EP2539768 - CALIBRATION METHOD FOR LED LIGHTING SYSTEMS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 19.04.2019 Database last updated on 28.05.2024 | |
Former | The patent has been granted Status updated on 11.05.2018 | ||
Former | Grant of patent is intended Status updated on 28.01.2018 | ||
Former | Examination is in progress Status updated on 07.12.2016 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states B/E Aerospace Inc. 1400 Corporate Center Way Wellington, FL 33414 / US | [2018/24] |
Former [2013/01] | For all designated states B/E Aerospace Inc. 1400 Corporate Center Way Wellington, FL 33414 / US | Inventor(s) | 01 /
GAMBESKI, Gannon, T. 287 Northern Boulevard Saint James, NY 11780 / US | 02 /
ECKEL, David, P. 12 Susan Drive Fort Salonga, NY 11768 / US | 03 /
SECILMIS, Seckin, K. 50 Crescent Cove Seaford, NY 11783 / US | 04 /
WALSH, Andrew, B. 57 Campbell Lane East Islip, NY 11730 / US | 05 /
WARING, Richard 10 Andrea Lane West Sayville, NY 11796 / US | 06 /
LEE, Rand c/o ORB Optronix 1003 7th Avenue Kirkland, WA 98033 / US | 07 /
JENKINS, David c/o ORB Optronix 1003 7th Avenue Kirkland, WA 98033 / US | 08 /
JAKUC, Maciej, Adam c/o ORB Optronix 1003 7th Avenue Kirkland, WA 98033 / US | 09 /
REEDER, Jeffrey c/o ORB Optronix 1003 7th Avenue Kirkland, WA 98033 / US | [2013/01] | Representative(s) | Williams, Ceili, et al Stevens Hewlett & Perkins 1 St Augustine's Place Bristol BS1 4UD / GB | [2018/24] |
Former [2013/01] | Marles, Alan David Stevens Hewlett & Perkins 1 St Augustine's Place Bristol BS1 4UD / GB | Application number, filing date | 11748155.6 | 25.02.2011 | [2018/24] | WO2011US26269 | Priority number, date | US20100320545P | 02.04.2010 Original published format: US 320545 P | US20100345378P | 17.05.2010 Original published format: US 345378 P | US20100308171P | 25.02.2010 Original published format: US 308171 P | [2013/01] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011106661 | Date: | 01.09.2011 | Language: | EN | [2011/35] | Type: | A1 Application with search report | No.: | EP2539768 | Date: | 02.01.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 01.09.2011 takes the place of the publication of the European patent application. | [2013/01] | Type: | B1 Patent specification | No.: | EP2539768 | Date: | 13.06.2018 | Language: | EN | [2018/24] | Search report(s) | International search report - published on: | US | 01.09.2011 | (Supplementary) European search report - dispatched on: | EP | 11.03.2014 | Classification | IPC: | G03F3/08, H05B33/08, B64D47/02, B64C27/82, B64D11/00 | [2014/14] | CPC: |
B64D47/02 (EP,US);
H05B45/20 (EP,US);
B64D2011/0038 (EP);
B64D2203/00 (EP)
|
Former IPC [2013/01] | G03F3/08 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/01] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | KALIBRIERUNGSVERFAHREN FÜR LED-BELEUCHTUNGSSYSTEME | [2013/01] | English: | CALIBRATION METHOD FOR LED LIGHTING SYSTEMS | [2013/01] | French: | PROCÉDÉ DE CALIBRATION POUR SYSTÈMES D'ÉCLAIRAGE À DEL | [2013/01] | Entry into regional phase | 20.09.2012 | National basic fee paid | 20.09.2012 | Search fee paid | 20.09.2012 | Designation fee(s) paid | 20.09.2012 | Examination fee paid | Examination procedure | 20.09.2012 | Examination requested [2013/01] | 07.10.2014 | Amendment by applicant (claims and/or description) | 27.05.2016 | Despatch of a communication from the examining division (Time limit: M06) | 06.12.2016 | Reply to a communication from the examining division | 13.03.2017 | Despatch of a communication from the examining division (Time limit: M06) | 20.09.2017 | Reply to a communication from the examining division | 29.01.2018 | Communication of intention to grant the patent | 04.05.2018 | Fee for grant paid | 04.05.2018 | Fee for publishing/printing paid | 04.05.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 27.05.2016 | Opposition(s) | 14.03.2019 | No opposition filed within time limit [2019/21] | Fees paid | Renewal fee | 29.04.2013 | Renewal fee patent year 03 | 28.04.2014 | Renewal fee patent year 04 | 27.04.2015 | Renewal fee patent year 05 | 26.02.2016 | Renewal fee patent year 06 | 27.02.2017 | Renewal fee patent year 07 | 27.02.2018 | Renewal fee patent year 08 | Penalty fee | Additional fee for renewal fee | 28.02.2013 | 03   M06   Fee paid on   29.04.2013 | 28.02.2014 | 04   M06   Fee paid on   28.04.2014 | 28.02.2015 | 05   M06   Fee paid on   27.04.2015 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 25.02.2011 | AL | 13.06.2018 | AT | 13.06.2018 | CY | 13.06.2018 | CZ | 13.06.2018 | DK | 13.06.2018 | EE | 13.06.2018 | ES | 13.06.2018 | FI | 13.06.2018 | HR | 13.06.2018 | IT | 13.06.2018 | LT | 13.06.2018 | LV | 13.06.2018 | MC | 13.06.2018 | MK | 13.06.2018 | PL | 13.06.2018 | RO | 13.06.2018 | RS | 13.06.2018 | SE | 13.06.2018 | SI | 13.06.2018 | SK | 13.06.2018 | SM | 13.06.2018 | TR | 13.06.2018 | BG | 13.09.2018 | NO | 13.09.2018 | GR | 14.09.2018 | IS | 13.10.2018 | PT | 15.10.2018 | IE | 25.02.2019 | LU | 25.02.2019 | MT | 25.02.2019 | BE | 28.02.2019 | CH | 28.02.2019 | LI | 28.02.2019 | [2022/31] |
Former [2021/32] | HU | 25.02.2011 | |
AL | 13.06.2018 | ||
AT | 13.06.2018 | ||
CY | 13.06.2018 | ||
CZ | 13.06.2018 | ||
DK | 13.06.2018 | ||
EE | 13.06.2018 | ||
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
IT | 13.06.2018 | ||
LT | 13.06.2018 | ||
LV | 13.06.2018 | ||
MC | 13.06.2018 | ||
PL | 13.06.2018 | ||
RO | 13.06.2018 | ||
RS | 13.06.2018 | ||
SE | 13.06.2018 | ||
SI | 13.06.2018 | ||
SK | 13.06.2018 | ||
SM | 13.06.2018 | ||
TR | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
GR | 14.09.2018 | ||
IS | 13.10.2018 | ||
PT | 15.10.2018 | ||
IE | 25.02.2019 | ||
LU | 25.02.2019 | ||
MT | 25.02.2019 | ||
BE | 28.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
Former [2020/29] | AL | 13.06.2018 | |
AT | 13.06.2018 | ||
CY | 13.06.2018 | ||
CZ | 13.06.2018 | ||
DK | 13.06.2018 | ||
EE | 13.06.2018 | ||
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
IT | 13.06.2018 | ||
LT | 13.06.2018 | ||
LV | 13.06.2018 | ||
MC | 13.06.2018 | ||
PL | 13.06.2018 | ||
RO | 13.06.2018 | ||
RS | 13.06.2018 | ||
SE | 13.06.2018 | ||
SI | 13.06.2018 | ||
SK | 13.06.2018 | ||
SM | 13.06.2018 | ||
TR | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
GR | 14.09.2018 | ||
IS | 13.10.2018 | ||
PT | 15.10.2018 | ||
IE | 25.02.2019 | ||
LU | 25.02.2019 | ||
MT | 25.02.2019 | ||
BE | 28.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
Former [2020/16] | AL | 13.06.2018 | |
AT | 13.06.2018 | ||
CY | 13.06.2018 | ||
CZ | 13.06.2018 | ||
DK | 13.06.2018 | ||
EE | 13.06.2018 | ||
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
IT | 13.06.2018 | ||
LT | 13.06.2018 | ||
LV | 13.06.2018 | ||
MC | 13.06.2018 | ||
PL | 13.06.2018 | ||
RO | 13.06.2018 | ||
RS | 13.06.2018 | ||
SE | 13.06.2018 | ||
SI | 13.06.2018 | ||
SK | 13.06.2018 | ||
SM | 13.06.2018 | ||
TR | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
GR | 14.09.2018 | ||
IS | 13.10.2018 | ||
IE | 25.02.2019 | ||
LU | 25.02.2019 | ||
BE | 28.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
Former [2020/12] | AL | 13.06.2018 | |
AT | 13.06.2018 | ||
CY | 13.06.2018 | ||
CZ | 13.06.2018 | ||
DK | 13.06.2018 | ||
EE | 13.06.2018 | ||
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
IT | 13.06.2018 | ||
LT | 13.06.2018 | ||
LV | 13.06.2018 | ||
MC | 13.06.2018 | ||
PL | 13.06.2018 | ||
RO | 13.06.2018 | ||
RS | 13.06.2018 | ||
SE | 13.06.2018 | ||
SI | 13.06.2018 | ||
SK | 13.06.2018 | ||
SM | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
GR | 14.09.2018 | ||
IS | 13.10.2018 | ||
IE | 25.02.2019 | ||
LU | 25.02.2019 | ||
BE | 28.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
Former [2020/09] | AL | 13.06.2018 | |
AT | 13.06.2018 | ||
CY | 13.06.2018 | ||
CZ | 13.06.2018 | ||
DK | 13.06.2018 | ||
EE | 13.06.2018 | ||
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
IT | 13.06.2018 | ||
LT | 13.06.2018 | ||
LV | 13.06.2018 | ||
MC | 13.06.2018 | ||
PL | 13.06.2018 | ||
RO | 13.06.2018 | ||
RS | 13.06.2018 | ||
SE | 13.06.2018 | ||
SI | 13.06.2018 | ||
SK | 13.06.2018 | ||
SM | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
GR | 14.09.2018 | ||
IS | 13.10.2018 | ||
IE | 25.02.2019 | ||
LU | 25.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
Former [2020/04] | AL | 13.06.2018 | |
AT | 13.06.2018 | ||
CY | 13.06.2018 | ||
CZ | 13.06.2018 | ||
DK | 13.06.2018 | ||
EE | 13.06.2018 | ||
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
IT | 13.06.2018 | ||
LT | 13.06.2018 | ||
LV | 13.06.2018 | ||
MC | 13.06.2018 | ||
PL | 13.06.2018 | ||
RO | 13.06.2018 | ||
RS | 13.06.2018 | ||
SE | 13.06.2018 | ||
SI | 13.06.2018 | ||
SK | 13.06.2018 | ||
SM | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
GR | 14.09.2018 | ||
IS | 13.10.2018 | ||
LU | 25.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
Former [2019/51] | AL | 13.06.2018 | |
AT | 13.06.2018 | ||
CY | 13.06.2018 | ||
CZ | 13.06.2018 | ||
DK | 13.06.2018 | ||
EE | 13.06.2018 | ||
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
IT | 13.06.2018 | ||
LT | 13.06.2018 | ||
LV | 13.06.2018 | ||
MC | 13.06.2018 | ||
PL | 13.06.2018 | ||
RO | 13.06.2018 | ||
RS | 13.06.2018 | ||
SE | 13.06.2018 | ||
SI | 13.06.2018 | ||
SK | 13.06.2018 | ||
SM | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
GR | 14.09.2018 | ||
IS | 13.10.2018 | ||
LU | 25.02.2019 | ||
Former [2019/47] | AT | 13.06.2018 | |
CY | 13.06.2018 | ||
CZ | 13.06.2018 | ||
DK | 13.06.2018 | ||
EE | 13.06.2018 | ||
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
IT | 13.06.2018 | ||
LT | 13.06.2018 | ||
LV | 13.06.2018 | ||
MC | 13.06.2018 | ||
PL | 13.06.2018 | ||
RO | 13.06.2018 | ||
RS | 13.06.2018 | ||
SE | 13.06.2018 | ||
SI | 13.06.2018 | ||
SK | 13.06.2018 | ||
SM | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
GR | 14.09.2018 | ||
IS | 13.10.2018 | ||
LU | 25.02.2019 | ||
Former [2019/45] | AT | 13.06.2018 | |
CY | 13.06.2018 | ||
CZ | 13.06.2018 | ||
DK | 13.06.2018 | ||
EE | 13.06.2018 | ||
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
IT | 13.06.2018 | ||
LT | 13.06.2018 | ||
LV | 13.06.2018 | ||
MC | 13.06.2018 | ||
PL | 13.06.2018 | ||
RO | 13.06.2018 | ||
RS | 13.06.2018 | ||
SE | 13.06.2018 | ||
SI | 13.06.2018 | ||
SK | 13.06.2018 | ||
SM | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
GR | 14.09.2018 | ||
IS | 13.10.2018 | ||
Former [2019/26] | AT | 13.06.2018 | |
CY | 13.06.2018 | ||
CZ | 13.06.2018 | ||
DK | 13.06.2018 | ||
EE | 13.06.2018 | ||
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
IT | 13.06.2018 | ||
LT | 13.06.2018 | ||
LV | 13.06.2018 | ||
PL | 13.06.2018 | ||
RO | 13.06.2018 | ||
RS | 13.06.2018 | ||
SE | 13.06.2018 | ||
SI | 13.06.2018 | ||
SK | 13.06.2018 | ||
SM | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
GR | 14.09.2018 | ||
IS | 13.10.2018 | ||
Former [2019/11] | AT | 13.06.2018 | |
CY | 13.06.2018 | ||
CZ | 13.06.2018 | ||
EE | 13.06.2018 | ||
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
IT | 13.06.2018 | ||
LT | 13.06.2018 | ||
LV | 13.06.2018 | ||
PL | 13.06.2018 | ||
RO | 13.06.2018 | ||
RS | 13.06.2018 | ||
SE | 13.06.2018 | ||
SK | 13.06.2018 | ||
SM | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
GR | 14.09.2018 | ||
IS | 13.10.2018 | ||
Former [2019/10] | AT | 13.06.2018 | |
CY | 13.06.2018 | ||
CZ | 13.06.2018 | ||
EE | 13.06.2018 | ||
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
LT | 13.06.2018 | ||
LV | 13.06.2018 | ||
PL | 13.06.2018 | ||
RO | 13.06.2018 | ||
RS | 13.06.2018 | ||
SE | 13.06.2018 | ||
SK | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
GR | 14.09.2018 | ||
IS | 13.10.2018 | ||
Former [2019/09] | CY | 13.06.2018 | |
EE | 13.06.2018 | ||
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
LT | 13.06.2018 | ||
LV | 13.06.2018 | ||
RS | 13.06.2018 | ||
SE | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
GR | 14.09.2018 | ||
IS | 13.10.2018 | ||
Former [2019/08] | CY | 13.06.2018 | |
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
LT | 13.06.2018 | ||
LV | 13.06.2018 | ||
RS | 13.06.2018 | ||
SE | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
GR | 14.09.2018 | ||
IS | 13.10.2018 | ||
Former [2018/52] | CY | 13.06.2018 | |
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
LT | 13.06.2018 | ||
LV | 13.06.2018 | ||
RS | 13.06.2018 | ||
SE | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
GR | 14.09.2018 | ||
Former [2018/51] | CY | 13.06.2018 | |
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
LT | 13.06.2018 | ||
LV | 13.06.2018 | ||
RS | 13.06.2018 | ||
SE | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
Former [2018/50] | CY | 13.06.2018 | |
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
HR | 13.06.2018 | ||
LT | 13.06.2018 | ||
SE | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
Former [2018/49] | CY | 13.06.2018 | |
ES | 13.06.2018 | ||
FI | 13.06.2018 | ||
LT | 13.06.2018 | ||
SE | 13.06.2018 | ||
BG | 13.09.2018 | ||
NO | 13.09.2018 | ||
Former [2018/47] | ES | 13.06.2018 | |
FI | 13.06.2018 | ||
LT | 13.06.2018 | ||
NO | 13.09.2018 | Documents cited: | Search | [Y]US2005275912 (CHEN YUNG-CHIH [TW], et al) [Y] 5 * the whole document *; | [XAI]WO2008056321 (KONINKL PHILIPS ELECTRONICS NV [NL], et al) [X] 1-3,5-7,9-15 * page 1, lines 2-4; figures 1-3 * * page 2, line 30 - page 6, line 29 * * page 7, line 16 - page 12, line 6 * [A] 8 [I] 4; | [XYI]US2008215279 (SALSBURY MARC [CA], et al) [X] 1-3,6,7,13,14 * the whole document * [Y] 5,10-12,15 [I] 4,8,9; | [Y]US2009021955 (KUANG BAIXIONG [US], et al) [Y] 15 * page 1, paragraphs 3, 10-12; figures 1-10, 14 * * page 2, paragraph 30 * * page 4, paragraph 42 - page 6, paragraph 55 * * claims 1-48 *; | [X]WO2009034060 (ARNOLD & RICHTER KG [DE], et al) [X] 1-15 * the whole document *; | [Y]WO2009035493 (CYPRESS SEMICONDUCTOR CORP [US], et al) [Y] 15* the whole document *; | [Y]US2010007588 (ZYGMUNT ANTHONY P [US], et al) [Y] 10-12 * the whole document *; | [I] - C. HOELEN, J. ANSEMS, P.DEURENBERG, W. VAN DUIJNEVELDT, M. PEETERS, G. STEENBRUGGEN, T. TREURNIET, A. VALSTER, J.W. TER WEEME, "Color Tunable LED Spot Lighting", PROCEEDINGS OF THE SIXTH INTERNATIONAL CONFERENCE ON SOLID STATE LIGHTING (SPIE), San Diego, California, (20060912), vol. 6337, XP002720441 [I] 1-15 * the whole document * DOI: http://dx.doi.org/10.1117/12.694799 | International search | [A]US2005174309 (BOUWENS LUC [BE], et al); | [Y]US2005275912 (CHEN YUNG-CHIH [TW], et al); | [A]US2007034775 (CHENG HENG Y [MY], et al); | [A]US2007103646 (YOUNG GARRETT J [US]); | [X]US2008215279 (SALSBURY MARC [CA], et al); | [A]US2009001251 (NG PAK HONG [HK], et al); | [Y]WO2009035493 (CYPRESS SEMICONDUCTOR CORP [US], et al); | [A]US2009140630 (KIJIMA NAOTO [JP], et al); | [Y]US2010007588 (ZYGMUNT ANTHONY P [US], et al) | by applicant | US2005275812 | WO2008065321 | US2008215279 | US2009021955 | WO2009034060 | WO2009035493 | US2010007588 | - C. HOELEN ET AL., "Color Tunable LED Spot Lighting", PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON SOLID STATE LIGHTING (SPIE, (2006), vol. 6337, doi:doi:10.1117/12.694799, XP002720441 DOI: http://dx.doi.org/10.1117/12.694799 |