EP2550477 - INTERFACE AND FABRICATION METHOD FOR LIGHTING AND OTHER ELECTRICAL DEVICES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 21.07.2017 Database last updated on 19.07.2024 | Most recent event Tooltip | 06.03.2020 | Lapse of the patent in a contracting state New state(s): TR | published on 08.04.2020 [2020/15] | Applicant(s) | For all designated states Cree, Inc. 4600 Silicon Drive Durham, NC 27703 / US | [2016/37] |
Former [2013/05] | For all designated states Cree, Inc. 4600 Silicon Dirve Durham, NC 27703 / US | Inventor(s) | 01 /
ADAMS, Edward, Roger 763 Highway 310 Englewood, TN 37329 / US | [2013/05] | Representative(s) | Bell, Mark Andrew, et al Dehns St Bride's House 10 Salisbury Square London EC4Y 8JD / GB | [2014/02] |
Former [2013/05] | Samuels, Adrian James Dehns St Bride's House 10 Salisbury Square London EC4Y 8JD / GB | Application number, filing date | 11759860.7 | 08.02.2011 | [2016/37] | WO2011US24086 | Priority number, date | US20100730802 | 24.03.2010 Original published format: US 730802 | [2013/05] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2011119263 | Date: | 29.09.2011 | Language: | EN | [2011/39] | Type: | A2 Application without search report | No.: | EP2550477 | Date: | 30.01.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 29.09.2011 takes the place of the publication of the European patent application. | [2013/05] | Type: | B1 Patent specification | No.: | EP2550477 | Date: | 14.09.2016 | Language: | EN | [2016/37] | Search report(s) | International search report - published on: | KR | 01.12.2011 | (Supplementary) European search report - dispatched on: | EP | 07.01.2014 | Classification | IPC: | F21S2/00, F21V15/01, F21V23/00 | [2016/34] | CPC: |
F21K9/23 (EP,US);
F21K9/90 (EP,US);
F21V23/06 (US);
F21V29/773 (EP,US);
F21V7/0008 (EP,US);
H01J5/54 (EP,US);
H05K3/403 (EP,US);
F21Y2115/10 (EP,US);
H05K1/117 (EP,US);
H05K2201/1034 (EP,US)
(-)
|
Former IPC [2014/04] | F21S2/00, F21V15/01, F21V23/00, F21V29/00, F21K99/00, F21V7/00, H01J5/54, H05K1/11, H05K3/40, F21Y101/02 | ||
Former IPC [2013/05] | F21S2/00, F21V15/01, F21V23/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/05] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SCHNITTSTELLE UND HERSTELLUNGSVERFAHREN FÜR BELEUCHTUNGEN UND ANDERE ELEKTRISCHE VORRICHTUNGEN | [2013/05] | English: | INTERFACE AND FABRICATION METHOD FOR LIGHTING AND OTHER ELECTRICAL DEVICES | [2013/05] | French: | INTERFACE ET PROCÉDÉ DE FABRICATION D'ÉCLAIRAGE ET AUTRES DISPOSITIFS ÉLECTRIQUES | [2013/05] | Entry into regional phase | 10.10.2012 | National basic fee paid | 10.10.2012 | Search fee paid | 10.10.2012 | Designation fee(s) paid | 10.10.2012 | Examination fee paid | Examination procedure | 10.10.2012 | Examination requested [2013/05] | 22.07.2014 | Amendment by applicant (claims and/or description) | 21.01.2016 | Communication of intention to grant the patent | 31.05.2016 | Fee for grant paid | 31.05.2016 | Fee for publishing/printing paid | 31.05.2016 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 21.01.2016 | Opposition(s) | 15.06.2017 | No opposition filed within time limit [2017/34] | Fees paid | Renewal fee | 12.04.2013 | Renewal fee patent year 03 | 12.02.2014 | Renewal fee patent year 04 | 11.02.2015 | Renewal fee patent year 05 | 10.02.2016 | Renewal fee patent year 06 | Penalty fee | Additional fee for renewal fee | 28.02.2013 | 03   M06   Fee paid on   12.04.2013 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 08.02.2011 | AL | 14.09.2016 | AT | 14.09.2016 | BE | 14.09.2016 | CY | 14.09.2016 | CZ | 14.09.2016 | DK | 14.09.2016 | EE | 14.09.2016 | ES | 14.09.2016 | FI | 14.09.2016 | HR | 14.09.2016 | IT | 14.09.2016 | LT | 14.09.2016 | LV | 14.09.2016 | MC | 14.09.2016 | MK | 14.09.2016 | NL | 14.09.2016 | PL | 14.09.2016 | RO | 14.09.2016 | RS | 14.09.2016 | SE | 14.09.2016 | SI | 14.09.2016 | SK | 14.09.2016 | SM | 14.09.2016 | TR | 14.09.2016 | BG | 14.12.2016 | NO | 14.12.2016 | GR | 15.12.2016 | IS | 14.01.2017 | PT | 16.01.2017 | IE | 08.02.2017 | LU | 08.02.2017 | MT | 08.02.2017 | CH | 28.02.2017 | FR | 28.02.2017 | LI | 28.02.2017 | [2020/15] |
Former [2019/51] | HU | 08.02.2011 | |
AL | 14.09.2016 | ||
AT | 14.09.2016 | ||
BE | 14.09.2016 | ||
CY | 14.09.2016 | ||
CZ | 14.09.2016 | ||
DK | 14.09.2016 | ||
EE | 14.09.2016 | ||
ES | 14.09.2016 | ||
FI | 14.09.2016 | ||
HR | 14.09.2016 | ||
IT | 14.09.2016 | ||
LT | 14.09.2016 | ||
LV | 14.09.2016 | ||
MC | 14.09.2016 | ||
MK | 14.09.2016 | ||
NL | 14.09.2016 | ||
PL | 14.09.2016 | ||
RO | 14.09.2016 | ||
RS | 14.09.2016 | ||
SE | 14.09.2016 | ||
SI | 14.09.2016 | ||
SK | 14.09.2016 | ||
SM | 14.09.2016 | ||
BG | 14.12.2016 | ||
NO | 14.12.2016 | ||
GR | 15.12.2016 | ||
IS | 14.01.2017 | ||
PT | 16.01.2017 | ||
IE | 08.02.2017 | ||
LU | 08.02.2017 | ||
MT | 08.02.2017 | ||
CH | 28.02.2017 | ||
FR | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2019/46] | HU | 08.02.2011 | |
AL | 14.09.2016 | ||
AT | 14.09.2016 | ||
BE | 14.09.2016 | ||
CY | 14.09.2016 | ||
CZ | 14.09.2016 | ||
DK | 14.09.2016 | ||
EE | 14.09.2016 | ||
ES | 14.09.2016 | ||
FI | 14.09.2016 | ||
HR | 14.09.2016 | ||
IT | 14.09.2016 | ||
LT | 14.09.2016 | ||
LV | 14.09.2016 | ||
MC | 14.09.2016 | ||
NL | 14.09.2016 | ||
PL | 14.09.2016 | ||
RO | 14.09.2016 | ||
RS | 14.09.2016 | ||
SE | 14.09.2016 | ||
SI | 14.09.2016 | ||
SK | 14.09.2016 | ||
SM | 14.09.2016 | ||
BG | 14.12.2016 | ||
NO | 14.12.2016 | ||
GR | 15.12.2016 | ||
IS | 14.01.2017 | ||
PT | 16.01.2017 | ||
IE | 08.02.2017 | ||
LU | 08.02.2017 | ||
MT | 08.02.2017 | ||
CH | 28.02.2017 | ||
FR | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2019/31] | HU | 08.02.2011 | |
AL | 14.09.2016 | ||
AT | 14.09.2016 | ||
BE | 14.09.2016 | ||
CZ | 14.09.2016 | ||
DK | 14.09.2016 | ||
EE | 14.09.2016 | ||
ES | 14.09.2016 | ||
FI | 14.09.2016 | ||
HR | 14.09.2016 | ||
IT | 14.09.2016 | ||
LT | 14.09.2016 | ||
LV | 14.09.2016 | ||
MC | 14.09.2016 | ||
NL | 14.09.2016 | ||
PL | 14.09.2016 | ||
RO | 14.09.2016 | ||
RS | 14.09.2016 | ||
SE | 14.09.2016 | ||
SI | 14.09.2016 | ||
SK | 14.09.2016 | ||
SM | 14.09.2016 | ||
BG | 14.12.2016 | ||
NO | 14.12.2016 | ||
GR | 15.12.2016 | ||
IS | 14.01.2017 | ||
PT | 16.01.2017 | ||
IE | 08.02.2017 | ||
LU | 08.02.2017 | ||
MT | 08.02.2017 | ||
CH | 28.02.2017 | ||
FR | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2018/47] | AL | 14.09.2016 | |
AT | 14.09.2016 | ||
BE | 14.09.2016 | ||
CZ | 14.09.2016 | ||
DK | 14.09.2016 | ||
EE | 14.09.2016 | ||
ES | 14.09.2016 | ||
FI | 14.09.2016 | ||
HR | 14.09.2016 | ||
IT | 14.09.2016 | ||
LT | 14.09.2016 | ||
LV | 14.09.2016 | ||
MC | 14.09.2016 | ||
NL | 14.09.2016 | ||
PL | 14.09.2016 | ||
RO | 14.09.2016 | ||
RS | 14.09.2016 | ||
SE | 14.09.2016 | ||
SI | 14.09.2016 | ||
SK | 14.09.2016 | ||
SM | 14.09.2016 | ||
BG | 14.12.2016 | ||
NO | 14.12.2016 | ||
GR | 15.12.2016 | ||
IS | 14.01.2017 | ||
PT | 16.01.2017 | ||
IE | 08.02.2017 | ||
LU | 08.02.2017 | ||
MT | 08.02.2017 | ||
CH | 28.02.2017 | ||
FR | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2018/43] | AT | 14.09.2016 | |
BE | 14.09.2016 | ||
CZ | 14.09.2016 | ||
DK | 14.09.2016 | ||
EE | 14.09.2016 | ||
ES | 14.09.2016 | ||
FI | 14.09.2016 | ||
HR | 14.09.2016 | ||
IT | 14.09.2016 | ||
LT | 14.09.2016 | ||
LV | 14.09.2016 | ||
MC | 14.09.2016 | ||
NL | 14.09.2016 | ||
PL | 14.09.2016 | ||
RO | 14.09.2016 | ||
RS | 14.09.2016 | ||
SE | 14.09.2016 | ||
SI | 14.09.2016 | ||
SK | 14.09.2016 | ||
SM | 14.09.2016 | ||
BG | 14.12.2016 | ||
NO | 14.12.2016 | ||
GR | 15.12.2016 | ||
IS | 14.01.2017 | ||
PT | 16.01.2017 | ||
IE | 08.02.2017 | ||
LU | 08.02.2017 | ||
MT | 08.02.2017 | ||
CH | 28.02.2017 | ||
FR | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2018/13] | AT | 14.09.2016 | |
BE | 14.09.2016 | ||
CZ | 14.09.2016 | ||
DK | 14.09.2016 | ||
EE | 14.09.2016 | ||
ES | 14.09.2016 | ||
FI | 14.09.2016 | ||
HR | 14.09.2016 | ||
IT | 14.09.2016 | ||
LT | 14.09.2016 | ||
LV | 14.09.2016 | ||
MC | 14.09.2016 | ||
NL | 14.09.2016 | ||
PL | 14.09.2016 | ||
RO | 14.09.2016 | ||
RS | 14.09.2016 | ||
SE | 14.09.2016 | ||
SI | 14.09.2016 | ||
SK | 14.09.2016 | ||
SM | 14.09.2016 | ||
BG | 14.12.2016 | ||
NO | 14.12.2016 | ||
GR | 15.12.2016 | ||
IS | 14.01.2017 | ||
PT | 16.01.2017 | ||
IE | 08.02.2017 | ||
LU | 08.02.2017 | ||
CH | 28.02.2017 | ||
FR | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2018/07] | AT | 14.09.2016 | |
BE | 14.09.2016 | ||
CZ | 14.09.2016 | ||
DK | 14.09.2016 | ||
EE | 14.09.2016 | ||
ES | 14.09.2016 | ||
FI | 14.09.2016 | ||
HR | 14.09.2016 | ||
IT | 14.09.2016 | ||
LT | 14.09.2016 | ||
LV | 14.09.2016 | ||
MC | 14.09.2016 | ||
NL | 14.09.2016 | ||
PL | 14.09.2016 | ||
RO | 14.09.2016 | ||
RS | 14.09.2016 | ||
SE | 14.09.2016 | ||
SI | 14.09.2016 | ||
SK | 14.09.2016 | ||
SM | 14.09.2016 | ||
BG | 14.12.2016 | ||
NO | 14.12.2016 | ||
GR | 15.12.2016 | ||
IS | 14.01.2017 | ||
PT | 16.01.2017 | ||
LU | 08.02.2017 | ||
CH | 28.02.2017 | ||
FR | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2018/04] | AT | 14.09.2016 | |
BE | 14.09.2016 | ||
CZ | 14.09.2016 | ||
DK | 14.09.2016 | ||
EE | 14.09.2016 | ||
ES | 14.09.2016 | ||
FI | 14.09.2016 | ||
HR | 14.09.2016 | ||
IT | 14.09.2016 | ||
LT | 14.09.2016 | ||
LV | 14.09.2016 | ||
MC | 14.09.2016 | ||
NL | 14.09.2016 | ||
PL | 14.09.2016 | ||
RO | 14.09.2016 | ||
RS | 14.09.2016 | ||
SE | 14.09.2016 | ||
SI | 14.09.2016 | ||
SK | 14.09.2016 | ||
SM | 14.09.2016 | ||
BG | 14.12.2016 | ||
NO | 14.12.2016 | ||
GR | 15.12.2016 | ||
IS | 14.01.2017 | ||
PT | 16.01.2017 | ||
LU | 08.02.2017 | ||
CH | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2017/51] | AT | 14.09.2016 | |
BE | 14.09.2016 | ||
CZ | 14.09.2016 | ||
DK | 14.09.2016 | ||
EE | 14.09.2016 | ||
ES | 14.09.2016 | ||
FI | 14.09.2016 | ||
HR | 14.09.2016 | ||
IT | 14.09.2016 | ||
LT | 14.09.2016 | ||
LV | 14.09.2016 | ||
MC | 14.09.2016 | ||
NL | 14.09.2016 | ||
PL | 14.09.2016 | ||
RO | 14.09.2016 | ||
RS | 14.09.2016 | ||
SE | 14.09.2016 | ||
SI | 14.09.2016 | ||
SK | 14.09.2016 | ||
SM | 14.09.2016 | ||
BG | 14.12.2016 | ||
NO | 14.12.2016 | ||
GR | 15.12.2016 | ||
IS | 14.01.2017 | ||
PT | 16.01.2017 | ||
CH | 28.02.2017 | ||
LI | 28.02.2017 | ||
Former [2017/48] | AT | 14.09.2016 | |
BE | 14.09.2016 | ||
CZ | 14.09.2016 | ||
DK | 14.09.2016 | ||
EE | 14.09.2016 | ||
ES | 14.09.2016 | ||
FI | 14.09.2016 | ||
HR | 14.09.2016 | ||
IT | 14.09.2016 | ||
LT | 14.09.2016 | ||
LV | 14.09.2016 | ||
MC | 14.09.2016 | ||
NL | 14.09.2016 | ||
PL | 14.09.2016 | ||
RO | 14.09.2016 | ||
RS | 14.09.2016 | ||
SE | 14.09.2016 | ||
SK | 14.09.2016 | ||
SM | 14.09.2016 | ||
BG | 14.12.2016 | ||
NO | 14.12.2016 | ||
GR | 15.12.2016 | ||
IS | 14.01.2017 | ||
PT | 16.01.2017 | ||
Former [2017/34] | AT | 14.09.2016 | |
BE | 14.09.2016 | ||
CZ | 14.09.2016 | ||
DK | 14.09.2016 | ||
EE | 14.09.2016 | ||
ES | 14.09.2016 | ||
FI | 14.09.2016 | ||
HR | 14.09.2016 | ||
IT | 14.09.2016 | ||
LT | 14.09.2016 | ||
LV | 14.09.2016 | ||
NL | 14.09.2016 | ||
PL | 14.09.2016 | ||
RO | 14.09.2016 | ||
RS | 14.09.2016 | ||
SE | 14.09.2016 | ||
SK | 14.09.2016 | ||
SM | 14.09.2016 | ||
BG | 14.12.2016 | ||
NO | 14.12.2016 | ||
GR | 15.12.2016 | ||
IS | 14.01.2017 | ||
PT | 16.01.2017 | ||
Former [2017/32] | AT | 14.09.2016 | |
BE | 14.09.2016 | ||
CZ | 14.09.2016 | ||
EE | 14.09.2016 | ||
ES | 14.09.2016 | ||
FI | 14.09.2016 | ||
HR | 14.09.2016 | ||
IT | 14.09.2016 | ||
LT | 14.09.2016 | ||
LV | 14.09.2016 | ||
NL | 14.09.2016 | ||
PL | 14.09.2016 | ||
RO | 14.09.2016 | ||
RS | 14.09.2016 | ||
SE | 14.09.2016 | ||
SK | 14.09.2016 | ||
SM | 14.09.2016 | ||
BG | 14.12.2016 | ||
NO | 14.12.2016 | ||
GR | 15.12.2016 | ||
IS | 14.01.2017 | ||
PT | 16.01.2017 | ||
Former [2017/13] | FI | 14.09.2016 | |
HR | 14.09.2016 | ||
LT | 14.09.2016 | ||
LV | 14.09.2016 | ||
NL | 14.09.2016 | ||
RS | 14.09.2016 | ||
SE | 14.09.2016 | ||
NO | 14.12.2016 | ||
GR | 15.12.2016 | ||
Former [2017/11] | FI | 14.09.2016 | |
HR | 14.09.2016 | ||
LT | 14.09.2016 | ||
RS | 14.09.2016 | ||
SE | 14.09.2016 | ||
NO | 14.12.2016 | ||
GR | 15.12.2016 | ||
Former [2017/10] | FI | 14.09.2016 | |
HR | 14.09.2016 | ||
LT | 14.09.2016 | ||
RS | 14.09.2016 | ||
SE | 14.09.2016 | ||
NO | 14.12.2016 | ||
Former [2017/09] | FI | 14.09.2016 | |
LT | 14.09.2016 | ||
NO | 14.12.2016 | ||
Former [2017/07] | LT | 14.09.2016 | Documents cited: | Search | [A]EP0821833 (PHILIPS ELECTRONICS NV [NL]) [A] 1-4,6-14* figure -; claim - *; | [A]EP1098350 (MATSUSHITA ELECTRONICS CORP [JP]) [A] 1-4,6-14 * figure - * * paragraph [0001] - paragraph [0073] *; | [A]EP1081743 (MATSUSHITA ELECTRIC IND CO LTD [JP]) [A] 1-4,6-14 * figures 1,2 * * paragraph [0019] - paragraph [0046] *; | [A]US2009196034 (GHERARDINI STEPHEN DANIEL [US], et al) [A] 1-4,6-14 * figure - * * paragraph [0006] - paragraph [0045] *; | [A]US2009295268 (PENG CHANG-HUNG [TW]) [A] 1-4,6-14 * figure - * * paragraph [0007] - paragraph [0023] * | International search | [A]EP0480503 (PHILIPS NV [NL]); | [X]EP1081743 (MATSUSHITA ELECTRIC IND CO LTD [JP]); | [A]US2009295268 (PENG CHANG-HUNG [TW]) |