blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2608821

EP2608821 - IV PUMP AND CASSETTE SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  30.04.2021
Database last updated on 15.06.2024
FormerThe patent has been granted
Status updated on  22.05.2020
FormerGrant of patent is intended
Status updated on  09.01.2020
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
CareFusion 303, Inc.
3750 Torrey View Court
San Diego, CA 92130 / US
[2020/26]
Former [2013/27]For all designated states
CareFusion 303, Inc.
3750 Torrey View Court
San Diego, CA 92130 / US
Inventor(s)01 / ABAL, Daniel
16282 Deer Ridge Road
San Diego California 92127 / US
 [2013/27]
Representative(s)Epping - Hermann - Fischer
Patentanwaltsgesellschaft mbH
Postfach 20 07 34
80007 München / DE
[2020/26]
Former [2013/27]Richards, John, et al
Ladas & Parry LLP Dachauerstrasse 37
80335 München / DE
Application number, filing date11820475.922.08.2011
[2020/26]
WO2011US48685
Priority number, dateUS2010086961226.08.2010         Original published format: US 869612
[2013/27]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report
No.:WO2012027296
Date:01.03.2012
Language:EN
[2012/09]
Type: A2 Application without search report 
No.:EP2608821
Date:03.07.2013
Language:EN
The application published by WIPO in one of the EPO official languages on 01.03.2012 takes the place of the publication of the European patent application.
[2013/27]
Type: B1 Patent specification 
No.:EP2608821
Date:24.06.2020
Language:EN
[2020/26]
Search report(s)International search report - published on:KR10.05.2012
(Supplementary) European search report - dispatched on:EP07.01.2014
ClassificationIPC:A61M5/142, A61M5/168, A61M39/22, F04C5/00
[2013/27]
CPC:
A61M5/1422 (EP,US); A61M5/142 (KR); A61M39/22 (KR);
A61M5/1413 (EP,US); A61M5/14216 (EP,US); A61M5/168 (KR);
F04C5/00 (KR); A61M2205/12 (EP,US); A61M2205/128 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2013/27]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:IV-PUMPE UND KASSETTENSYSTEM DAFÜR[2013/27]
English:IV PUMP AND CASSETTE SYSTEM[2013/27]
French:SYSTÈME CASSETTE ET POMPE À PERFUSION[2013/27]
Entry into regional phase21.03.2013National basic fee paid 
21.03.2013Search fee paid 
21.03.2013Designation fee(s) paid 
21.03.2013Examination fee paid 
Examination procedure21.03.2013Examination requested  [2013/27]
24.07.2014Amendment by applicant (claims and/or description)
10.01.2020Communication of intention to grant the patent
14.05.2020Fee for grant paid
14.05.2020Fee for publishing/printing paid
14.05.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  10.01.2020
Opposition(s)25.03.2021No opposition filed within time limit [2021/22]
Fees paidRenewal fee
19.08.2013Renewal fee patent year 03
13.08.2014Renewal fee patent year 04
10.08.2015Renewal fee patent year 05
24.08.2016Renewal fee patent year 06
23.08.2017Renewal fee patent year 07
23.08.2018Renewal fee patent year 08
20.08.2019Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU22.08.2011
AL24.06.2020
AT24.06.2020
CY24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
ES24.06.2020
FI24.06.2020
HR24.06.2020
IT24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
MK24.06.2020
MT24.06.2020
NL24.06.2020
PL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SI24.06.2020
SK24.06.2020
SM24.06.2020
TR24.06.2020
IE22.08.2020
LU22.08.2020
FR24.08.2020
BE31.08.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
[2022/32]
Former [2022/27]HU22.08.2011
AL24.06.2020
AT24.06.2020
CY24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
ES24.06.2020
FI24.06.2020
HR24.06.2020
IT24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
MT24.06.2020
NL24.06.2020
PL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SI24.06.2020
SK24.06.2020
SM24.06.2020
TR24.06.2020
IE22.08.2020
LU22.08.2020
FR24.08.2020
BE31.08.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
Former [2022/26]AL24.06.2020
AT24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
ES24.06.2020
FI24.06.2020
HR24.06.2020
IT24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
NL24.06.2020
PL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SI24.06.2020
SK24.06.2020
SM24.06.2020
TR24.06.2020
IE22.08.2020
LU22.08.2020
FR24.08.2020
BE31.08.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
Former [2021/37]AL24.06.2020
AT24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
ES24.06.2020
FI24.06.2020
HR24.06.2020
IT24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
NL24.06.2020
PL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SI24.06.2020
SK24.06.2020
SM24.06.2020
IE22.08.2020
LU22.08.2020
FR24.08.2020
BE31.08.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
Former [2021/36]AL24.06.2020
AT24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
ES24.06.2020
FI24.06.2020
HR24.06.2020
IT24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
NL24.06.2020
PL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SI24.06.2020
SK24.06.2020
SM24.06.2020
LU22.08.2020
FR24.08.2020
BE31.08.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
Former [2021/35]AL24.06.2020
AT24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
ES24.06.2020
FI24.06.2020
HR24.06.2020
IT24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
NL24.06.2020
PL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SK24.06.2020
SM24.06.2020
LU22.08.2020
FR24.08.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
Former [2021/20]AL24.06.2020
AT24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
ES24.06.2020
FI24.06.2020
HR24.06.2020
IT24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
NL24.06.2020
PL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SK24.06.2020
SM24.06.2020
LU22.08.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
Former [2021/18]AL24.06.2020
AT24.06.2020
CZ24.06.2020
EE24.06.2020
ES24.06.2020
FI24.06.2020
HR24.06.2020
IT24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
NL24.06.2020
PL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SK24.06.2020
SM24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
Former [2021/10]AL24.06.2020
AT24.06.2020
CZ24.06.2020
EE24.06.2020
ES24.06.2020
FI24.06.2020
HR24.06.2020
IT24.06.2020
LT24.06.2020
LV24.06.2020
NL24.06.2020
PL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SK24.06.2020
SM24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
Former [2021/09]AL24.06.2020
AT24.06.2020
CZ24.06.2020
EE24.06.2020
ES24.06.2020
FI24.06.2020
HR24.06.2020
IT24.06.2020
LT24.06.2020
LV24.06.2020
NL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SM24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
PT26.10.2020
Former [2021/04]AL24.06.2020
FI24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
NL24.06.2020
RS24.06.2020
SE24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
Former [2021/01]FI24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
RS24.06.2020
SE24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
Former [2020/51]FI24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
RS24.06.2020
SE24.06.2020
NO24.09.2020
GR25.09.2020
Former [2020/50]FI24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
SE24.06.2020
NO24.09.2020
GR25.09.2020
Former [2020/48]FI24.06.2020
LT24.06.2020
SE24.06.2020
NO24.09.2020
Former [2020/47]LT24.06.2020
NO24.09.2020
Documents cited:Search[XA]US4838860  (GROSHONG LEROY E [US], et al) [X] 1-7,13-15 * column 5 - column 6 * [A] 8-12;
 [A]EP1634612  (S I A S S P A [IT]) [A] 1-15* the whole document *
International search[A]US4840542  (ABBOTT MARTYN S [US]);
 [Y]US5884590  (MINCULESCU MIHAI C [US]);
 [A]JP2008038885  (TAKEUCHI TETSUZO);
 [Y]KR100917320B  (PARK)
by applicantUS4838860
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.