EP2571567 - ENVELOPE SPECIFIC STIMULUS TIMING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 21.06.2019 Database last updated on 08.06.2024 | |
Former | The patent has been granted Status updated on 13.07.2018 | ||
Former | Grant of patent is intended Status updated on 02.05.2018 | ||
Former | Examination is in progress Status updated on 10.11.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states MED-EL Elektromedizinische Geräte GmbH Fürstenweg 77 6020 Innsbruck / AT | [2013/13] | Inventor(s) | 01 /
MEISTER, Dirk Schießstand 13 A-6094 Axams / AT | 02 /
FRÜHAUF, Florian Hauptstrasse 1c/1 A-6074 Rinn / AT | [2013/13] | Representative(s) | Downing, Michael Philip, et al Downing IP Limited Grosvenor House 7 Horseshoe Crescent Beaconsfield, Bucks. HP9 1LJ / GB | [2018/33] |
Former [2013/13] | Downing, Michael Philip Downing IP Oak House Oak End Way Gerrards Cross Buckinghamshire SL9 8BR / GB | Application number, filing date | 11810115.3 | 29.06.2011 | [2018/33] | WO2011US42307 | Priority number, date | US20100360123P | 30.06.2010 Original published format: US 360123 P | [2013/13] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2012012159 | Date: | 26.01.2012 | Language: | EN | [2012/04] | Type: | A1 Application with search report | No.: | EP2571567 | Date: | 27.03.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 26.01.2012 takes the place of the publication of the European patent application. | [2013/13] | Type: | B1 Patent specification | No.: | EP2571567 | Date: | 15.08.2018 | Language: | EN | [2018/33] | Search report(s) | International search report - published on: | US | 26.01.2012 | (Supplementary) European search report - dispatched on: | EP | 09.12.2013 | Classification | IPC: | A61N1/36 | [2014/02] | CPC: |
A61N1/36038 (EP,KR,US);
A61N1/36034 (KR);
H04R25/606 (KR)
|
Former IPC [2013/13] | A61N1/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/13] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | HÜLLENSPEZIFISCHES STIMULUS-TIMING | [2013/13] | English: | ENVELOPE SPECIFIC STIMULUS TIMING | [2013/13] | French: | SYNCHRONISATION DE STIMULATIONS SPÉCIFIQUES D'ENVELOPPES | [2013/13] | Entry into regional phase | 15.11.2012 | National basic fee paid | 15.11.2012 | Search fee paid | 15.11.2012 | Designation fee(s) paid | 15.11.2012 | Examination fee paid | Examination procedure | 15.11.2012 | Examination requested [2013/13] | 29.04.2014 | Amendment by applicant (claims and/or description) | 08.11.2017 | Despatch of a communication from the examining division (Time limit: M04) | 05.03.2018 | Reply to a communication from the examining division | 03.05.2018 | Communication of intention to grant the patent | 27.06.2018 | Fee for grant paid | 27.06.2018 | Fee for publishing/printing paid | 27.06.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 08.11.2017 | Opposition(s) | 16.05.2019 | No opposition filed within time limit [2019/30] | Fees paid | Renewal fee | 31.03.2013 | Renewal fee patent year 03 | 31.03.2014 | Renewal fee patent year 04 | 30.06.2015 | Renewal fee patent year 05 | 30.06.2016 | Renewal fee patent year 06 | 29.06.2017 | Renewal fee patent year 07 | 29.06.2018 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.06.2011 | AL | 15.08.2018 | AT | 15.08.2018 | CY | 15.08.2018 | CZ | 15.08.2018 | DK | 15.08.2018 | EE | 15.08.2018 | ES | 15.08.2018 | FI | 15.08.2018 | HR | 15.08.2018 | IT | 15.08.2018 | LT | 15.08.2018 | LV | 15.08.2018 | MC | 15.08.2018 | MK | 15.08.2018 | MT | 15.08.2018 | NL | 15.08.2018 | PL | 15.08.2018 | RO | 15.08.2018 | RS | 15.08.2018 | SE | 15.08.2018 | SI | 15.08.2018 | SK | 15.08.2018 | SM | 15.08.2018 | TR | 15.08.2018 | BG | 15.11.2018 | NO | 15.11.2018 | GR | 16.11.2018 | IS | 15.12.2018 | PT | 15.12.2018 | [2022/31] |
Former [2021/34] | HU | 29.06.2011 | |
AL | 15.08.2018 | ||
AT | 15.08.2018 | ||
CY | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
MT | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
TR | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
PT | 15.12.2018 | ||
Former [2021/32] | HU | 29.06.2011 | |
AL | 15.08.2018 | ||
AT | 15.08.2018 | ||
CY | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
TR | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
PT | 15.12.2018 | ||
Former [2021/26] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CY | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
TR | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
PT | 15.12.2018 | ||
Former [2020/29] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
TR | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
PT | 15.12.2018 | ||
Former [2020/16] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
TR | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2020/08] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/37] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/26] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/23] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SK | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/22] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
NL | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/21] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
NL | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/12] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
NL | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/11] | AT | 15.08.2018 | |
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
LT | 15.08.2018 | ||
NL | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/10] | AT | 15.08.2018 | |
FI | 15.08.2018 | ||
LT | 15.08.2018 | ||
NL | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/09] | FI | 15.08.2018 | |
LT | 15.08.2018 | ||
NL | 15.08.2018 | ||
NO | 15.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/08] | FI | 15.08.2018 | |
LT | 15.08.2018 | ||
NO | 15.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/07] | LT | 15.08.2018 | Documents cited: | Search | [A]US5583969 (YOSHIZUMI YOSHIYUKI [JP], et al) [A] 1-17 * the whole document *; | [A]WO0131632 (UNIV MELBOURNE [AU], et al) [A] 1-17 * the whole document *; | [X]US2006080087 (VANDALI ANDREW [AU], et al) [X] 1,4-8,10,14-16 * figures 1, 2, 9 * * paragraph [0057] - paragraph [0074] * * paragraph [0169] - paragraph [0202] *; | [A]US2009125082 (SCHLEICH PETER [AT]) [A] 1-17* the whole document * | International search | [Y]US2007270949 (PAOLINI ANTONIO G [AU], et al); | [Y]US2007282396 (OVERSTREET EDWARD H [US], et al); | [X]US2009125082 (SCHLEICH PETER [AT]); | [Y]US2009161896 (SWANSON BRETT ANTHONY [AU], et al); | [Y]US2009312820 (NIE KAIBAO [US], et al) | by applicant | US5583969 | WO0131632 | US6348070 | US2006080087 | US2009161896 | - HOCHMAIR I; NOPP P; JOLLY C; SCHMIDT M; SCHOBER H; GARNHAM C; ANDERSON I, "MED-EL Cochlear Implants: State of the Art and a Glimpse into the Future", TRENDS IN AMPLIFICATION, (2006), vol. 10, pages 201 - 219, XP009130970 | - SECKER-WALKER; SEARLE, "Time Domain Analysis Of Auditory Nerve Tissue Firing Rates", J ACOUST. SOC. AM., (1990), vol. 88, no. 3, doi:doi:10.1121/1.399719, pages 1427 - 1436, XP000605524 DOI: http://dx.doi.org/10.1121/1.399719 | - P. HEIL, "Auditory Cortical Onset Responses Revisited: I. First- Spike Timing", J. NEUROPHYSIOL., (1997), vol. 77, pages 2616 - 2641 | - TAN ET AL., "First Spike Latency And Spike Count As Functions Of Tone Amplitude And Frequency In The Inferior Colliculus Of Mice", HEAR RES., (2008), vol. 235, no. 1-2, doi:doi:10.1016/j.heares.2007.10.002, pages 90 - 104, XP022398556 DOI: http://dx.doi.org/10.1016/j.heares.2007.10.002 | - FURUKAWA ET AL., "Cortical Representation ofAuditory Space: Information-Bearing Features of Spike Patterns", 3. OF NEUROPHYSIOLOGY, (200204), vol. 87, no. 4, pages 1749 - 1762 | - HEIL P., "Auditory Cortical Onset Responses Revisited. I. First-Spike Timing", J. NEUROPHYSIOL., (1997), vol. 77, pages 2616 - 2641 |