EP2566230 - MOBILE COMMUNICATION METHOD AND MOBILE STATION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.01.2019 Database last updated on 28.05.2024 | |
Former | The patent has been granted Status updated on 02.02.2018 | ||
Former | Grant of patent is intended Status updated on 05.11.2017 | ||
Former | Examination is in progress Status updated on 27.01.2017 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): IS | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states NTT DOCOMO, INC. 11-1, Nagatacho 2-chome Chiyoda-ku Tokyo 100-6150 / JP | [2018/10] |
Former [2013/10] | For all designated states NTT DOCOMO, INC. 11-1, Nagatacho 2-chome Chiyoda-ku Tokyo 100-6150 / JP | Inventor(s) | 01 /
IWAMURA, Mikio c/o Intellectual Property Department NTT DOCOMO INC. Sanno Park Tower 11-1 Nagatacho 2-chome, Chiyoda-ku Tokyo 100-6150 / JP | 02 /
UMESH, Anil c/o Intellectual Property Department NTT DOCOMO INC. Sanno Park Tower 11-1 Nagatacho 2-chome, Chiyoda-ku Tokyo 100-6150 / JP | [2013/10] | Representative(s) | Hoffmann Eitle Patent- und Rechtsanwälte PartmbB Arabellastraße 30 81925 München / DE | [2018/10] |
Former [2013/10] | HOFFMANN EITLE Patent- und Rechtsanwälte Arabellastrasse 4 81925 München / DE | Application number, filing date | 11775104.0 | 28.04.2011 | [2018/10] | WO2011JP60361 | Priority number, date | JP20100106003 | 30.04.2010 Original published format: JP 2010106003 | [2013/10] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011136323 | Date: | 03.11.2011 | Language: | JA | [2011/44] | Type: | A1 Application with search report | No.: | EP2566230 | Date: | 06.03.2013 | Language: | EN | [2013/10] | Type: | B1 Patent specification | No.: | EP2566230 | Date: | 07.03.2018 | Language: | EN | [2018/10] | Search report(s) | International search report - published on: | JP | 03.11.2011 | (Supplementary) European search report - dispatched on: | EP | 10.02.2015 | Classification | IPC: | H04W24/10, H04W36/14, H04W72/04 | [2013/10] | CPC: |
H04W24/10 (EP,KR,US);
H04W36/06 (KR);
H04W36/0083 (EP,US);
H04L5/001 (EP,US);
H04L5/0057 (EP,US);
H04L5/0096 (KR);
H04W36/0058 (EP,US);
H04W36/0094 (EP,KR,US);
H04W76/36 (KR);
H04L12/5602 (EP,US);
H04L47/10 (US);
H04L47/15 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/10] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | MOBILES KOMMUNIKATIONSVERFAHREN UND MOBILSTATION | [2013/10] | English: | MOBILE COMMUNICATION METHOD AND MOBILE STATION | [2013/10] | French: | PROCÉDÉ DE COMMUNICATION MOBILE ET STATION MOBILE | [2013/10] | Entry into regional phase | 15.11.2012 | Translation filed | 15.11.2012 | National basic fee paid | 15.11.2012 | Search fee paid | 15.11.2012 | Designation fee(s) paid | 15.11.2012 | Examination fee paid | Examination procedure | 15.11.2012 | Examination requested [2013/10] | 17.08.2015 | Amendment by applicant (claims and/or description) | 27.01.2017 | Despatch of a communication from the examining division (Time limit: M04) | 27.04.2017 | Reply to a communication from the examining division | 06.11.2017 | Communication of intention to grant the patent | 23.01.2018 | Fee for grant paid | 23.01.2018 | Fee for publishing/printing paid | 23.01.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 27.01.2017 | Opposition(s) | 10.12.2018 | No opposition filed within time limit [2019/07] | Fees paid | Renewal fee | 15.04.2013 | Renewal fee patent year 03 | 25.03.2014 | Renewal fee patent year 04 | 27.04.2015 | Renewal fee patent year 05 | 17.03.2016 | Renewal fee patent year 06 | 20.04.2017 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.04.2011 | AL | 07.03.2018 | AT | 07.03.2018 | CY | 07.03.2018 | CZ | 07.03.2018 | DK | 07.03.2018 | EE | 07.03.2018 | ES | 07.03.2018 | FI | 07.03.2018 | HR | 07.03.2018 | IT | 07.03.2018 | LT | 07.03.2018 | LV | 07.03.2018 | MC | 07.03.2018 | MK | 07.03.2018 | NL | 07.03.2018 | PL | 07.03.2018 | RO | 07.03.2018 | RS | 07.03.2018 | SI | 07.03.2018 | SK | 07.03.2018 | SM | 07.03.2018 | TR | 07.03.2018 | IE | 28.04.2018 | LU | 28.04.2018 | MT | 28.04.2018 | BE | 30.04.2018 | FR | 07.05.2018 | BG | 07.06.2018 | NO | 07.06.2018 | GR | 08.06.2018 | IS | 07.07.2018 | PT | 09.07.2018 | [2020/33] |
Former [2020/31] | HU | 28.04.2011 | |
AL | 07.03.2018 | ||
AT | 07.03.2018 | ||
CY | 07.03.2018 | ||
CZ | 07.03.2018 | ||
DK | 07.03.2018 | ||
EE | 07.03.2018 | ||
ES | 07.03.2018 | ||
FI | 07.03.2018 | ||
HR | 07.03.2018 | ||
IT | 07.03.2018 | ||
LT | 07.03.2018 | ||
LV | 07.03.2018 | ||
MC | 07.03.2018 | ||
MK | 07.03.2018 | ||
NL | 07.03.2018 | ||
PL | 07.03.2018 | ||
RO | 07.03.2018 | ||
RS | 07.03.2018 | ||
SI | 07.03.2018 | ||
SK | 07.03.2018 | ||
SM | 07.03.2018 | ||
TR | 07.03.2018 | ||
IE | 28.04.2018 | ||
LU | 28.04.2018 | ||
MT | 28.04.2018 | ||
BE | 30.04.2018 | ||
FR | 07.05.2018 | ||
BG | 07.06.2018 | ||
NO | 07.06.2018 | ||
GR | 08.06.2018 | ||
PT | 09.07.2018 | ||
Former [2020/28] | HU | 28.04.2011 | |
AL | 07.03.2018 | ||
AT | 07.03.2018 | ||
CY | 07.03.2018 | ||
CZ | 07.03.2018 | ||
DK | 07.03.2018 | ||
EE | 07.03.2018 | ||
ES | 07.03.2018 | ||
FI | 07.03.2018 | ||
HR | 07.03.2018 | ||
IT | 07.03.2018 | ||
LT | 07.03.2018 | ||
LV | 07.03.2018 | ||
MC | 07.03.2018 | ||
NL | 07.03.2018 | ||
PL | 07.03.2018 | ||
RO | 07.03.2018 | ||
RS | 07.03.2018 | ||
SI | 07.03.2018 | ||
SK | 07.03.2018 | ||
SM | 07.03.2018 | ||
TR | 07.03.2018 | ||
IE | 28.04.2018 | ||
LU | 28.04.2018 | ||
MT | 28.04.2018 | ||
BE | 30.04.2018 | ||
FR | 07.05.2018 | ||
BG | 07.06.2018 | ||
NO | 07.06.2018 | ||
GR | 08.06.2018 | ||
PT | 09.07.2018 | ||
Former [2020/16] | AL | 07.03.2018 | |
AT | 07.03.2018 | ||
CY | 07.03.2018 | ||
CZ | 07.03.2018 | ||
DK | 07.03.2018 | ||
EE | 07.03.2018 | ||
ES | 07.03.2018 | ||
FI | 07.03.2018 | ||
HR | 07.03.2018 | ||
IT | 07.03.2018 | ||
LT | 07.03.2018 | ||
LV | 07.03.2018 | ||
MC | 07.03.2018 | ||
NL | 07.03.2018 | ||
PL | 07.03.2018 | ||
RO | 07.03.2018 | ||
RS | 07.03.2018 | ||
SI | 07.03.2018 | ||
SK | 07.03.2018 | ||
SM | 07.03.2018 | ||
TR | 07.03.2018 | ||
IE | 28.04.2018 | ||
LU | 28.04.2018 | ||
MT | 28.04.2018 | ||
BE | 30.04.2018 | ||
FR | 07.05.2018 | ||
BG | 07.06.2018 | ||
NO | 07.06.2018 | ||
GR | 08.06.2018 | ||
PT | 09.07.2018 | ||
Former [2020/08] | AL | 07.03.2018 | |
AT | 07.03.2018 | ||
CY | 07.03.2018 | ||
CZ | 07.03.2018 | ||
DK | 07.03.2018 | ||
EE | 07.03.2018 | ||
ES | 07.03.2018 | ||
FI | 07.03.2018 | ||
HR | 07.03.2018 | ||
IT | 07.03.2018 | ||
LT | 07.03.2018 | ||
LV | 07.03.2018 | ||
MC | 07.03.2018 | ||
NL | 07.03.2018 | ||
PL | 07.03.2018 | ||
RO | 07.03.2018 | ||
RS | 07.03.2018 | ||
SI | 07.03.2018 | ||
SK | 07.03.2018 | ||
SM | 07.03.2018 | ||
IE | 28.04.2018 | ||
LU | 28.04.2018 | ||
MT | 28.04.2018 | ||
BE | 30.04.2018 | ||
FR | 07.05.2018 | ||
BG | 07.06.2018 | ||
NO | 07.06.2018 | ||
GR | 08.06.2018 | ||
PT | 09.07.2018 | ||
Former [2019/23] | AL | 07.03.2018 | |
AT | 07.03.2018 | ||
CY | 07.03.2018 | ||
CZ | 07.03.2018 | ||
DK | 07.03.2018 | ||
EE | 07.03.2018 | ||
ES | 07.03.2018 | ||
FI | 07.03.2018 | ||
HR | 07.03.2018 | ||
IT | 07.03.2018 | ||
LT | 07.03.2018 | ||
LV | 07.03.2018 | ||
MC | 07.03.2018 | ||
NL | 07.03.2018 | ||
PL | 07.03.2018 | ||
RO | 07.03.2018 | ||
RS | 07.03.2018 | ||
SI | 07.03.2018 | ||
SK | 07.03.2018 | ||
SM | 07.03.2018 | ||
IE | 28.04.2018 | ||
LU | 28.04.2018 | ||
BE | 30.04.2018 | ||
FR | 07.05.2018 | ||
BG | 07.06.2018 | ||
NO | 07.06.2018 | ||
GR | 08.06.2018 | ||
PT | 09.07.2018 | ||
Former [2019/19] | AL | 07.03.2018 | |
AT | 07.03.2018 | ||
CY | 07.03.2018 | ||
CZ | 07.03.2018 | ||
DK | 07.03.2018 | ||
EE | 07.03.2018 | ||
ES | 07.03.2018 | ||
FI | 07.03.2018 | ||
HR | 07.03.2018 | ||
IT | 07.03.2018 | ||
LT | 07.03.2018 | ||
LV | 07.03.2018 | ||
MC | 07.03.2018 | ||
NL | 07.03.2018 | ||
PL | 07.03.2018 | ||
RO | 07.03.2018 | ||
RS | 07.03.2018 | ||
SI | 07.03.2018 | ||
SK | 07.03.2018 | ||
SM | 07.03.2018 | ||
IE | 28.04.2018 | ||
LU | 28.04.2018 | ||
BE | 30.04.2018 | ||
BG | 07.06.2018 | ||
NO | 07.06.2018 | ||
GR | 08.06.2018 | ||
PT | 09.07.2018 | ||
Former [2019/12] | AL | 07.03.2018 | |
AT | 07.03.2018 | ||
CY | 07.03.2018 | ||
CZ | 07.03.2018 | ||
DK | 07.03.2018 | ||
EE | 07.03.2018 | ||
ES | 07.03.2018 | ||
FI | 07.03.2018 | ||
HR | 07.03.2018 | ||
IT | 07.03.2018 | ||
LT | 07.03.2018 | ||
LV | 07.03.2018 | ||
MC | 07.03.2018 | ||
NL | 07.03.2018 | ||
PL | 07.03.2018 | ||
RO | 07.03.2018 | ||
RS | 07.03.2018 | ||
SI | 07.03.2018 | ||
SK | 07.03.2018 | ||
SM | 07.03.2018 | ||
LU | 28.04.2018 | ||
BE | 30.04.2018 | ||
BG | 07.06.2018 | ||
NO | 07.06.2018 | ||
GR | 08.06.2018 | ||
PT | 09.07.2018 | ||
Former [2019/08] | AL | 07.03.2018 | |
AT | 07.03.2018 | ||
CY | 07.03.2018 | ||
CZ | 07.03.2018 | ||
DK | 07.03.2018 | ||
EE | 07.03.2018 | ||
ES | 07.03.2018 | ||
FI | 07.03.2018 | ||
HR | 07.03.2018 | ||
IT | 07.03.2018 | ||
LT | 07.03.2018 | ||
LV | 07.03.2018 | ||
MC | 07.03.2018 | ||
NL | 07.03.2018 | ||
PL | 07.03.2018 | ||
RO | 07.03.2018 | ||
RS | 07.03.2018 | ||
SK | 07.03.2018 | ||
SM | 07.03.2018 | ||
LU | 28.04.2018 | ||
BG | 07.06.2018 | ||
NO | 07.06.2018 | ||
GR | 08.06.2018 | ||
PT | 09.07.2018 | ||
Former [2019/06] | AL | 07.03.2018 | |
AT | 07.03.2018 | ||
CY | 07.03.2018 | ||
CZ | 07.03.2018 | ||
EE | 07.03.2018 | ||
ES | 07.03.2018 | ||
FI | 07.03.2018 | ||
HR | 07.03.2018 | ||
IT | 07.03.2018 | ||
LT | 07.03.2018 | ||
LV | 07.03.2018 | ||
MC | 07.03.2018 | ||
NL | 07.03.2018 | ||
PL | 07.03.2018 | ||
RO | 07.03.2018 | ||
RS | 07.03.2018 | ||
SK | 07.03.2018 | ||
SM | 07.03.2018 | ||
BG | 07.06.2018 | ||
NO | 07.06.2018 | ||
GR | 08.06.2018 | ||
PT | 09.07.2018 | ||
Former [2019/03] | AL | 07.03.2018 | |
AT | 07.03.2018 | ||
CY | 07.03.2018 | ||
CZ | 07.03.2018 | ||
EE | 07.03.2018 | ||
ES | 07.03.2018 | ||
FI | 07.03.2018 | ||
HR | 07.03.2018 | ||
IT | 07.03.2018 | ||
LT | 07.03.2018 | ||
LV | 07.03.2018 | ||
NL | 07.03.2018 | ||
PL | 07.03.2018 | ||
RO | 07.03.2018 | ||
RS | 07.03.2018 | ||
SK | 07.03.2018 | ||
SM | 07.03.2018 | ||
BG | 07.06.2018 | ||
NO | 07.06.2018 | ||
GR | 08.06.2018 | ||
PT | 09.07.2018 | ||
Former [2018/52] | AL | 07.03.2018 | |
AT | 07.03.2018 | ||
CY | 07.03.2018 | ||
CZ | 07.03.2018 | ||
EE | 07.03.2018 | ||
ES | 07.03.2018 | ||
FI | 07.03.2018 | ||
HR | 07.03.2018 | ||
IT | 07.03.2018 | ||
LT | 07.03.2018 | ||
LV | 07.03.2018 | ||
NL | 07.03.2018 | ||
PL | 07.03.2018 | ||
RO | 07.03.2018 | ||
RS | 07.03.2018 | ||
SK | 07.03.2018 | ||
SM | 07.03.2018 | ||
BG | 07.06.2018 | ||
NO | 07.06.2018 | ||
GR | 08.06.2018 | ||
Former [2018/50] | AL | 07.03.2018 | |
AT | 07.03.2018 | ||
CY | 07.03.2018 | ||
CZ | 07.03.2018 | ||
EE | 07.03.2018 | ||
ES | 07.03.2018 | ||
FI | 07.03.2018 | ||
HR | 07.03.2018 | ||
IT | 07.03.2018 | ||
LT | 07.03.2018 | ||
LV | 07.03.2018 | ||
NL | 07.03.2018 | ||
PL | 07.03.2018 | ||
RO | 07.03.2018 | ||
RS | 07.03.2018 | ||
SK | 07.03.2018 | ||
BG | 07.06.2018 | ||
NO | 07.06.2018 | ||
GR | 08.06.2018 | ||
Former [2018/47] | AL | 07.03.2018 | |
CY | 07.03.2018 | ||
ES | 07.03.2018 | ||
FI | 07.03.2018 | ||
HR | 07.03.2018 | ||
IT | 07.03.2018 | ||
LT | 07.03.2018 | ||
LV | 07.03.2018 | ||
NL | 07.03.2018 | ||
RS | 07.03.2018 | ||
BG | 07.06.2018 | ||
NO | 07.06.2018 | ||
GR | 08.06.2018 | ||
Former [2018/46] | AL | 07.03.2018 | |
CY | 07.03.2018 | ||
ES | 07.03.2018 | ||
FI | 07.03.2018 | ||
HR | 07.03.2018 | ||
LT | 07.03.2018 | ||
LV | 07.03.2018 | ||
NL | 07.03.2018 | ||
RS | 07.03.2018 | ||
BG | 07.06.2018 | ||
NO | 07.06.2018 | ||
GR | 08.06.2018 | ||
Former [2018/45] | CY | 07.03.2018 | |
ES | 07.03.2018 | ||
FI | 07.03.2018 | ||
HR | 07.03.2018 | ||
LT | 07.03.2018 | ||
LV | 07.03.2018 | ||
NL | 07.03.2018 | ||
RS | 07.03.2018 | ||
BG | 07.06.2018 | ||
NO | 07.06.2018 | ||
GR | 08.06.2018 | ||
Former [2018/40] | CY | 07.03.2018 | |
ES | 07.03.2018 | ||
FI | 07.03.2018 | ||
HR | 07.03.2018 | ||
LT | 07.03.2018 | ||
LV | 07.03.2018 | ||
RS | 07.03.2018 | ||
BG | 07.06.2018 | ||
NO | 07.06.2018 | ||
GR | 08.06.2018 | ||
Former [2018/39] | CY | 07.03.2018 | |
ES | 07.03.2018 | ||
FI | 07.03.2018 | ||
HR | 07.03.2018 | ||
LT | 07.03.2018 | ||
LV | 07.03.2018 | ||
RS | 07.03.2018 | ||
NO | 07.06.2018 | ||
GR | 08.06.2018 | ||
Former [2018/37] | CY | 07.03.2018 | |
ES | 07.03.2018 | ||
FI | 07.03.2018 | ||
HR | 07.03.2018 | ||
LT | 07.03.2018 | ||
NO | 07.06.2018 | ||
GR | 08.06.2018 | ||
Former [2018/36] | CY | 07.03.2018 | |
ES | 07.03.2018 | ||
FI | 07.03.2018 | ||
HR | 07.03.2018 | ||
LT | 07.03.2018 | ||
NO | 07.06.2018 | ||
Former [2018/35] | CY | 07.03.2018 | |
FI | 07.03.2018 | ||
HR | 07.03.2018 | ||
LT | 07.03.2018 | ||
NO | 07.06.2018 | Documents cited: | Search | [A] - ERICSSON ET AL, "Event handling at PCC change", 3GPP DRAFT; R2-101996 EVENT HANDLING AT PCC CHANGE, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20100406), vol. RAN WG2, no. Beijing, china; 20100412, XP050422525 [A] 1,2 * the whole document * | [A] - NOKIA CORPORATION ET AL, "Measurement Events in Carrier Aggregation", 3GPP DRAFT; R2-102098 MEASUREMENTS IN CARRIER AGGREGATION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20100406), vol. RAN WG2, no. Beijing, china; 20100412, XP050422561 [A] 1,2 * the whole document * | [A] - NTT DOCOMO ET AL, "Measurement handling at inter-frequency handover", 3GPP DRAFT; R2-085558 MEASUREMENTS AT HANDOVER, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20080923), no. Prague, Czech Republic; 20080923, XP050320369 [A] 1,2 * section 2.1, proposal 3 * | [T] - NTT DOCOMO ET AL, "MeasId swapping at inter-frequency mobility", 3GPP DRAFT; R2-103065 MEASID SWAPPING, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20100504), vol. RAN WG2, no. Montreal, Canada; 20100510, XP050423234 [T] 1,2 * the whole document * | International search | [Y] - MEDIATEK INC., "Measurement Events Generalization for Carrier Aggregation", 3GPP TSG-RAN WG2 #69 R2-101146, (20100222), XP050421759 | [Y] - NTT DOCOMO, INC., "Measurement handling at inter-frequency handover", 3GPP TSG RAN WG2 #63BIS TDOC-R2-085558, (20080929), XP050320369 |