EP2579055 - METHOD FOR THE CONTINUOUS MONITORING AND DIAGNOSIS OF SOURCES OF PARTIAL DISCHARGES (PDs) IN HIGH-VOLTAGE CABLES DURING CONNECTION TO, AND OPERATION IN THE POWER GRID, AND PHYSICAL SYSTEM FOR CARRYING OUT SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 29.04.2022 Database last updated on 21.05.2024 | |
Former | The patent has been granted Status updated on 21.05.2021 | ||
Former | Grant of patent is intended Status updated on 19.04.2021 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Universidad Politécnica de Madrid C/ Ramiro de Maeztu 7 28040 Madrid / ES | For all designated states Union Fenosa Distribucion, S.A. Avda. de San Luis, 77 28033 Madrid / ES | [2013/15] | Inventor(s) | 01 /
GARNACHO LÓPEZ, D.Fernando C/ Ramiro de Maeztu 7 28040 Madrid / ES | 02 /
SANCHEZ URAN, Miguel Angel C/ Ramiro de Maeztu 7 28040 Madrid / ES | 03 /
ORTEGO LA MONEDAY, Javier C/ Ramiro de Maeztu 7 28040 Madrid / ES | [2013/15] | Representative(s) | Clarke, Modet y Cía., S.L. C/ Suero de Quiñones 34-36 28002 Madrid / ES | [N/P] |
Former [2021/25] | Clarke Modet & Co. C/ Suero de Quiñones 34-36 28002 Madrid / ES | ||
Former [2013/15] | Carvajal y Urquijo, Isabel, et al Clarke, Modet & Co. c/ Goya, 11 28001 Madrid / ES | Application number, filing date | 11789287.7 | 24.05.2011 | [2021/25] | WO2011ES00169 | Priority number, date | ES20100000685 | 26.05.2010 Original published format: ES 201000685 | [2013/15] | Filing language | ES | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011151481 | Date: | 08.12.2011 | Language: | ES | [2011/49] | Type: | A1 Application with search report | No.: | EP2579055 | Date: | 10.04.2013 | Language: | EN | [2013/15] | Type: | B1 Patent specification | No.: | EP2579055 | Date: | 23.06.2021 | Language: | EN | [2021/25] | Search report(s) | International search report - published on: | ES | 08.12.2011 | (Supplementary) European search report - dispatched on: | EP | 26.10.2017 | Classification | IPC: | G01R31/08, G01R31/12 | [2017/48] | CPC: |
G01R31/1272 (EP,US);
G06F17/148 (US);
G01R31/08 (ES);
G01R31/088 (US);
G01R31/58 (US);
G06F17/18 (US);
G01R31/083 (EP,US)
(-)
|
Former IPC [2013/15] | G01R31/08 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUR KONTINUIERLICHEN ÜBERWACHUNG UND DIAGNOSE VON QUELLEN FÜR TEILENTLADUNGEN IN HOCHSPANNUNGSKABELN WÄHREND EINER VERBINDUNG ZU UND EINES BETRIEBS IN EINEM STROMNETZ SOWIE PHYSIKALISCHES SYSTEM ZUR DURCHFÜHRUNG DIESES VERFAHRENS | [2021/17] | English: | METHOD FOR THE CONTINUOUS MONITORING AND DIAGNOSIS OF SOURCES OF PARTIAL DISCHARGES (PDs) IN HIGH-VOLTAGE CABLES DURING CONNECTION TO, AND OPERATION IN THE POWER GRID, AND PHYSICAL SYSTEM FOR CARRYING OUT SAME | [2013/15] | French: | PROCÉDÉ DE SURVEILLANCE CONTINUE ET DIAGNOSTIC DES SOURCES DE DÉCHARGES PARTIELLES (DPS) DANS DES CÂBLES À HAUTE TENSION DURANT LEUR CONNEXION ET FONCTIONNEMENT DANS LE RÉSEAU, ET SYSTÈME PHYSIQUE DESTINÉ À LA MISE EN OEUVRE DU PROCÉDÉ | [2021/17] |
Former [2013/15] | VERFAHREN ZUR KONTINUIERLICHEN ÜBERWACHUNG UND DIAGNOSE VON QUELLEN FÜR PARTIELLE ENTLADUNGEN IN HOCHSPANNUNGSKABELN WÄHREND EINER VERBINDUNG ZU UND EINES BETRIEBS IN EINEM STROMGITTER SOWIE PHYSIKALISCHES SYSTEM ZUR DURCHFÜHRUNG DIESES VERFAHRENS | ||
Former [2013/15] | PROCÉDÉ DE MOTORISATION CONTINUE ET DIAGNOSTIC DES SOURCES DE DÉCHARGES PARTIELLES (DPS) DANS DES CÂBLES À HAUTE TENSION DURANT LEUR CONNEXION ET FONCTIONNEMENT DANS LE RÉSEAU, ET SYSTÈME PHYSIQUE DESTINÉ À LA MISE EN OEUVRE DU PROCÉDÉ | Entry into regional phase | 19.12.2012 | Translation filed | 19.12.2012 | National basic fee paid | 19.12.2012 | Search fee paid | 19.12.2012 | Designation fee(s) paid | 19.12.2012 | Examination fee paid | Examination procedure | 26.03.2012 | Request for preliminary examination filed International Preliminary Examining Authority: ES | 19.12.2012 | Examination requested [2013/15] | 18.05.2018 | Amendment by applicant (claims and/or description) | 20.04.2021 | Communication of intention to grant the patent | 11.05.2021 | Fee for grant paid | 11.05.2021 | Fee for publishing/printing paid | 11.05.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 20.04.2021 | Opposition(s) | 24.03.2022 | No opposition filed within time limit [2022/22] | Fees paid | Renewal fee | 22.03.2013 | Renewal fee patent year 03 | 27.05.2014 | Renewal fee patent year 04 | 19.05.2015 | Renewal fee patent year 05 | 27.05.2016 | Renewal fee patent year 06 | 08.05.2017 | Renewal fee patent year 07 | 23.04.2018 | Renewal fee patent year 08 | 23.04.2019 | Renewal fee patent year 09 | 10.03.2020 | Renewal fee patent year 10 | 30.03.2021 | Renewal fee patent year 11 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.05.2011 | AL | 23.06.2021 | AT | 23.06.2021 | CY | 23.06.2021 | CZ | 23.06.2021 | DK | 23.06.2021 | EE | 23.06.2021 | FI | 23.06.2021 | HR | 23.06.2021 | LT | 23.06.2021 | LV | 23.06.2021 | MC | 23.06.2021 | MK | 23.06.2021 | PL | 23.06.2021 | RO | 23.06.2021 | RS | 23.06.2021 | SE | 23.06.2021 | SI | 23.06.2021 | SK | 23.06.2021 | SM | 23.06.2021 | BG | 23.09.2021 | NO | 23.09.2021 | GR | 24.09.2021 | IS | 23.10.2021 | PT | 25.10.2021 | [2024/22] |
Former [2024/20] | HU | 24.05.2011 | |
AL | 23.06.2021 | ||
AT | 23.06.2021 | ||
CY | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2024/18] | HU | 24.05.2011 | |
AL | 23.06.2021 | ||
AT | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2023/06] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
MC | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/29] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SI | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/26] | AL | 23.06.2021 | |
AT | 23.06.2021 | ||
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/21] | AT | 23.06.2021 | |
CZ | 23.06.2021 | ||
DK | 23.06.2021 | ||
EE | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/10] | AT | 23.06.2021 | |
CZ | 23.06.2021 | ||
EE | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
PL | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
IS | 23.10.2021 | ||
PT | 25.10.2021 | ||
Former [2022/09] | AT | 23.06.2021 | |
CZ | 23.06.2021 | ||
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
RO | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SK | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
PT | 25.10.2021 | ||
Former [2022/07] | AT | 23.06.2021 | |
FI | 23.06.2021 | ||
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
SM | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
Former [2021/51] | FI | 23.06.2021 | |
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
RS | 23.06.2021 | ||
SE | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
Former [2021/49] | FI | 23.06.2021 | |
HR | 23.06.2021 | ||
LT | 23.06.2021 | ||
LV | 23.06.2021 | ||
SE | 23.06.2021 | ||
BG | 23.09.2021 | ||
NO | 23.09.2021 | ||
GR | 24.09.2021 | ||
Former [2021/47] | FI | 23.06.2021 | |
LT | 23.06.2021 | ||
BG | 23.09.2021 | ||
Former [2021/46] | FI | 23.06.2021 | |
LT | 23.06.2021 | Documents cited: | Search | [I]US2006038573 (SARKOZI JANOS G [US], et al) [I] 1-16 * paragraphs [0007] , [0033] - [0053]; figures 1-3,6 *; | [XI]CA2608216 (HYDRO QUEBEC [CA]) [X] 1,10 * page 14, line 4 - page 33, line 32; figures 3,4,11,12,13 *[I] 2-9,11-16; | [I]US2009012727 (SIEW WAH HOON [GB], et al) [I] 1-16 * paragraphs [0001] , [0002] , [0004] , [0008] - [0020] - [0044] - [0064]; figures 1,3,4 *; | [XI]US2009177420 (FOURNIER DANIEL [CA], et al) [X] 1,10 * paragraphs [0109] - [0169]; figures 4,11,12,13 * [I] 2-9,11-16; | [IA]US2009248327 (MONTANARI GIAN CARLO [IT], et al) [I] 1,10 * paragraphs [0004] - [0009] - [0050] - [0069] - [0096] * [A] 2-9,11-16 | International search | [A]US6809523 (AHMED NEZAR [US], et al); | [A]WO2006092632 (UNIV STRATHCLYDE [GB], et al); | [A]WO2010015958 (ESKOM HOLDINGS PTY LTD [ZA], et al); | [A]EP2187226 (KOREA ELECTRIC POWER CORP [KR]); | [X] - G.G.STONE., "Partial Discharge Diagnostics and Electrical Equipment Insulation Condition Assessment", IEEE TRANSACTIONS ON DIELECTRICS AND ELECTRICAL INSULATION., vol. 12, no. 5, (20051005), URL: http://ieeexplore.ieee.org/stamp/stamp.jsp?arnumber=01522184, XP055101396 DOI: http://dx.doi.org/10.1109/TDEI.2005.1522184 |