blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2766940

EP2766940 - CASE SYSTEM, BATTERY AND BATTERY RACK WITH IMPROVED STACKING [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  26.02.2021
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  20.03.2020
FormerGrant of patent is intended
Status updated on  15.12.2019
FormerExamination is in progress
Status updated on  24.03.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Zhejiang Narada Power Source Co. Ltd.
72, Jingguan Road
Lin'an Economic Development Zone
311305 Hangzhou, Zhejiang PRC / CN
[N/P]
Former [2020/31]For all designated states
Zhejiang Narada Power Source Co. Ltd.
72, Jingguan Road…Lin'an Economic Development Zone
311305 Hangzhou, Zhejiang PRC / CN
Former [2014/34]For all designated states
Zhejiang Narada Power Source Co. Ltd.
9/F Tower A
No. 50 Zijing Hua Road
Hangzhou
Provinz Zhejiang PRC / CN
Inventor(s)01 / CHEN, Jian
176 WenEr West road
Hangzhou Zhejiang / CN
02 / WANG, De Li
Building 1
Fengxing Disctrict
Yuhang Town
Zhejiang / CN
 [2014/34]
Representative(s)Troesch Scheidegger Werner AG
Schwäntenmos 14
8126 Zumikon / CH
[2014/34]
Application number, filing date11770736.411.10.2011
[2020/17]
WO2011EP67745
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2013053386
Date:18.04.2013
Language:EN
[2013/16]
Type: A1 Application with search report 
No.:EP2766940
Date:20.08.2014
Language:EN
The application published by WIPO in one of the EPO official languages on 18.04.2013 takes the place of the publication of the European patent application.
[2014/34]
Type: B1 Patent specification 
No.:EP2766940
Date:22.04.2020
Language:EN
[2020/17]
Search report(s)International search report - published on:EP18.04.2013
ClassificationIPC:H01M2/02, H01M2/10, H01M10/12, H01M10/16
[2014/34]
CPC:
H01M10/16 (EP,US); H01M10/12 (EP,US); H01M10/121 (US);
H01M50/209 (EP,US); H01M50/224 (EP,US); H01M50/26 (EP,US);
H01M50/271 (EP,US); H01M50/317 (US); Y02E60/10 (EP);
Y02P70/50 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2014/34]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:GEHÄUSESYSTEM, BATTERIE UND BATTERIEPACKUNG MIT VERBESSERTER STAPELUNG[2014/34]
English:CASE SYSTEM, BATTERY AND BATTERY RACK WITH IMPROVED STACKING[2014/34]
French:SYSTÈME DE BAC, ACCUMULATEUR ET BLOC D'ÉLÉMENTS À EMPILEMENT AMÉLIORÉ[2014/34]
Entry into regional phase28.03.2014National basic fee paid 
28.03.2014Designation fee(s) paid 
28.03.2014Examination fee paid 
Examination procedure28.03.2014Amendment by applicant (claims and/or description)
28.03.2014Examination requested  [2014/34]
28.03.2017Despatch of a communication from the examining division (Time limit: M04)
28.06.2017Reply to a communication from the examining division
25.05.2018Despatch of a communication from the examining division (Time limit: M04)
27.08.2018Reply to a communication from the examining division
16.12.2019Communication of intention to grant the patent
06.03.2020Fee for grant paid
06.03.2020Fee for publishing/printing paid
06.03.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  28.03.2017
Opposition(s)25.01.2021No opposition filed within time limit [2021/13]
Fees paidRenewal fee
28.03.2014Renewal fee patent year 03
12.08.2014Renewal fee patent year 04
06.10.2015Renewal fee patent year 05
04.08.2016Renewal fee patent year 06
22.08.2017Renewal fee patent year 07
15.08.2018Renewal fee patent year 08
27.08.2019Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU11.10.2011
AL22.04.2020
AT22.04.2020
CY22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
FI22.04.2020
HR22.04.2020
LT22.04.2020
LV22.04.2020
MC22.04.2020
MK22.04.2020
MT22.04.2020
NL22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SI22.04.2020
SK22.04.2020
SM22.04.2020
TR22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
IE11.10.2020
LU11.10.2020
BE31.10.2020
CH31.10.2020
FR31.10.2020
LI31.10.2020
[2022/32]
Former [2022/27]HU11.10.2011
AL22.04.2020
AT22.04.2020
CY22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
FI22.04.2020
HR22.04.2020
LT22.04.2020
LV22.04.2020
MC22.04.2020
MT22.04.2020
NL22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SI22.04.2020
SK22.04.2020
SM22.04.2020
TR22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
IE11.10.2020
LU11.10.2020
BE31.10.2020
CH31.10.2020
FR31.10.2020
LI31.10.2020
Former [2022/26]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
FI22.04.2020
HR22.04.2020
LT22.04.2020
LV22.04.2020
MC22.04.2020
NL22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SI22.04.2020
SK22.04.2020
SM22.04.2020
TR22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
IE11.10.2020
LU11.10.2020
BE31.10.2020
CH31.10.2020
FR31.10.2020
LI31.10.2020
Former [2021/46]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
FI22.04.2020
HR22.04.2020
LT22.04.2020
LV22.04.2020
MC22.04.2020
NL22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SI22.04.2020
SK22.04.2020
SM22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
IE11.10.2020
LU11.10.2020
BE31.10.2020
CH31.10.2020
FR31.10.2020
LI31.10.2020
Former [2021/37]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
FI22.04.2020
HR22.04.2020
LT22.04.2020
LV22.04.2020
MC22.04.2020
NL22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SI22.04.2020
SK22.04.2020
SM22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
LU11.10.2020
BE31.10.2020
CH31.10.2020
FR31.10.2020
LI31.10.2020
Former [2021/36]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
FI22.04.2020
HR22.04.2020
LT22.04.2020
LV22.04.2020
MC22.04.2020
NL22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SI22.04.2020
SK22.04.2020
SM22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
LU11.10.2020
BE31.10.2020
FR31.10.2020
Former [2021/35]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
FI22.04.2020
HR22.04.2020
LT22.04.2020
LV22.04.2020
MC22.04.2020
NL22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SI22.04.2020
SK22.04.2020
SM22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
LU11.10.2020
FR31.10.2020
Former [2021/31]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
FI22.04.2020
HR22.04.2020
LT22.04.2020
LV22.04.2020
MC22.04.2020
NL22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SI22.04.2020
SK22.04.2020
SM22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
LU11.10.2020
Former [2021/24]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
FI22.04.2020
HR22.04.2020
LT22.04.2020
LV22.04.2020
NL22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SI22.04.2020
SK22.04.2020
SM22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2021/10]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
FI22.04.2020
HR22.04.2020
LT22.04.2020
LV22.04.2020
NL22.04.2020
PL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SK22.04.2020
SM22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2021/09]AL22.04.2020
AT22.04.2020
CZ22.04.2020
DK22.04.2020
EE22.04.2020
FI22.04.2020
HR22.04.2020
LT22.04.2020
LV22.04.2020
NL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SM22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2021/08]AL22.04.2020
DK22.04.2020
FI22.04.2020
HR22.04.2020
LT22.04.2020
LV22.04.2020
NL22.04.2020
RO22.04.2020
RS22.04.2020
SE22.04.2020
SM22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2021/04]AL22.04.2020
FI22.04.2020
HR22.04.2020
LT22.04.2020
LV22.04.2020
NL22.04.2020
RS22.04.2020
SE22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2021/01]FI22.04.2020
HR22.04.2020
LT22.04.2020
LV22.04.2020
NL22.04.2020
RS22.04.2020
SE22.04.2020
BG22.07.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2020/51]FI22.04.2020
HR22.04.2020
LT22.04.2020
LV22.04.2020
NL22.04.2020
RS22.04.2020
SE22.04.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2020/50]FI22.04.2020
HR22.04.2020
LT22.04.2020
LV22.04.2020
NL22.04.2020
SE22.04.2020
NO22.07.2020
GR23.07.2020
IS22.08.2020
PT24.08.2020
Former [2020/48]FI22.04.2020
LT22.04.2020
NL22.04.2020
SE22.04.2020
NO22.07.2020
IS22.08.2020
PT24.08.2020
Former [2020/47]LT22.04.2020
NO22.07.2020
IS22.08.2020
Former [2020/46]IS22.08.2020
Cited inInternational search[XY]GB1367697  (FULMEN, et al) [X] 1,9,10 * page 1, line 50 - line 56; figures 1-5; claims 1-11 * [Y] 2;
 [A]US5695891  (MISRA SUDHAN S [US], et al) [A] 1-16 * figures 1,2; claim 1 *;
 [A]EP0854525  (GNB TECH INC [US]) [A] 1-16 * figures 1-5; claims 1-31 *;
 [A]US2002012835  (PETERSON STEVEN R [US]) [A] 1-16* figures 1-4; claims 1-9 *;
 [A]WO0245200  (DOUGLAS BATTERY MFG COMPANY [US]) [A] 1-16 * figures 1-7; claims 1-7 *;
 [Y]WO2011001581  (PANASONIC CORP [JP], et al) [Y] 2 * figure 1 *;
 US2012107674  [ ] (NISHINO HAJIME [JP], et al) [ ] * figure 1; claim 1 *
ExaminationUS4603093
 US5686202
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.