blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2612142

EP2612142 - METHOD AND APPARATUS FOR THE CONTROL OF A FLOTATION SEPARATION PROCESS, INCLUDING PARAMETERS OF THE FLOTATION PROCESS AND REAGENT ADDITION TO OPTIMIZE MINERAL RECOVERY [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  31.12.2021
Database last updated on 09.07.2024
FormerThe patent has been granted
Status updated on  22.01.2021
FormerGrant of patent is intended
Status updated on  01.10.2020
FormerExamination is in progress
Status updated on  05.07.2019
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024 [2024/29]
Applicant(s)For all designated states
Cidra Corporate Services, Inc.
50 Barnes Park North
Wallingford, CT 06492 / US
[2013/28]
Inventor(s)01 / ROTHMAN, Paul, Joseph
162 Carriage Way
Windsor, CT 06095 / US
02 / O'KEEFE, Christian, Victor
58 Canterbury Drive
Durham, CT 06422 / US
 [2013/28]
Representative(s)Schmitt-Nilson Schraud Waibel Wohlfrom Patentanwälte Partnerschaft mbB
Pelkovenstraße 143
80992 München / DE
[2021/08]
Former [2013/28]Klunker, Hans-Friedrich
Klunker Schmitt-Nilson Hirsch Patentanwälte Destouchesstrasse 68
80796 München / DE
Application number, filing date11822771.906.09.2011
[2021/08]
WO2011US50500
Priority number, dateUS20100379899P03.09.2010         Original published format: US 379899 P
[2013/28]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report
No.:WO2012031290
Date:08.03.2012
Language:EN
[2012/10]
Type: A2 Application without search report 
No.:EP2612142
Date:10.07.2013
Language:EN
The application published by WIPO in one of the EPO official languages on 08.03.2012 takes the place of the publication of the European patent application.
[2013/28]
Type: B1 Patent specification 
No.:EP2612142
Date:24.02.2021
Language:EN
[2021/08]
Search report(s)International search report - published on:US26.04.2012
(Supplementary) European search report - dispatched on:EP20.12.2017
ClassificationIPC:B03D1/02
[2020/38]
CPC:
B03D1/028 (EP,US); G05B19/401 (US); B07C5/34 (US);
G05B2219/37583 (US)
Former IPC [2013/28]G01N29/28
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2013/28]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:VERFAHREN UND VORRICHTUNG ZUR STEUERUNG EINES FLOTATIONSTRENNUNGSVERFAHRENS EINSCHLIESSLICH PARAMETERN FÜR DAS FLOTATIONSTRENNUNGSVERFAHREN UND REAGENZIENZUFÜGUNG FÜR OPTIMIERTE MINERALGEWINNUNG[2013/28]
English:METHOD AND APPARATUS FOR THE CONTROL OF A FLOTATION SEPARATION PROCESS, INCLUDING PARAMETERS OF THE FLOTATION PROCESS AND REAGENT ADDITION TO OPTIMIZE MINERAL RECOVERY[2013/28]
French:PROCÉDÉ ET APPAREIL POUR LA COMMANDE D'UN PROCÉDÉ DE SÉPARATION PAR FLOTTATION, COMPRENANT DES PARAMÈTRES DU PROCÉDÉ DE FLOTTATION ET L'AJOUT D'UN RÉACTIF AFIN D'OPTIMISER LA RÉCUPÉRATION MINÉRALE[2013/28]
Entry into regional phase02.04.2013National basic fee paid 
02.04.2013Search fee paid 
02.04.2013Designation fee(s) paid 
02.04.2013Examination fee paid 
Examination procedure02.04.2013Examination requested  [2013/28]
06.07.2018Amendment by applicant (claims and/or description)
10.07.2019Despatch of a communication from the examining division (Time limit: M06)
15.01.2020Reply to a communication from the examining division
02.10.2020Communication of intention to grant the patent
11.01.2021Fee for grant paid
11.01.2021Fee for publishing/printing paid
12.01.2021Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  10.07.2019
Opposition(s)25.11.2021No opposition filed within time limit [2022/05]
Fees paidRenewal fee
26.09.2013Renewal fee patent year 03
24.09.2014Renewal fee patent year 04
28.09.2015Renewal fee patent year 05
27.09.2016Renewal fee patent year 06
27.09.2017Renewal fee patent year 07
28.09.2018Renewal fee patent year 08
25.09.2019Renewal fee patent year 09
28.09.2020Renewal fee patent year 10
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU06.09.2011
AL24.02.2021
AT24.02.2021
CY24.02.2021
CZ24.02.2021
EE24.02.2021
ES24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
MK24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
TR24.02.2021
BG24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
GB06.09.2021
IE06.09.2021
LU06.09.2021
BE30.09.2021
CH30.09.2021
FR30.09.2021
LI30.09.2021
[2024/29]
Former [2024/22]HU06.09.2011
AL24.02.2021
AT24.02.2021
CY24.02.2021
CZ24.02.2021
EE24.02.2021
ES24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
MK24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
GB06.09.2021
IE06.09.2021
LU06.09.2021
BE30.09.2021
CH30.09.2021
FR30.09.2021
LI30.09.2021
Former [2023/29]HU06.09.2011
AL24.02.2021
AT24.02.2021
CY24.02.2021
CZ24.02.2021
EE24.02.2021
ES24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
GB06.09.2021
IE06.09.2021
LU06.09.2021
BE30.09.2021
CH30.09.2021
FR30.09.2021
LI30.09.2021
Former [2023/24]AL24.02.2021
AT24.02.2021
CY24.02.2021
CZ24.02.2021
EE24.02.2021
ES24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
GB06.09.2021
IE06.09.2021
LU06.09.2021
BE30.09.2021
CH30.09.2021
FR30.09.2021
LI30.09.2021
Former [2022/37]AL24.02.2021
AT24.02.2021
CZ24.02.2021
EE24.02.2021
ES24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
GB06.09.2021
IE06.09.2021
LU06.09.2021
BE30.09.2021
CH30.09.2021
FR30.09.2021
LI30.09.2021
Former [2022/35]AL24.02.2021
AT24.02.2021
CZ24.02.2021
EE24.02.2021
ES24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
GB06.09.2021
IE06.09.2021
LU06.09.2021
BE30.09.2021
FR30.09.2021
Former [2022/34]AL24.02.2021
AT24.02.2021
CZ24.02.2021
EE24.02.2021
ES24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
LU06.09.2021
BE30.09.2021
FR30.09.2021
Former [2022/25]AL24.02.2021
AT24.02.2021
CZ24.02.2021
EE24.02.2021
ES24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2022/23]AL24.02.2021
AT24.02.2021
CZ24.02.2021
EE24.02.2021
ES24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2022/13]AL24.02.2021
AT24.02.2021
CZ24.02.2021
EE24.02.2021
ES24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
GR25.05.2021
PT24.06.2021
Former [2022/10]AL24.02.2021
AT24.02.2021
CZ24.02.2021
EE24.02.2021
ES24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
GR25.05.2021
PT24.06.2021
Former [2022/07]AL24.02.2021
AT24.02.2021
CZ24.02.2021
EE24.02.2021
ES24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/51]AT24.02.2021
CZ24.02.2021
EE24.02.2021
ES24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/50]AT24.02.2021
CZ24.02.2021
EE24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/48]AT24.02.2021
CZ24.02.2021
EE24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RS24.02.2021
SM24.02.2021
BG24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/46]AT24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RS24.02.2021
SM24.02.2021
BG24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/42]HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RS24.02.2021
BG24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/39]HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RS24.02.2021
BG24.05.2021
GR25.05.2021
PT24.06.2021
Former [2021/38]HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
RS24.02.2021
BG24.05.2021
GR25.05.2021
PT24.06.2021
Former [2021/37]HR24.02.2021
LT24.02.2021
LV24.02.2021
RS24.02.2021
BG24.05.2021
GR25.05.2021
PT24.06.2021
Former [2021/36]HR24.02.2021
LT24.02.2021
BG24.05.2021
GR25.05.2021
PT24.06.2021
Former [2021/35]HR24.02.2021
LT24.02.2021
PT24.06.2021
Former [2021/33]LT24.02.2021
PT24.06.2021
Documents cited:Search[X]WO2005098377  (TRIBO FLOW SEPARATIONS LLC [US], et al) [X] 1-5,8-12,15-17 * page 10 - page 11; figure 4a *;
 [IY]DE102006038208  (SIEMENS AG [DE]) [I] 1-5,8-12,15 * paragraphs [0007] , [0016] - paragraph [0017] * [Y] 13;
 [XY]WO2008061289  (UNIV QUEENSLAND [AU], et al) [X] 1-5,8-12,15-17 * page 8 - page 29; claim 21 * [Y] 13;
 [X]US7426852  (ROTHMAN PAUL [US]) [X] 1-5,8-12,14-17* column 8 - column 10 *;
 [XI]  - VANEGAS C ET AL, "On-line froth acoustic emission measurements in industrial sites", MINERALS ENGINEERING, PERGAMON PRESS , OXFORD, GB, vol. 21, no. 12-14, doi:10.1016/J.MINENG.2008.04.007, ISSN 0892-6875, (20081101), pages 883 - 888, (20080602), XP025479052 [X] 16,17 * page 883 - page 885 * [I] 1-5,8-12,15

DOI:   http://dx.doi.org/10.1016/j.mineng.2008.04.007
International search[A]US3434596  (KNAUS OLEG MIKCHAILOVICH);
 [Y]US5073253  (BISHOP MARSHALL D [US]);
 [A]US5687609  (SCHMALZEL MICHAEL O [US]);
 [Y]US7426852  (ROTHMAN PAUL [US])
by applicantWO2005098377
 DE102006038208
 WO2008061289
 US7426852
    - "On-line froth acoustic emission measurements in industrial sites", VANEGAS C et al., Minerals Engineering, Pergamon Press, (20081101), vol. 21, pages 883 - 888
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.