EP2795964 - NETWORK NODE AND METHOD IN A NETWORK NODE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.01.2020 Database last updated on 20.07.2024 | |
Former | The patent has been granted Status updated on 25.01.2019 | ||
Former | Grant of patent is intended Status updated on 10.12.2018 | ||
Former | Examination is in progress Status updated on 17.02.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [2019/09] |
Former [2014/44] | For all designated states Telefonaktiebolaget LM Ericsson (PUBL) 164 83 Stockholm / SE | Inventor(s) | 01 /
GUNNARSSON, Fredrik Tinnerbäcksgränd 28 S-587 50 Linköping / SE | 02 /
FOLKE, Mats Professorsvägen 122 B S-977 51 Luleå / SE | 03 /
MÜLLER, Walter Huginvägen 7 S-194 62 Upplands Väsby / SE | [2014/44] | Representative(s) | Zacco Sweden AB P.O. Box 5581 Löjtnantsgatan 21 114 85 Stockholm / SE | [N/P] |
Former [2019/09] | Zacco Sweden AB P.O. Box 5581 114 85 Stockholm / SE | ||
Former [2014/44] | Kühn, Friedrich Heinrich Ericsson AB Patent Unit Kista RAN 1 Torshamnsgatan 23 164 80 Stockholm / SE | Application number, filing date | 11811189.7 | 19.12.2011 | [2019/09] | WO2011SE51539 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013095216 | Date: | 27.06.2013 | Language: | EN | [2013/26] | Type: | A1 Application with search report | No.: | EP2795964 | Date: | 29.10.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 27.06.2013 takes the place of the publication of the European patent application. | [2014/44] | Type: | B1 Patent specification | No.: | EP2795964 | Date: | 27.02.2019 | Language: | EN | [2019/09] | Search report(s) | International search report - published on: | EP | 27.06.2013 | Classification | IPC: | H04W36/00, // H04W36/04 | [2018/48] | CPC: |
H04W36/0088 (EP,US);
H04W36/249 (EP,US);
H04W36/0058 (EP,US);
H04W36/04 (EP,US)
|
Former IPC [2014/44] | H04W36/24 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/44] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | NETZWERKKNOTEN UND VERFAHREN IN EINEM NETZWERKKNOTEN | [2014/44] | English: | NETWORK NODE AND METHOD IN A NETWORK NODE | [2014/44] | French: | NOEUD DE RÉSEAU ET PROCÉDÉ DANS UN NOEUD DE RÉSEAU | [2018/52] |
Former [2014/44] | N UD DE RÉSEAU ET PROCÉDÉ POUR N UD DE RÉSEAU | Entry into regional phase | 25.06.2014 | National basic fee paid | 25.06.2014 | Designation fee(s) paid | 25.06.2014 | Examination fee paid | Examination procedure | 25.06.2014 | Amendment by applicant (claims and/or description) | 25.06.2014 | Examination requested [2014/44] | 20.02.2017 | Despatch of a communication from the examining division (Time limit: M04) | 19.06.2017 | Reply to a communication from the examining division | 05.03.2018 | Despatch of a communication from the examining division (Time limit: M06) | 17.08.2018 | Reply to a communication from the examining division | 11.12.2018 | Communication of intention to grant the patent | 07.01.2019 | Fee for grant paid | 07.01.2019 | Fee for publishing/printing paid | 07.01.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 20.02.2017 | Opposition(s) | 28.11.2019 | No opposition filed within time limit [2020/06] | Fees paid | Renewal fee | 30.06.2014 | Renewal fee patent year 03 | 29.12.2014 | Renewal fee patent year 04 | 28.12.2015 | Renewal fee patent year 05 | 27.12.2016 | Renewal fee patent year 06 | 27.12.2017 | Renewal fee patent year 07 | 31.12.2018 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.12.2011 | AL | 27.02.2019 | AT | 27.02.2019 | CY | 27.02.2019 | CZ | 27.02.2019 | DK | 27.02.2019 | EE | 27.02.2019 | ES | 27.02.2019 | FI | 27.02.2019 | HR | 27.02.2019 | IT | 27.02.2019 | LT | 27.02.2019 | LV | 27.02.2019 | MC | 27.02.2019 | MK | 27.02.2019 | MT | 27.02.2019 | PL | 27.02.2019 | RO | 27.02.2019 | RS | 27.02.2019 | SE | 27.02.2019 | SI | 27.02.2019 | SK | 27.02.2019 | SM | 27.02.2019 | TR | 27.02.2019 | BG | 27.05.2019 | NO | 27.05.2019 | GR | 28.05.2019 | IS | 27.06.2019 | PT | 27.06.2019 | [2022/31] |
Former [2021/34] | HU | 19.12.2011 | |
AL | 27.02.2019 | ||
AT | 27.02.2019 | ||
CY | 27.02.2019 | ||
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
MC | 27.02.2019 | ||
MT | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
RS | 27.02.2019 | ||
SE | 27.02.2019 | ||
SI | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
TR | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2021/33] | HU | 19.12.2011 | |
AL | 27.02.2019 | ||
AT | 27.02.2019 | ||
CY | 27.02.2019 | ||
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
MC | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
RS | 27.02.2019 | ||
SE | 27.02.2019 | ||
SI | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
TR | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2021/26] | AL | 27.02.2019 | |
AT | 27.02.2019 | ||
CY | 27.02.2019 | ||
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
MC | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
RS | 27.02.2019 | ||
SE | 27.02.2019 | ||
SI | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
TR | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2020/39] | AL | 27.02.2019 | |
AT | 27.02.2019 | ||
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
MC | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
RS | 27.02.2019 | ||
SE | 27.02.2019 | ||
SI | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
TR | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2020/17] | AL | 27.02.2019 | |
AT | 27.02.2019 | ||
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
RS | 27.02.2019 | ||
SE | 27.02.2019 | ||
SI | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
TR | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2020/13] | AL | 27.02.2019 | |
AT | 27.02.2019 | ||
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
RS | 27.02.2019 | ||
SE | 27.02.2019 | ||
SI | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2020/03] | AL | 27.02.2019 | |
AT | 27.02.2019 | ||
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
RS | 27.02.2019 | ||
SE | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2019/52] | AL | 27.02.2019 | |
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
PL | 27.02.2019 | ||
RO | 27.02.2019 | ||
RS | 27.02.2019 | ||
SE | 27.02.2019 | ||
SK | 27.02.2019 | ||
SM | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2019/49] | AL | 27.02.2019 | |
CZ | 27.02.2019 | ||
DK | 27.02.2019 | ||
EE | 27.02.2019 | ||
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
RO | 27.02.2019 | ||
RS | 27.02.2019 | ||
SE | 27.02.2019 | ||
SK | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2019/48] | DK | 27.02.2019 | |
ES | 27.02.2019 | ||
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
RS | 27.02.2019 | ||
SE | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2019/47] | ES | 27.02.2019 | |
FI | 27.02.2019 | ||
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
RS | 27.02.2019 | ||
SE | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2019/46] | FI | 27.02.2019 | |
HR | 27.02.2019 | ||
IT | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
RS | 27.02.2019 | ||
SE | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2019/39] | FI | 27.02.2019 | |
HR | 27.02.2019 | ||
LT | 27.02.2019 | ||
LV | 27.02.2019 | ||
RS | 27.02.2019 | ||
SE | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
IS | 27.06.2019 | ||
PT | 27.06.2019 | ||
Former [2019/38] | FI | 27.02.2019 | |
LT | 27.02.2019 | ||
SE | 27.02.2019 | ||
BG | 27.05.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
PT | 27.06.2019 | ||
Former [2019/37] | FI | 27.02.2019 | |
LT | 27.02.2019 | ||
SE | 27.02.2019 | ||
NO | 27.05.2019 | ||
GR | 28.05.2019 | ||
PT | 27.06.2019 | ||
Former [2019/34] | FI | 27.02.2019 | |
LT | 27.02.2019 | ||
SE | 27.02.2019 | ||
NO | 27.05.2019 | ||
PT | 27.06.2019 | ||
Former [2019/33] | FI | 27.02.2019 | |
LT | 27.02.2019 | ||
NO | 27.05.2019 | ||
PT | 27.06.2019 | Cited in | International search | [A]US6446132 (KIKUCHI TSUNEYUKI [JP]); | [XAI]EP1533948 (FUJITSU LTD [JP]); | [A]EP1679921 (FUJITSU LTD [JP]) |