EP2602871 - CONNECTOR SUITABLE FOR ENAMELED WIRE [Right-click to bookmark this link] | |||
Former [2013/24] | WIRE CONNECTING TERMINAL FOR ENAMELED WIRES | ||
[2018/32] | Status | No opposition filed within time limit Status updated on 21.06.2019 Database last updated on 31.05.2024 | |
Former | The patent has been granted Status updated on 13.07.2018 | ||
Former | Grant of patent is intended Status updated on 11.02.2018 | ||
Former | Examination is in progress Status updated on 23.12.2016 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Traftor Technology (Shenzhen) Co., Ltd Center Power Industrial Park Tongfu Industrial District Dapeng Town Shenzhen, Guangdong 518120 / CN | [2018/33] |
Former [2013/24] | For all designated states Traftor Technolo (Shenzhen) Co., Ltd Center Power Industrial Park Tongfu Industrial District Dapeng Town Shenzhen, Guangdong 518120 / CN | Inventor(s) | 01 /
MAREK, Jerzy, Kowalczewski Center Power Industrial Park Tongfu Industrial District Dapeng Town Shenzhen Guangdong 518120 / CN | 02 /
LI, Hui Center Power Industrial Park Tongfu Industrial District Dapeng Town Shenzhen Guangdong 518120 / CN | [2018/33] |
Former [2013/24] | 01 /
MAREK, Jerzy, Kowalczewski Center Power Industrial Park Tongfu Industrial District Dapeng Town Shenzhen Guangdong 518120 / CN | Representative(s) | Studio Torta S.p.A. Via Viotti, 9 10121 Torino / IT | [2018/33] |
Former [2013/24] | Bongiovanni, Simone, et al Studio Torta S.p.A. Via Viotti, 9 10121 Torino / IT | Application number, filing date | 11814004.5 | 16.05.2011 | [2018/33] | WO2011CN00853 | Priority number, date | CN201010247973 | 06.08.2010 Original published format: CN201010247973 | [2013/24] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2012016420 | Date: | 09.02.2012 | Language: | ZH | [2012/06] | Type: | A1 Application with search report | No.: | EP2602871 | Date: | 12.06.2013 | Language: | EN | [2013/24] | Type: | B1 Patent specification | No.: | EP2602871 | Date: | 15.08.2018 | Language: | EN | [2018/33] | Search report(s) | International search report - published on: | CN | 09.02.2012 | (Supplementary) European search report - dispatched on: | EP | 27.03.2014 | Classification | IPC: | H01R4/02, H01R4/62, H01R9/00, H01R11/11 | [2013/24] | CPC: |
H01R4/029 (EP,US);
H01R11/11 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/24] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERBINDER FÜR EMAILLE-LEITER | [2018/32] | English: | CONNECTOR SUITABLE FOR ENAMELED WIRE | [2018/32] | French: | CONNECTEUR POUR FILS DESTINÉ AUX FILS LAQUÉS | [2018/32] |
Former [2013/24] | DRAHTANSCHLUSSKLEMME FÜR EMAILLE-LEITER | ||
Former [2013/24] | WIRE CONNECTING TERMINAL FOR ENAMELED WIRES | ||
Former [2013/24] | BORNE DE CONNEXION POUR FILS DESTINÉE AUX FILS LAQUÉS | Entry into regional phase | 06.03.2013 | Translation filed | 06.03.2013 | National basic fee paid | 06.03.2013 | Search fee paid | 06.03.2013 | Designation fee(s) paid | 06.03.2013 | Examination fee paid | Examination procedure | 06.03.2013 | Examination requested [2013/24] | 14.10.2014 | Amendment by applicant (claims and/or description) | 01.07.2016 | Despatch of a communication from the examining division (Time limit: M04) | 27.10.2016 | Reply to a communication from the examining division | 16.12.2016 | Despatch of a communication from the examining division (Time limit: M04) | 13.04.2017 | Reply to a communication from the examining division | 12.02.2018 | Communication of intention to grant the patent | 14.06.2018 | Fee for grant paid | 14.06.2018 | Fee for publishing/printing paid | 14.06.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 01.07.2016 | Opposition(s) | 16.05.2019 | No opposition filed within time limit [2019/30] | Fees paid | Renewal fee | 06.03.2013 | Renewal fee patent year 03 | 23.05.2014 | Renewal fee patent year 04 | 27.05.2015 | Renewal fee patent year 05 | 24.05.2016 | Renewal fee patent year 06 | 19.05.2017 | Renewal fee patent year 07 | 25.05.2018 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.05.2011 | AL | 15.08.2018 | AT | 15.08.2018 | CY | 15.08.2018 | CZ | 15.08.2018 | DK | 15.08.2018 | EE | 15.08.2018 | ES | 15.08.2018 | FI | 15.08.2018 | HR | 15.08.2018 | LT | 15.08.2018 | LV | 15.08.2018 | MC | 15.08.2018 | MK | 15.08.2018 | MT | 15.08.2018 | NL | 15.08.2018 | RO | 15.08.2018 | RS | 15.08.2018 | SE | 15.08.2018 | SI | 15.08.2018 | SK | 15.08.2018 | SM | 15.08.2018 | TR | 15.08.2018 | BG | 15.11.2018 | NO | 15.11.2018 | GR | 16.11.2018 | IS | 15.12.2018 | PT | 15.12.2018 | [2022/31] |
Former [2021/34] | HU | 16.05.2011 | |
AL | 15.08.2018 | ||
AT | 15.08.2018 | ||
CY | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
MT | 15.08.2018 | ||
NL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
TR | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
PT | 15.12.2018 | ||
Former [2021/32] | HU | 16.05.2011 | |
AL | 15.08.2018 | ||
AT | 15.08.2018 | ||
CY | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
NL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
TR | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
PT | 15.12.2018 | ||
Former [2021/26] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CY | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
NL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
TR | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
PT | 15.12.2018 | ||
Former [2020/29] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
NL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
TR | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
PT | 15.12.2018 | ||
Former [2020/16] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
NL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
TR | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2020/07] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
NL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/37] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
NL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/26] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
NL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/23] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
NL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SK | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/22] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
NL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/12] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
NL | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/11] | AT | 15.08.2018 | |
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
LT | 15.08.2018 | ||
NL | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/10] | AT | 15.08.2018 | |
FI | 15.08.2018 | ||
LT | 15.08.2018 | ||
NL | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/09] | FI | 15.08.2018 | |
LT | 15.08.2018 | ||
NL | 15.08.2018 | ||
NO | 15.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/08] | FI | 15.08.2018 | |
LT | 15.08.2018 | ||
NO | 15.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/07] | LT | 15.08.2018 | Documents cited: | Search | [I]DE6937751U (SIEMENS AG [DE]) [I] 1-8 * figures 1, 2 * * the whole document *; | [I]EP1139543 (MINEBEA CO LTD [JP]) [I] 1 * figures 5, 6 * * paragraphs [0035] - [0037] - [ 0047] , [ 0060] *; | [I]US2766436 (LUEBKING WALTER C) [I] 1 * figure 3 * * the whole document *; | [A]DE9003672U (VEB ELEKTROWÄRME SÖRNEWITZ) [A] 1-8 * figures 1, 2 * * the whole document *; | [A]JP2000114905 (DENSEI LAMBDA KK) [A] 1-8 * figures 1-3 *; | [A]US5912517 (NISHIMURA KIYOSHI [JP], et al) [A] 1 * figure 1 * * column 3, line 24 - column 4, line 17 *; | [A]US4164971 (STRAND NORMAN S) [A] 5,6 * figure 1 * * abstract *; | [A]CN101436461 (SHANGHAI ZHIXING ELECTRIC CO L [CN]) [A] 7,8 * figures 1, 2 * | International search | [A]JP2002217046 (TDK CORP); | [A]JP2005286066 (TAMURA SEISAKUSHO KK, et al); | [X]CN101071909 (SHANGHAI TABUCHI TRANSFORMER C [CN]); | [Y]CN101436461 (SHANGHAI ZHIXING ELECTRIC CO L [CN]); | [XP]CN101916920 (TRAFTOR TECHNOLOGY SHENZHEN CO LTD) | Examination | JP2002217046 |