blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2537396

EP2537396 - CONTROLLING OUTPUT CURRENT FROM AN ELECTRONIC DRIVE SYSTEM OF FLY-BACK TYPE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.03.2021
Database last updated on 13.07.2024
FormerThe patent has been granted
Status updated on  03.04.2020
FormerGrant of patent is intended
Status updated on  02.12.2019
FormerExamination is in progress
Status updated on  02.12.2016
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024 [2024/29]
Applicant(s)For all designated states
Nordic Light Ab
Box 390
931 24 Skellefteå / SE
[2012/52]
Inventor(s)01 / SKÖLD, Niclas
Roddargatan 6
S-931 54 Skellefteå / SE
02 / LINDSTRÖM, Henrik
Västra Hjoggböle 335
S-931 54 Skellefteå / SE
 [2020/01]
Former [2012/52]01 / SKÖLD, Niclas
Roddargatan 6
S-931 54 Skellefteå / SE
02 / LINDSTRÖM, Henrik
Västra Hjoggböle 335
SKELLEFTEÅ 931 94 / SE
Representative(s)Zacco Sweden AB
P.O. Box 5581
Löjtnantsgatan 21
114 85 Stockholm / SE
[N/P]
Former [2020/19]Zacco Sweden AB
P.O. Box 5581
114 85 Stockholm / SE
Former [2014/45]Zacco Sweden AB
Valhallavägen 117
P.O. Box 5581
114 85 Stockholm / SE
Former [2012/52]Norman, Pia Christiane
Albihns.Zacco AB
Patent Department
P.O. Box 5581
114 85 Stockholm / SE
Application number, filing date11744979.321.02.2011
[2020/19]
WO2011SE50191
Priority number, dateSE2010005016319.02.2010         Original published format: SE 1050163
[2012/52]
Filing languageSV
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2011102799
Date:25.08.2011
Language:EN
[2011/34]
Type: A1 Application with search report 
No.:EP2537396
Date:26.12.2012
Language:EN
The application published by WIPO in one of the EPO official languages on 25.08.2011 takes the place of the publication of the European patent application.
[2012/52]
Type: B1 Patent specification 
No.:EP2537396
Date:06.05.2020
Language:EN
[2020/19]
Search report(s)International search report - published on:SE25.08.2011
(Supplementary) European search report - dispatched on:EP26.06.2015
ClassificationIPC:H02M3/335, H05B33/08, H02M1/42
[2019/49]
CPC:
H02M3/33507 (EP,US); H05B45/37 (SE); H02M1/4258 (EP);
H05B45/385 (EP,SE,US); H05B45/395 (EP,SE,US); H02M1/0045 (EP);
Y02B20/30 (EP); Y02B70/10 (EP) (-)
Former IPC [2015/31]H05B33/08, H02M3/335, H02M1/42
Former IPC [2012/52]H05B33/08, H02M3/335
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2012/52]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:STEUERUNG DES AUSGANGSSTROMS AUS EINEM ELEKTRONISCHEN FLYBACK-ANTRIEBSSYSTEM[2012/52]
English:CONTROLLING OUTPUT CURRENT FROM AN ELECTRONIC DRIVE SYSTEM OF FLY-BACK TYPE[2012/52]
French:RÉGULATION DU COURANT DE SORTIE PROVENANT D'UN SYSTÈME D'ENTRAÎNEMENT ÉLECTRONIQUE DE TYPE INDIRECT[2012/52]
Entry into regional phase23.08.2012National basic fee paid 
23.08.2012Search fee paid 
23.08.2012Designation fee(s) paid 
23.08.2012Examination fee paid 
Examination procedure18.11.2011Request for preliminary examination filed
International Preliminary Examining Authority: SE
23.08.2012Examination requested  [2012/52]
15.01.2016Amendment by applicant (claims and/or description)
01.12.2016Despatch of a communication from the examining division (Time limit: M06)
09.06.2017Reply to a communication from the examining division
08.10.2018Despatch of a communication from the examining division (Time limit: M04)
14.02.2019Reply to a communication from the examining division
03.12.2019Communication of intention to grant the patent
26.03.2020Fee for grant paid
26.03.2020Fee for publishing/printing paid
26.03.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  01.12.2016
Opposition(s)09.02.2021No opposition filed within time limit [2021/15]
Fees paidRenewal fee
12.02.2013Renewal fee patent year 03
12.02.2014Renewal fee patent year 04
11.02.2015Renewal fee patent year 05
10.02.2016Renewal fee patent year 06
10.02.2017Renewal fee patent year 07
14.02.2018Renewal fee patent year 08
13.02.2019Renewal fee patent year 09
19.02.2020Renewal fee patent year 10
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU21.02.2011
AL06.05.2020
AT06.05.2020
CY06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
MK06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
TR06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
[2024/29]
Former [2024/22]HU21.02.2011
AL06.05.2020
AT06.05.2020
CY06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
MK06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2023/27]HU21.02.2011
AL06.05.2020
AT06.05.2020
CY06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2023/24]AL06.05.2020
AT06.05.2020
CY06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/41]AL06.05.2020
AT06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/24]AL06.05.2020
AT06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/10]AL06.05.2020
AT06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/09]AL06.05.2020
AT06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
NL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SM06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/08]AL06.05.2020
DK06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
NL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SM06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/04]AL06.05.2020
FI06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
NL06.05.2020
RS06.05.2020
SE06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/01]FI06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
RS06.05.2020
SE06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2020/51]FI06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
RS06.05.2020
SE06.05.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2020/50]FI06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
SE06.05.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2020/48]FI06.05.2020
LT06.05.2020
SE06.05.2020
NO06.08.2020
IS06.09.2020
PT07.09.2020
Former [2020/47]LT06.05.2020
NO06.08.2020
IS06.09.2020
Former [2020/46]IS06.09.2020
Documents cited:Search[Y]GB2047444  (MATSUSHITA ELECTRIC IND CO LTD);
 [Y]US2006033481  (THIELE GERHARD [DE], et al);
 [A]US2009187925  (HU YUEQUAN [US], et al);
International search[A]US6369525  (CHANG CHIN [US], et al);
 [A]US2006132061  (MCCORMICK KEVIN [US], et al);
 [X]US2009187925  (HU YUEQUAN [US], et al);
by applicantUS2047444
 US2006033481
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.