020
CY20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
MK20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
PT21.09.2020
GB05.01.2021
IE05.01.2021
LU05.01.2021
BE31.01.2021
CH31.01.2021
FR31.01.2021
LI31.01.2021
Former [2023/27]HU05.01.2011
AL20.05.2020
AT20.05.2020
CY20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
PT21.09.2020
GB05.01.2021
IE05.01.2021
LU05.01.2021
BE31.01.2021
CH31.01.2021
FR31.01.2021
LI31.01.2021
Former [2023/24]AL20.05.2020
AT20.05.2020
CY20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
PT21.09.2020
GB05.01.2021
IE05.01.2021
LU05.01.2021
BE31.01.2021
CH31.01.2021
FR31.01.2021
LI31.01.2021
Former [2022/33]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
PT21.09.2020
GB05.01.2021
IE05.01.2021
LU05.01.2021
BE31.01.2021
CH31.01.2021
FR31.01.2021
LI31.01.2021
Former [2022/10]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
PT21.09.2020
GB05.01.2021
IE05.01.2021
LU05.01.2021
CH31.01.2021
FR31.01.2021
LI31.01.2021
Former [2022/07]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
GB05.01.2021
IE05.01.2021
LU05.01.2021
CH31.01.2021
FR31.01.2021
LI31.01.2021
Former [2021/52]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
GB05.01.2021
LU05.01.2021
CH31.01.2021
FR31.01.2021
LI31.01.2021
Former [2021/49]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
GB05.01.2021
LU05.01.2021
FR31.01.2021
Former [2021/48]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
LU05.01.2021
FR31.01.2021
Former [2021/43]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
LU05.01.2021
Former [2021/40]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/24]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/10]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/09]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
NL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/08]AL20.05.2020
DK20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
NL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/04]AL20.05.2020
FI20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
NL20.05.2020
RS20.05.2020
SE20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/01]FI20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
RS20.05.2020
SE20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2020/51]FI20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
RS20.05.2020
SE20.05.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2020/50]FI20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
SE20.05.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2020/48]FI20.05.2020
LT20.05.2020
SE20.05.2020
NO20.08.2020
IS20.09.2020
PT21.09.2020
Former [2020/47]LT20.05.2020
NO20.08.2020
IS20.09.2020
Former [2020/46]IS20.09.2020
Documents cited:Search[Y]US5351447  (GRAUERT ROBERT J [US]) [Y] 6 * figure 1 *;
 [Y]WO9640473  (CLOVER RICHMOND B [US]) [Y] 11-13 * figures 3,10,18 *;
 [XYI]JPH1190801  (TOYO ADVANCED TECH CO) [X] 1,3,4,7-9 * abstract * [Y] 5,6,11-13 [I] 2,10;
 [Y]EP1002626  (CHARTERED SEMICONDUCTOR MFG [SG]) [Y] 5 * paragraph [0040]; figures 3B, 4A, 4B *;
 [A]JP2001030158  (SONY CORP) [A] 6* figure 2 *
International search[A]JPH1080861  (SUPER SILICON KENKYUSHO KK);
 [X]JPH1190801  (TOYO ADVANCED TECH CO);
 [Y]JP2000108022  (SYSTEMSEIKO CO LTD);
 [A]JP2009285774  (SHOWA DENKO KK)
by applicantJPH1190801
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.