EP2633590 - APPLICATOR RAM HAVING A RAM ADAPTOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.07.2015 Database last updated on 14.06.2024 | Most recent event Tooltip | 12.10.2018 | Lapse of the patent in a contracting state New state(s): AL | published on 14.11.2018 [2018/46] | Applicant(s) | For all designated states Tyco Electronics Corporation 1050 Westlakes Drive Berwyn, PA 19312 / US | [2013/36] | Inventor(s) | 01 /
WEAVER, Brian, Keith 117 North Fairville Avenue Harrisburg, PA 17112 / US | 02 /
STAKEM, Kerry, Joseph 264 Carlson Road Hummelstown, PA 17036 / US | [2013/36] | Representative(s) | Johnstone, Douglas Ian, et al Baron Warren Redfern 1000 Great West Road Brentford TW8 9DW / GB | [N/P] |
Former [2013/36] | Johnstone, Douglas Ian, et al Baron Warren Redfern Cambridge House 100 Cambridge Grove Hammersmith London W6 0LE / GB | Application number, filing date | 11782259.3 | 17.10.2011 | WO2011US01764 | Priority number, date | US20100912525 | 26.10.2010 Original published format: US 912525 | [2013/36] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2012057818 | Date: | 03.05.2012 | Language: | EN | [2012/18] | Type: | A1 Application with search report | No.: | EP2633590 | Date: | 04.09.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 03.05.2012 takes the place of the publication of the European patent application. | [2013/36] | Type: | B1 Patent specification | No.: | EP2633590 | Date: | 03.09.2014 | Language: | EN | [2014/36] | Search report(s) | International search report - published on: | EP | 03.05.2012 | Classification | IPC: | H01R43/048 | [2013/36] | CPC: |
H01R43/0488 (EP,US);
Y10T29/49185 (EP,US);
Y10T29/53235 (EP,US);
Y10T29/5327 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/36] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | APPLIKATORKOLBEN MIT KOLBENADAPTER | [2013/36] | English: | APPLICATOR RAM HAVING A RAM ADAPTOR | [2013/36] | French: | VÉRIN APPLICATEUR COMPORTANT UN ADAPTATEUR DE VÉRIN | [2013/36] | Entry into regional phase | 20.03.2013 | National basic fee paid | 20.03.2013 | Designation fee(s) paid | 20.03.2013 | Examination fee paid | Examination procedure | 20.03.2013 | Examination requested [2013/36] | 11.12.2013 | Amendment by applicant (claims and/or description) | 19.03.2014 | Communication of intention to grant the patent | 21.07.2014 | Fee for grant paid | 21.07.2014 | Fee for publishing/printing paid | 21.07.2014 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 19.03.2014 | Opposition(s) | 04.06.2015 | No opposition filed within time limit [2015/33] | Fees paid | Renewal fee | 28.10.2013 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.10.2011 | AL | 03.09.2014 | AT | 03.09.2014 | BE | 03.09.2014 | BG | 03.09.2014 | CY | 03.09.2014 | CZ | 03.09.2014 | DK | 03.09.2014 | EE | 03.09.2014 | ES | 03.09.2014 | FI | 03.09.2014 | HR | 03.09.2014 | LT | 03.09.2014 | LV | 03.09.2014 | MC | 03.09.2014 | MK | 03.09.2014 | MT | 03.09.2014 | NL | 03.09.2014 | PL | 03.09.2014 | RO | 03.09.2014 | RS | 03.09.2014 | SE | 03.09.2014 | SI | 03.09.2014 | SK | 03.09.2014 | SM | 03.09.2014 | TR | 03.09.2014 | IE | 17.10.2014 | LU | 17.10.2014 | CH | 31.10.2014 | LI | 31.10.2014 | FR | 03.11.2014 | NO | 03.12.2014 | GR | 04.12.2014 | IS | 03.01.2015 | PT | 05.01.2015 | [2018/46] |
Former [2018/31] | HU | 17.10.2011 | |
AT | 03.09.2014 | ||
BE | 03.09.2014 | ||
BG | 03.09.2014 | ||
CY | 03.09.2014 | ||
CZ | 03.09.2014 | ||
DK | 03.09.2014 | ||
EE | 03.09.2014 | ||
ES | 03.09.2014 | ||
FI | 03.09.2014 | ||
HR | 03.09.2014 | ||
LT | 03.09.2014 | ||
LV | 03.09.2014 | ||
MC | 03.09.2014 | ||
MK | 03.09.2014 | ||
MT | 03.09.2014 | ||
NL | 03.09.2014 | ||
PL | 03.09.2014 | ||
RO | 03.09.2014 | ||
RS | 03.09.2014 | ||
SE | 03.09.2014 | ||
SI | 03.09.2014 | ||
SK | 03.09.2014 | ||
SM | 03.09.2014 | ||
TR | 03.09.2014 | ||
IE | 17.10.2014 | ||
LU | 17.10.2014 | ||
CH | 31.10.2014 | ||
LI | 31.10.2014 | ||
FR | 03.11.2014 | ||
NO | 03.12.2014 | ||
GR | 04.12.2014 | ||
IS | 03.01.2015 | ||
PT | 05.01.2015 | ||
Former [2016/33] | HU | 17.10.2011 | |
AT | 03.09.2014 | ||
BE | 03.09.2014 | ||
BG | 03.09.2014 | ||
CY | 03.09.2014 | ||
CZ | 03.09.2014 | ||
DK | 03.09.2014 | ||
EE | 03.09.2014 | ||
ES | 03.09.2014 | ||
FI | 03.09.2014 | ||
HR | 03.09.2014 | ||
LT | 03.09.2014 | ||
LV | 03.09.2014 | ||
MC | 03.09.2014 | ||
MT | 03.09.2014 | ||
NL | 03.09.2014 | ||
PL | 03.09.2014 | ||
RO | 03.09.2014 | ||
RS | 03.09.2014 | ||
SE | 03.09.2014 | ||
SI | 03.09.2014 | ||
SK | 03.09.2014 | ||
SM | 03.09.2014 | ||
TR | 03.09.2014 | ||
IE | 17.10.2014 | ||
LU | 17.10.2014 | ||
CH | 31.10.2014 | ||
LI | 31.10.2014 | ||
FR | 03.11.2014 | ||
NO | 03.12.2014 | ||
GR | 04.12.2014 | ||
IS | 03.01.2015 | ||
PT | 05.01.2015 | ||
Former [2016/32] | HU | 17.10.2011 | |
AT | 03.09.2014 | ||
BE | 03.09.2014 | ||
BG | 03.09.2014 | ||
CY | 03.09.2014 | ||
CZ | 03.09.2014 | ||
DK | 03.09.2014 | ||
EE | 03.09.2014 | ||
ES | 03.09.2014 | ||
FI | 03.09.2014 | ||
HR | 03.09.2014 | ||
LT | 03.09.2014 | ||
LV | 03.09.2014 | ||
MC | 03.09.2014 | ||
NL | 03.09.2014 | ||
PL | 03.09.2014 | ||
RO | 03.09.2014 | ||
RS | 03.09.2014 | ||
SE | 03.09.2014 | ||
SI | 03.09.2014 | ||
SK | 03.09.2014 | ||
SM | 03.09.2014 | ||
IE | 17.10.2014 | ||
CH | 31.10.2014 | ||
LI | 31.10.2014 | ||
FR | 03.11.2014 | ||
NO | 03.12.2014 | ||
GR | 04.12.2014 | ||
IS | 03.01.2015 | ||
PT | 05.01.2015 | ||
Former [2016/31] | AT | 03.09.2014 | |
BG | 03.09.2014 | ||
CY | 03.09.2014 | ||
CZ | 03.09.2014 | ||
DK | 03.09.2014 | ||
EE | 03.09.2014 | ||
ES | 03.09.2014 | ||
FI | 03.09.2014 | ||
HR | 03.09.2014 | ||
LT | 03.09.2014 | ||
LV | 03.09.2014 | ||
MC | 03.09.2014 | ||
NL | 03.09.2014 | ||
PL | 03.09.2014 | ||
RO | 03.09.2014 | ||
RS | 03.09.2014 | ||
SE | 03.09.2014 | ||
SI | 03.09.2014 | ||
SK | 03.09.2014 | ||
SM | 03.09.2014 | ||
IE | 17.10.2014 | ||
BE | 31.10.2014 | ||
CH | 31.10.2014 | ||
LI | 31.10.2014 | ||
FR | 03.11.2014 | ||
NO | 03.12.2014 | ||
GR | 04.12.2014 | ||
IS | 03.01.2015 | ||
PT | 05.01.2015 | ||
Former [2016/22] | AT | 03.09.2014 | |
CY | 03.09.2014 | ||
CZ | 03.09.2014 | ||
DK | 03.09.2014 | ||
EE | 03.09.2014 | ||
ES | 03.09.2014 | ||
FI | 03.09.2014 | ||
HR | 03.09.2014 | ||
LT | 03.09.2014 | ||
LV | 03.09.2014 | ||
MC | 03.09.2014 | ||
NL | 03.09.2014 | ||
PL | 03.09.2014 | ||
RO | 03.09.2014 | ||
RS | 03.09.2014 | ||
SE | 03.09.2014 | ||
SI | 03.09.2014 | ||
SK | 03.09.2014 | ||
SM | 03.09.2014 | ||
IE | 17.10.2014 | ||
BE | 31.10.2014 | ||
CH | 31.10.2014 | ||
LI | 31.10.2014 | ||
FR | 03.11.2014 | ||
NO | 03.12.2014 | ||
GR | 04.12.2014 | ||
IS | 03.01.2015 | ||
PT | 05.01.2015 | ||
Former [2015/51] | AT | 03.09.2014 | |
CY | 03.09.2014 | ||
CZ | 03.09.2014 | ||
DK | 03.09.2014 | ||
EE | 03.09.2014 | ||
ES | 03.09.2014 | ||
FI | 03.09.2014 | ||
HR | 03.09.2014 | ||
LT | 03.09.2014 | ||
LV | 03.09.2014 | ||
MC | 03.09.2014 | ||
NL | 03.09.2014 | ||
PL | 03.09.2014 | ||
RO | 03.09.2014 | ||
RS | 03.09.2014 | ||
SE | 03.09.2014 | ||
SI | 03.09.2014 | ||
SK | 03.09.2014 | ||
IE | 17.10.2014 | ||
BE | 31.10.2014 | ||
CH | 31.10.2014 | ||
LI | 31.10.2014 | ||
FR | 03.11.2014 | ||
NO | 03.12.2014 | ||
GR | 04.12.2014 | ||
IS | 03.01.2015 | ||
PT | 05.01.2015 | ||
Former [2015/46] | AT | 03.09.2014 | |
CY | 03.09.2014 | ||
CZ | 03.09.2014 | ||
DK | 03.09.2014 | ||
EE | 03.09.2014 | ||
ES | 03.09.2014 | ||
FI | 03.09.2014 | ||
HR | 03.09.2014 | ||
LT | 03.09.2014 | ||
LV | 03.09.2014 | ||
MC | 03.09.2014 | ||
NL | 03.09.2014 | ||
PL | 03.09.2014 | ||
RO | 03.09.2014 | ||
RS | 03.09.2014 | ||
SE | 03.09.2014 | ||
SK | 03.09.2014 | ||
IE | 17.10.2014 | ||
BE | 31.10.2014 | ||
CH | 31.10.2014 | ||
LI | 31.10.2014 | ||
FR | 03.11.2014 | ||
NO | 03.12.2014 | ||
GR | 04.12.2014 | ||
IS | 03.01.2015 | ||
PT | 05.01.2015 | ||
Former [2015/38] | AT | 03.09.2014 | |
CY | 03.09.2014 | ||
CZ | 03.09.2014 | ||
DK | 03.09.2014 | ||
EE | 03.09.2014 | ||
ES | 03.09.2014 | ||
FI | 03.09.2014 | ||
HR | 03.09.2014 | ||
LT | 03.09.2014 | ||
LV | 03.09.2014 | ||
MC | 03.09.2014 | ||
NL | 03.09.2014 | ||
PL | 03.09.2014 | ||
RO | 03.09.2014 | ||
RS | 03.09.2014 | ||
SE | 03.09.2014 | ||
SK | 03.09.2014 | ||
BE | 31.10.2014 | ||
CH | 31.10.2014 | ||
LI | 31.10.2014 | ||
FR | 03.11.2014 | ||
NO | 03.12.2014 | ||
GR | 04.12.2014 | ||
IS | 03.01.2015 | ||
PT | 05.01.2015 | ||
Former [2015/35] | AT | 03.09.2014 | |
CY | 03.09.2014 | ||
CZ | 03.09.2014 | ||
DK | 03.09.2014 | ||
EE | 03.09.2014 | ||
ES | 03.09.2014 | ||
FI | 03.09.2014 | ||
HR | 03.09.2014 | ||
LT | 03.09.2014 | ||
LV | 03.09.2014 | ||
MC | 03.09.2014 | ||
NL | 03.09.2014 | ||
PL | 03.09.2014 | ||
RO | 03.09.2014 | ||
RS | 03.09.2014 | ||
SE | 03.09.2014 | ||
SK | 03.09.2014 | ||
BE | 31.10.2014 | ||
CH | 31.10.2014 | ||
LI | 31.10.2014 | ||
NO | 03.12.2014 | ||
GR | 04.12.2014 | ||
IS | 03.01.2015 | ||
PT | 05.01.2015 | ||
Former [2015/33] | AT | 03.09.2014 | |
CY | 03.09.2014 | ||
CZ | 03.09.2014 | ||
EE | 03.09.2014 | ||
ES | 03.09.2014 | ||
FI | 03.09.2014 | ||
HR | 03.09.2014 | ||
LT | 03.09.2014 | ||
LV | 03.09.2014 | ||
MC | 03.09.2014 | ||
NL | 03.09.2014 | ||
PL | 03.09.2014 | ||
RO | 03.09.2014 | ||
RS | 03.09.2014 | ||
SE | 03.09.2014 | ||
SK | 03.09.2014 | ||
BE | 31.10.2014 | ||
CH | 31.10.2014 | ||
LI | 31.10.2014 | ||
NO | 03.12.2014 | ||
GR | 04.12.2014 | ||
IS | 03.01.2015 | ||
PT | 05.01.2015 | ||
Former [2015/32] | AT | 03.09.2014 | |
CY | 03.09.2014 | ||
CZ | 03.09.2014 | ||
EE | 03.09.2014 | ||
ES | 03.09.2014 | ||
FI | 03.09.2014 | ||
HR | 03.09.2014 | ||
LT | 03.09.2014 | ||
LV | 03.09.2014 | ||
MC | 03.09.2014 | ||
NL | 03.09.2014 | ||
PL | 03.09.2014 | ||
RO | 03.09.2014 | ||
RS | 03.09.2014 | ||
SE | 03.09.2014 | ||
SK | 03.09.2014 | ||
BE | 31.10.2014 | ||
NO | 03.12.2014 | ||
GR | 04.12.2014 | ||
IS | 03.01.2015 | ||
PT | 05.01.2015 | ||
Former [2015/30] | AT | 03.09.2014 | |
CY | 03.09.2014 | ||
CZ | 03.09.2014 | ||
EE | 03.09.2014 | ||
ES | 03.09.2014 | ||
FI | 03.09.2014 | ||
HR | 03.09.2014 | ||
LT | 03.09.2014 | ||
LV | 03.09.2014 | ||
NL | 03.09.2014 | ||
PL | 03.09.2014 | ||
RO | 03.09.2014 | ||
RS | 03.09.2014 | ||
SE | 03.09.2014 | ||
SK | 03.09.2014 | ||
BE | 31.10.2014 | ||
NO | 03.12.2014 | ||
GR | 04.12.2014 | ||
IS | 03.01.2015 | ||
PT | 05.01.2015 | ||
Former [2015/24] | AT | 03.09.2014 | |
CY | 03.09.2014 | ||
CZ | 03.09.2014 | ||
EE | 03.09.2014 | ||
ES | 03.09.2014 | ||
FI | 03.09.2014 | ||
HR | 03.09.2014 | ||
LT | 03.09.2014 | ||
LV | 03.09.2014 | ||
NL | 03.09.2014 | ||
PL | 03.09.2014 | ||
RO | 03.09.2014 | ||
RS | 03.09.2014 | ||
SE | 03.09.2014 | ||
SK | 03.09.2014 | ||
NO | 03.12.2014 | ||
GR | 04.12.2014 | ||
IS | 03.01.2015 | ||
PT | 05.01.2015 | ||
Former [2015/23] | AT | 03.09.2014 | |
CY | 03.09.2014 | ||
CZ | 03.09.2014 | ||
EE | 03.09.2014 | ||
ES | 03.09.2014 | ||
FI | 03.09.2014 | ||
HR | 03.09.2014 | ||
LT | 03.09.2014 | ||
LV | 03.09.2014 | ||
NL | 03.09.2014 | ||
RO | 03.09.2014 | ||
RS | 03.09.2014 | ||
SE | 03.09.2014 | ||
SK | 03.09.2014 | ||
NO | 03.12.2014 | ||
GR | 04.12.2014 | ||
IS | 03.01.2015 | ||
PT | 05.01.2015 | ||
Former [2015/22] | AT | 03.09.2014 | |
CY | 03.09.2014 | ||
ES | 03.09.2014 | ||
FI | 03.09.2014 | ||
HR | 03.09.2014 | ||
LT | 03.09.2014 | ||
LV | 03.09.2014 | ||
NL | 03.09.2014 | ||
RO | 03.09.2014 | ||
RS | 03.09.2014 | ||
SE | 03.09.2014 | ||
NO | 03.12.2014 | ||
GR | 04.12.2014 | ||
PT | 05.01.2015 | ||
Former [2015/16] | AT | 03.09.2014 | |
CY | 03.09.2014 | ||
ES | 03.09.2014 | ||
FI | 03.09.2014 | ||
HR | 03.09.2014 | ||
LT | 03.09.2014 | ||
LV | 03.09.2014 | ||
NL | 03.09.2014 | ||
RS | 03.09.2014 | ||
SE | 03.09.2014 | ||
NO | 03.12.2014 | ||
GR | 04.12.2014 | ||
Former [2015/12] | AT | 03.09.2014 | |
CY | 03.09.2014 | ||
ES | 03.09.2014 | ||
FI | 03.09.2014 | ||
HR | 03.09.2014 | ||
LT | 03.09.2014 | ||
LV | 03.09.2014 | ||
RS | 03.09.2014 | ||
SE | 03.09.2014 | ||
NO | 03.12.2014 | ||
GR | 04.12.2014 | ||
Former [2015/11] | CY | 03.09.2014 | |
ES | 03.09.2014 | ||
FI | 03.09.2014 | ||
LT | 03.09.2014 | ||
SE | 03.09.2014 | ||
NO | 03.12.2014 | ||
GR | 04.12.2014 | ||
Former [2015/10] | ES | 03.09.2014 | |
FI | 03.09.2014 | ||
LT | 03.09.2014 | ||
SE | 03.09.2014 | ||
NO | 03.12.2014 | ||
Former [2015/09] | FI | 03.09.2014 | |
LT | 03.09.2014 | ||
SE | 03.09.2014 | ||
Former [2015/08] | LT | 03.09.2014 | Cited in | International search | [A]US6026562 (MCMILLIN FRED [US], et al) [A] 1 * column 2, lines 52-61 * * column 4, lines 1-16 * * column 5, lines 3-24 * * column 9, lines 17-39 * * figures 1,1A,2,4,9 *; | [A]JP2007258032 (FURUKAWA ELECTRIC CO LTD, et al) [A] 1 * figures 1,4 * | by applicant | US6026562 |