EP2619953 - A CONTROL APPARATUS, A COMMUNICATION SYSTEM, A COMMUNICATION METHOD AND A RECORDING MEDIUM HAVING RECORDED THEREON A COMMUNICATION PROGRAM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.11.2018 Database last updated on 13.07.2024 | |
Former | The patent has been granted Status updated on 24.11.2017 | ||
Former | Grant of patent is intended Status updated on 16.07.2017 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states NEC Corporation 7-1, Shiba 5-chome Minato-ku Tokyo 108-8001 / JP | [2013/31] | Inventor(s) | 01 /
AKIYOSHI, Ippei c/o NEC CORPORATION 7-1 Shiba 5-chome Minato-ku Tokyo 108-8001 / JP | [2013/31] | Representative(s) | Reeve, Nicholas Edward Reddie & Grose LLP The White Chapel Building 10 Whitechapel High Street London E1 8QS / GB | [2017/52] |
Former [2013/31] | Reeve, Nicholas Edward Reddie & Grose LLP 16 Theobalds Road London WC1X 8PL / GB | Application number, filing date | 11826622.0 | 23.06.2011 | [2017/52] | WO2011JP64991 | Priority number, date | JP20100212477 | 22.09.2010 Original published format: JP 2010212477 | [2013/31] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2012039176 | Date: | 29.03.2012 | Language: | EN | [2012/13] | Type: | A1 Application with search report | No.: | EP2619953 | Date: | 31.07.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 29.03.2012 takes the place of the publication of the European patent application. | [2013/31] | Type: | B1 Patent specification | No.: | EP2619953 | Date: | 27.12.2017 | Language: | EN | [2017/52] | Search report(s) | International search report - published on: | JP | 29.03.2012 | (Supplementary) European search report - dispatched on: | EP | 08.11.2016 | Classification | IPC: | H04L12/70, H04M3/00, H04L12/717, H04L12/715, H04L12/751 | [2016/49] | CPC: |
H04L45/04 (EP,US);
H04L45/02 (US);
H04L45/036 (EP);
H04L45/42 (EP,US)
|
Former IPC [2013/31] | H04L12/56, H04M3/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/31] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | STEUERVORRICHTUNG, KOMMUNIKATIONSSYSTEM, KOMMUNIKATIONSVERFAHREN UND AUFZEICHNUNGSMEDIUM MIT EINEM DARAUF AUFGEZEICHNETEN KOMMUNIKATIONSPROGRAMM | [2013/31] | English: | A CONTROL APPARATUS, A COMMUNICATION SYSTEM, A COMMUNICATION METHOD AND A RECORDING MEDIUM HAVING RECORDED THEREON A COMMUNICATION PROGRAM | [2013/31] | French: | APPAREIL DE COMMANDE, SYSTÈME DE COMMUNICATION, PROCÉDÉ DE COMMUNICATION ET SUPPORT D'ENREGISTREMENT SUR LEQUEL EST ENREGISTRÉ UN PROGRAMME DE COMMUNICATION | [2013/31] | Entry into regional phase | 22.03.2013 | National basic fee paid | 22.03.2013 | Search fee paid | 22.03.2013 | Designation fee(s) paid | 22.03.2013 | Examination fee paid | Examination procedure | 22.03.2013 | Examination requested [2013/31] | 05.06.2017 | Amendment by applicant (claims and/or description) | 17.07.2017 | Communication of intention to grant the patent | 14.11.2017 | Fee for grant paid | 14.11.2017 | Fee for publishing/printing paid | 14.11.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 17.07.2017 | Opposition(s) | 28.09.2018 | No opposition filed within time limit [2018/49] | Fees paid | Renewal fee | 04.04.2013 | Renewal fee patent year 03 | 25.06.2014 | Renewal fee patent year 04 | 26.06.2015 | Renewal fee patent year 05 | 29.06.2016 | Renewal fee patent year 06 | 16.06.2017 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.06.2011 | AL | 27.12.2017 | AT | 27.12.2017 | CY | 27.12.2017 | CZ | 27.12.2017 | DK | 27.12.2017 | EE | 27.12.2017 | ES | 27.12.2017 | FI | 27.12.2017 | HR | 27.12.2017 | IT | 27.12.2017 | LT | 27.12.2017 | LV | 27.12.2017 | MC | 27.12.2017 | MK | 27.12.2017 | NL | 27.12.2017 | PL | 27.12.2017 | PT | 27.12.2017 | RO | 27.12.2017 | RS | 27.12.2017 | SE | 27.12.2017 | SI | 27.12.2017 | SK | 27.12.2017 | SM | 27.12.2017 | TR | 27.12.2017 | BG | 27.03.2018 | NO | 27.03.2018 | GR | 28.03.2018 | IS | 27.04.2018 | GB | 23.06.2018 | IE | 23.06.2018 | LU | 23.06.2018 | MT | 23.06.2018 | BE | 30.06.2018 | CH | 30.06.2018 | FR | 30.06.2018 | LI | 30.06.2018 | [2020/33] |
Former [2020/31] | HU | 23.06.2011 | |
AT | 27.12.2017 | ||
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
MK | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
PT | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SE | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
TR | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
GB | 23.06.2018 | ||
IE | 23.06.2018 | ||
LU | 23.06.2018 | ||
MT | 23.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
FR | 30.06.2018 | ||
LI | 30.06.2018 | ||
Former [2020/29] | HU | 23.06.2011 | |
AT | 27.12.2017 | ||
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
PT | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SE | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
TR | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
GB | 23.06.2018 | ||
IE | 23.06.2018 | ||
LU | 23.06.2018 | ||
MT | 23.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
FR | 30.06.2018 | ||
LI | 30.06.2018 | ||
Former [2020/27] | HU | 23.06.2011 | |
AT | 27.12.2017 | ||
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
PT | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
TR | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
GB | 23.06.2018 | ||
IE | 23.06.2018 | ||
LU | 23.06.2018 | ||
MT | 23.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
FR | 30.06.2018 | ||
LI | 30.06.2018 | ||
Former [2020/16] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
TR | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
GB | 23.06.2018 | ||
IE | 23.06.2018 | ||
LU | 23.06.2018 | ||
MT | 23.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
FR | 30.06.2018 | ||
LI | 30.06.2018 | ||
Former [2020/08] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
GB | 23.06.2018 | ||
IE | 23.06.2018 | ||
LU | 23.06.2018 | ||
MT | 23.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
FR | 30.06.2018 | ||
LI | 30.06.2018 | ||
Former [2019/23] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
GB | 23.06.2018 | ||
IE | 23.06.2018 | ||
LU | 23.06.2018 | ||
BE | 30.06.2018 | ||
CH | 30.06.2018 | ||
FR | 30.06.2018 | ||
LI | 30.06.2018 | ||
Former [2019/21] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
GB | 23.06.2018 | ||
IE | 23.06.2018 | ||
LU | 23.06.2018 | ||
CH | 30.06.2018 | ||
LI | 30.06.2018 | ||
Former [2019/19] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
IE | 23.06.2018 | ||
LU | 23.06.2018 | ||
Former [2019/17] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
LU | 23.06.2018 | ||
Former [2019/15] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
MC | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2019/13] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SI | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2018/51] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
DK | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2018/40] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RO | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2018/39] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
IT | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2018/38] | AT | 27.12.2017 | |
CY | 27.12.2017 | ||
CZ | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
IS | 27.04.2018 | ||
Former [2018/37] | CY | 27.12.2017 | |
CZ | 27.12.2017 | ||
EE | 27.12.2017 | ||
ES | 27.12.2017 | ||
FI | 27.12.2017 | ||
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
NL | 27.12.2017 | ||
PL | 27.12.2017 | ||
RS | 27.12.2017 | ||
SK | 27.12.2017 | ||
SM | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
Former [2018/34] | FI | 27.12.2017 | |
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
NL | 27.12.2017 | ||
RS | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
Former [2018/25] | FI | 27.12.2017 | |
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
LV | 27.12.2017 | ||
RS | 27.12.2017 | ||
BG | 27.03.2018 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
Former [2018/23] | FI | 27.12.2017 | |
HR | 27.12.2017 | ||
LT | 27.12.2017 | ||
RS | 27.12.2017 | ||
NO | 27.03.2018 | ||
GR | 28.03.2018 | ||
Former [2018/22] | FI | 27.12.2017 | |
LT | 27.12.2017 | ||
NO | 27.03.2018 | Documents cited: | Search | [A]US2002126667 (OGUCHI NAOKI [JP]) [A] 1-25 * abstract ** paragraph [0054] - paragraph [0111] *; | [X]US2005111465 (STEWART MARK ANDREW W [AU]) [X] 1-25 * abstract * * paragraph [0053] - paragraph [0079]; figures 4,5 *; | [A]US2006029076 (NAMIHIRA DAISUKE [JP], et al) [A] 1-25 * abstract * * paragraph [0019] - paragraph [0051] * * paragraph [0075] - paragraph [0080] * * paragraph [0197] - paragraph [0252]; figures 1-24; claims 1-22 *; | [X]WO2010090182 (NEC CORP [JP], et al) [X] 1-25 * abstract *; | EP2395712 [ ] (NEC CORP [JP]) [ ] * abstract * * paragraph [0142] - paragraph [0175]; figures 1-12; claims 1-33 * | International search | [A]JP2005322107 (FUJITSU LTD); | [X]WO2010090182 (NEC CORP [JP], et al) | by applicant | JP2008219400 | - THE OPENFLOW SWITCH SPECIFICATION VERSION 1.0.0, (20091231), URL: http://www.openflowswitch.org/documents/openflow-spec-v1.0.0.pdf |