blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2564486

EP2564486 - SYSTEMS AND METHODS FOR AUTOMATIC CONNECTION AND CHARGING OF AN ELECTRIC VEHICLE AT A CHARGING STATION [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  23.07.2021
Database last updated on 14.06.2024
FormerThe patent has been granted
Status updated on  14.08.2020
FormerGrant of patent is intended
Status updated on  08.04.2020
FormerExamination is in progress
Status updated on  10.11.2017
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024 [2024/29]
Applicant(s)For all designated states
Proterra Inc.
1815 Rollins Road
Burlingame, CA 94010 / US
[2020/38]
Former [2013/10]For all designated states
Proterra Inc.
16360 Table Mountain Parkway
Golden, CO 80403 / US
Inventor(s)01 / SARKAR, Reuben
1700 Bassett St. Apt 1414
Denver, CO 80202 / US
02 / FINNERN, Michael, Alan
28639 Douglas Park Road
Evergreen, CO 80439 / US
03 / WALKER, Michael
13795 Spruce Way
Thornton, CO 80602 / US
 [2013/10]
Representative(s)D Young & Co LLP
3 Noble Street
London EC2V 7BQ / GB
[N/P]
Former [2020/38]D Young & Co LLP
120 Holborn
London EC1N 2DY / GB
Former [2013/10]Harris, Ian Richard
D Young & Co LLP
120 Holborn
London EC1N 2DY / GB
Application number, filing date11777906.626.04.2011
[2020/38]
WO2011US33915
Priority number, dateUS20100328152P26.04.2010         Original published format: US 328152 P
[2013/10]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report
No.:WO2011139680
Date:10.11.2011
Language:EN
[2011/45]
Type: A2 Application without search report 
No.:EP2564486
Date:06.03.2013
Language:EN
The application published by WIPO in one of the EPO official languages on 10.11.2011 takes the place of the publication of the European patent application.
[2013/10]
Type: B1 Patent specification 
No.:EP2564486
Date:16.09.2020
Language:EN
[2020/38]
Search report(s)International search report - published on:KR23.02.2012
(Supplementary) European search report - dispatched on:EP15.09.2016
ClassificationIPC:B60L53/14, B60L53/35, B60L53/30, B60L53/65, B60L58/40, B60L15/20, B60L5/00, B60L5/36, B60L5/42, B60L15/10, B60L53/10, B60L53/51, B60L53/52, B60L53/55, B60L58/12, B60L3/04, B60L53/54, B60L53/53, B60L53/36
[2020/18]
CPC:
B60L3/0046 (EP,US); B60L15/10 (EP,US); B60L15/2009 (EP,US);
B60L3/0038 (EP,US); B60L3/0076 (EP,US); B60L3/04 (EP,US);
B60L3/12 (EP,US); B60L5/005 (EP,US); B60L5/36 (EP,US);
B60L5/42 (EP,US); B60L50/40 (EP,US); B60L50/66 (EP,US);
B60L53/11 (EP,US); B60L53/14 (EP,US); B60L53/305 (EP,US);
B60L53/32 (EP,US); B60L53/35 (EP,US); B60L53/36 (EP,US);
B60L53/51 (EP,US); B60L53/52 (EP,US); B60L53/53 (EP,US);
B60L53/54 (EP,US); B60L53/55 (EP,US); B60L53/65 (EP,US);
B60L58/12 (EP,US); B60L58/40 (EP,US); B60L7/18 (EP,US);
H02J7/0013 (EP,US); H02J7/00309 (EP,US); H02J7/0045 (EP,US);
H02J7/0048 (EP,US); H02J7/02 (EP,US); B60L2200/18 (EP,US);
B60L2200/30 (EP,US); B60L2240/12 (EP,US); B60L2240/36 (EP,US);
B60L2240/421 (EP,US); B60L2240/545 (EP,US); B60L2240/549 (EP,US);
B60L2240/62 (EP,US); B60L2240/72 (EP,US); B60L2240/80 (EP,US);
B60L2250/10 (EP,US); B60L2250/16 (EP,US); B60L53/16 (EP,US);
H02J2310/48 (EP,US); Y02T10/64 (EP,US); Y02T10/70 (EP,US);
Y02T10/7072 (EP,US); Y02T10/72 (EP,US); Y02T90/12 (EP,US);
Y02T90/14 (EP,US); Y02T90/16 (US); Y02T90/167 (EP,US);
Y02T90/40 (US); Y04S30/14 (EP,US) (-)
Former IPC [2016/42]H02J7/00, B60L11/18, B60W10/24, B60L5/00, B60L5/36, B60L5/42, B60L15/10, B60L3/00, B60L3/04, B60L3/12, B60L7/18, B60L11/00, B60L15/20, H02J7/02
Former IPC [2013/10]H02J7/00, B60L11/18, B60W10/24
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2013/10]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:SYSTEME UND VERFAHREN ZUR AUTOMATISCHEN VERBINDUNG UND LADUNG EINES ELEKTROFAHRZEUGS AN EINER LADESTATION[2013/10]
English:SYSTEMS AND METHODS FOR AUTOMATIC CONNECTION AND CHARGING OF AN ELECTRIC VEHICLE AT A CHARGING STATION[2013/10]
French:SYSTÈMES ET PROCÉDÉS POUR LA CONNEXION ET LA RECHARGE AUTOMATIQUES D'UN VÉHICULE ÉLECTRIQUE À UNE STATION DE RECHARGE[2013/10]
Entry into regional phase05.11.2012National basic fee paid 
05.11.2012Search fee paid 
05.11.2012Designation fee(s) paid 
05.11.2012Examination fee paid 
Examination procedure05.11.2012Examination requested  [2013/10]
05.04.2017Amendment by applicant (claims and/or description)
10.11.2017Despatch of a communication from the examining division (Time limit: M04)
09.03.2018Reply to a communication from the examining division
12.06.2018Despatch of a communication from the examining division (Time limit: M02)
16.08.2018Reply to a communication from the examining division
14.05.2019Despatch of a communication from the examining division (Time limit: M02)
17.07.2019Reply to a communication from the examining division
09.04.2020Communication of intention to grant the patent
06.08.2020Fee for grant paid
06.08.2020Fee for publishing/printing paid
06.08.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  10.11.2017
Opposition(s)17.06.2021No opposition filed within time limit [2021/34]
Fees paidRenewal fee
29.04.2013Renewal fee patent year 03
25.03.2014Renewal fee patent year 04
10.04.2015Renewal fee patent year 05
11.04.2016Renewal fee patent year 06
10.04.2017Renewal fee patent year 07
11.04.2018Renewal fee patent year 08
15.04.2019Renewal fee patent year 09
31.03.2020Renewal fee patent year 10
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU26.04.2011
AL16.09.2020
AT16.09.2020
CY16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
MK16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
TR16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
IE26.04.2021
LU26.04.2021
BE30.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
[2024/29]
Former [2024/22]HU26.04.2011
AL16.09.2020
AT16.09.2020
CY16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
MK16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
IE26.04.2021
LU26.04.2021
BE30.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
Former [2023/27]HU26.04.2011
AL16.09.2020
AT16.09.2020
CY16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
IE26.04.2021
LU26.04.2021
BE30.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
Former [2023/24]AL16.09.2020
AT16.09.2020
CY16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
IE26.04.2021
LU26.04.2021
BE30.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
Former [2022/34]AL16.09.2020
AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
IE26.04.2021
LU26.04.2021
BE30.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
Former [2022/23]AL16.09.2020
AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
IE26.04.2021
LU26.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
Former [2022/21]AL16.09.2020
AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
PT18.01.2021
IE26.04.2021
LU26.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
Former [2022/10]AL16.09.2020
AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
PT18.01.2021
LU26.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
Former [2022/09]AL16.09.2020
AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
LU26.04.2021
FR30.04.2021
Former [2022/04]AL16.09.2020
AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
LU26.04.2021
Former [2021/50]AL16.09.2020
AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/48]AL16.09.2020
AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
IT16.09.2020
LT16.09.2020
LV16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/37]AL16.09.2020
AT16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/36]AL16.09.2020
AT16.09.2020
CZ16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/28]AL16.09.2020
AT16.09.2020
CZ16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SK16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/25]AL16.09.2020
AT16.09.2020
CZ16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
NL16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/24]AT16.09.2020
CZ16.09.2020
EE16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
NL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
PT18.01.2021
Former [2021/23]CZ16.09.2020
EE16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
NL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
PT18.01.2021
Former [2021/22]CZ16.09.2020
EE16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
NL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
PT18.01.2021
Former [2021/21]FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
NL16.09.2020
RS16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
PT18.01.2021
Former [2021/20]FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
NL16.09.2020
RS16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
Former [2021/18]FI16.09.2020
HR16.09.2020
LV16.09.2020
NL16.09.2020
RS16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
Former [2021/10]FI16.09.2020
HR16.09.2020
LV16.09.2020
RS16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
Former [2021/09]FI16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
Former [2021/08]FI16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
Former [2021/07]FI16.09.2020
NO16.12.2020
Documents cited:Search[Y]US3986095  (NAKAI SABURO, et al) [Y] 1 * claim 1 *;
 [Y]DE4014696  (BOSCH GMBH ROBERT [DE]) [Y] 1 * column 3; figure 3 *;
 [Y]US5461298  (LARA JESUS D [US], et al) [Y] 4,8,13 * columns 6,9; figures 2,6a,6b; claim 1 * * column 8 *;
 [Y]US5659240  (KING ROBERT DEAN [US]) [Y] 4 * columns 6-7 *;
 [Y]US6194854  (UCHIBORI KENJI [JP], et al) [Y] 1-15 * columns 4,8-10; figures 10,16-20 *;
 [Y]EP1205340  (MOULD ADRIAN ROBERT [GB]) [Y] 1 * claims 1,2,8,9 *;
 [Y]DE69711963T  (SUMITOMO WIRING SYSTEMS [JP]) [Y] 1-15 * claims 1,14 *;
 [A]JP2007074800  (TSUBAKIMOTO CHAIN CO) [A] 1-15 * the whole document *;
 [Y]US2007126395  (SUCHAR MICHAEL J [US]) [Y] 1* paragraph [0019] - paragraph [0021]; claim 5 *;
 [Y]US2009040068  (OYOBE HICHIROSAI [JP], et al) [Y] 1-15 * paragraphs [0118] , [0119]; figures 8,9-12; claims 1-11 *;
 [Y]DE202009000259U  (STOPP ANDREAS [DE]) [Y] 5,9,10,14 * paragraph [0062]; figures 1-5; claim 1 *;
 [Y]US2010039067  (HILL DALE [US], et al) [Y] 1-15 * paragraphs [0034] , [0043]; figures 2,6a-7b *;
 [Y]WO2010026622  (MITSUBISHI HEAVY IND LTD [JP], et al) [Y] 1 * claim 1 *
International search[Y]US5461298  (LARA JESUS D [US], et al);
 [A]US5821731  (KUKI HEIJI [JP], et al);
 [A]US5847537  (PARMLEY SR DANIEL W [US]);
 [X]US6157162  (HAYASHI KIYOTAKA [JP], et al);
 [Y]US2010039067  (HILL DALE [US], et al)
ExaminationEP1997668
 CN101531141
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.