EP2591642 - AMBIENT AND TASK LEVEL LOAD CONTROL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.02.2022 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 19.02.2021 | ||
Former | Grant of patent is intended Status updated on 13.10.2020 | ||
Former | Examination is in progress Status updated on 07.07.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Daintree Networks Pty. Ltd. 1 Dalmore Drive, Caribbean Park Scoresby, VIC 3179 / AU | [2020/46] |
Former [2013/20] | For all designated states Daintree Networks Pty. Ltd. 1 Dalmore Drive, Carribean Park Scoresby, VIC 3179 / AU | Inventor(s) | 01 /
CHOONG, Jason, Yew, Choo 497 Marshall Avenue San Jose, CA 95125 / US | 02 /
GARCIA, Tony 1290 Hillcrest Blvd. Millbrae California 94030 / US | 03 /
BUCHANAN, Dallas, Ivanhoe, III 219 Foster Avenue Kentfield California 94904 / US | 04 /
YU, Danny 950 High School Way 3327 Mountain View California 94904 / US | [2013/20] | Representative(s) | FRKelly Waterways House Grand Canal Quay Dublin D02 PD39 / IE | [N/P] |
Former [2021/12] | FRKelly 27 Clyde Road Dublin D04 F838 / IE | ||
Former [2013/20] | Schley, Jan Malte Fish & Richardson P.C. Highlight Business Towers Mies-van-der-Rohe-Str. 8 80807 München / DE | Application number, filing date | 11804231.6 | 01.07.2011 | [2021/12] | WO2011US42827 | Priority number, date | US20100833239 | 09.07.2010 Original published format: US 833239 | [2013/20] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2012006246 | Date: | 12.01.2012 | Language: | EN | [2012/02] | Type: | A2 Application without search report | No.: | EP2591642 | Date: | 15.05.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 12.01.2012 takes the place of the publication of the European patent application. | [2013/20] | Type: | B1 Patent specification | No.: | EP2591642 | Date: | 24.03.2021 | Language: | EN | [2021/12] | Search report(s) | International search report - published on: | KR | 19.04.2012 | (Supplementary) European search report - dispatched on: | EP | 23.06.2017 | Classification | IPC: | H05B47/11 | [2020/43] | CPC: |
H05B47/115 (EP,US);
H05B45/10 (EP,US);
H05B47/11 (EP,US);
H05B47/165 (EP,US);
H05B47/175 (US);
Y02B20/40 (EP,US)
|
Former IPC [2013/20] | H05B37/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/20] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | UMGEBUNGS- UND AUFGABENBELASTUNGSSTEUERUNG | [2013/20] | English: | AMBIENT AND TASK LEVEL LOAD CONTROL | [2013/20] | French: | RÉGULATION DE CHARGE AMBIANTE ET PAR POSTE DE TRAVAIL | [2013/20] | Entry into regional phase | 17.12.2012 | National basic fee paid | 17.12.2012 | Search fee paid | 17.12.2012 | Designation fee(s) paid | 17.12.2012 | Examination fee paid | Examination procedure | 17.12.2012 | Amendment by applicant (claims and/or description) | 17.12.2012 | Examination requested [2013/20] | 10.07.2017 | Despatch of a communication from the examining division (Time limit: M06) | 22.01.2018 | Reply to a communication from the examining division | 29.01.2020 | Despatch of a communication from the examining division (Time limit: M06) | 07.08.2020 | Reply to a communication from the examining division | 14.10.2020 | Communication of intention to grant the patent | 12.02.2021 | Fee for grant paid | 12.02.2021 | Fee for publishing/printing paid | 12.02.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 10.07.2017 | Opposition(s) | 04.01.2022 | No opposition filed within time limit [2022/10] | Fees paid | Renewal fee | 29.07.2013 | Renewal fee patent year 03 | 28.07.2014 | Renewal fee patent year 04 | 28.09.2015 | Renewal fee patent year 05 | 27.07.2016 | Renewal fee patent year 06 | 31.07.2017 | Renewal fee patent year 07 | 03.08.2018 | Renewal fee patent year 08 | 22.07.2019 | Renewal fee patent year 09 | 22.07.2020 | Renewal fee patent year 10 | Penalty fee | Additional fee for renewal fee | 31.07.2015 | 05   M06   Fee paid on   28.09.2015 | 31.07.2018 | 08   M06   Fee paid on   31.01.2019 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 01.07.2011 | AL | 24.03.2021 | AT | 24.03.2021 | CY | 24.03.2021 | CZ | 24.03.2021 | DK | 24.03.2021 | EE | 24.03.2021 | ES | 24.03.2021 | FI | 24.03.2021 | HR | 24.03.2021 | IT | 24.03.2021 | LT | 24.03.2021 | LV | 24.03.2021 | MC | 24.03.2021 | MK | 24.03.2021 | MT | 24.03.2021 | NL | 24.03.2021 | PL | 24.03.2021 | RO | 24.03.2021 | RS | 24.03.2021 | SE | 24.03.2021 | SI | 24.03.2021 | SK | 24.03.2021 | SM | 24.03.2021 | TR | 24.03.2021 | BG | 24.06.2021 | NO | 24.06.2021 | GR | 25.06.2021 | GB | 01.07.2021 | IE | 01.07.2021 | LU | 01.07.2021 | IS | 24.07.2021 | PT | 26.07.2021 | BE | 31.07.2021 | CH | 31.07.2021 | FR | 31.07.2021 | LI | 31.07.2021 | [2024/41] |
Former [2024/29] | HU | 01.07.2011 | |
AL | 24.03.2021 | ||
AT | 24.03.2021 | ||
CY | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
IT | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
MK | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
TR | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
GB | 01.07.2021 | ||
IE | 01.07.2021 | ||
LU | 01.07.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
FR | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2024/22] | HU | 01.07.2011 | |
AL | 24.03.2021 | ||
AT | 24.03.2021 | ||
CY | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
IT | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
MK | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
GB | 01.07.2021 | ||
IE | 01.07.2021 | ||
LU | 01.07.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
FR | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2023/29] | HU | 01.07.2011 | |
AL | 24.03.2021 | ||
AT | 24.03.2021 | ||
CY | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
IT | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
GB | 01.07.2021 | ||
IE | 01.07.2021 | ||
LU | 01.07.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
FR | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2023/24] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CY | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
IT | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
GB | 01.07.2021 | ||
IE | 01.07.2021 | ||
LU | 01.07.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
FR | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2023/10] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
IT | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
GB | 01.07.2021 | ||
IE | 01.07.2021 | ||
LU | 01.07.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
FR | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2022/35] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
GB | 01.07.2021 | ||
IE | 01.07.2021 | ||
LU | 01.07.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
FR | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2022/34] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
GB | 01.07.2021 | ||
LU | 01.07.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
FR | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2022/23] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
GB | 01.07.2021 | ||
LU | 01.07.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
CH | 31.07.2021 | ||
FR | 31.07.2021 | ||
LI | 31.07.2021 | ||
Former [2022/22] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
GB | 01.07.2021 | ||
PT | 26.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
IS | 23.12.2021 | ||
Former [2022/21] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
PT | 26.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
IS | 23.12.2021 | ||
Former [2022/18] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
PT | 26.07.2021 | ||
IS | 23.12.2021 | ||
Former [2022/13] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
PT | 26.07.2021 | ||
IS | 23.12.2021 | ||
Former [2022/10] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
PT | 26.07.2021 | ||
IS | 23.12.2021 | ||
Former [2022/08] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
Former [2022/07] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
Former [2021/52] | AT | 24.03.2021 | |
CZ | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
Former [2021/51] | AT | 24.03.2021 | |
CZ | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
Former [2021/50] | AT | 24.03.2021 | |
CZ | 24.03.2021 | ||
EE | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
PT | 26.07.2021 | ||
Former [2021/48] | AT | 24.03.2021 | |
CZ | 24.03.2021 | ||
EE | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
Former [2021/46] | AT | 24.03.2021 | |
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
Former [2021/43] | FI | 24.03.2021 | |
HR | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
Former [2021/38] | FI | 24.03.2021 | |
HR | 24.03.2021 | ||
LV | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
Former [2021/37] | FI | 24.03.2021 | |
HR | 24.03.2021 | ||
LV | 24.03.2021 | ||
RS | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
Former [2021/36] | FI | 24.03.2021 | |
HR | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
Former [2021/35] | FI | 24.03.2021 | |
HR | 24.03.2021 | ||
NO | 24.06.2021 | ||
Former [2021/33] | FI | 24.03.2021 | |
NO | 24.06.2021 | Documents cited: | Search | [A]WO2008038188 (PHILIPS INTELLECTUAL PROPERTY [DE], et al) [A] 1-15 * the whole document *; | [A]WO2008078286 (KONINKL PHILIPS ELECTRONICS NV [NL], et al) [A] 1-15* the whole document *; | [XA]US2008191630 (PENG ROBIN [US]) [X] 1 * paragraphs [0006] , [0016] - [0023]; figures 1-4 * [A] 2-15; | [XI]WO2009060377 (PHILIPS INTELLECTUAL PROPERTY [DE], et al) [X] 1,2,15 * page 1, lines 19-29 * * page 3, line 24 - page 5, line 8 * * page 7, line 23 - page 11, line 20 * * page 15, line 3 - page 17, line 13 * * figures 1,2 * [I] 3-14 | International search | [A]JP2010073633 (TOSHIBA LIGHTING & TECHNOLOGY); | [A]JP2010086686 (TOSHIBA LIGHTING & TECHNOLOGY); | [A]JP2010027418 (TOSHIBA LIGHTING & TECHNOLOGY); | [A]KR20030029780 (KIM MEE HYUN [KR]); | [A]KR20100064861 (SJ TECH LED SYSTEM CO LTD [KR]) | by applicant | US2008191630 | WO2009060377 |