blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2625762

EP2625762 - HIGH VOLTAGE ENERGY HARVESTING AND CONVERSION RENEWABLE ENERGY UTILITY SIZE ELECTRIC POWER SYSTEMS AND VISUAL MONITORING AND CONTROL SYSTEMS FOR SAID SYSTEMS [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  24.11.2017
Database last updated on 03.06.2024
FormerExamination is in progress
Status updated on  10.03.2017
Most recent event   Tooltip24.11.2017Application deemed to be withdrawnpublished on 27.12.2017  [2017/52]
Applicant(s)For all designated states
Alencon Acquisition Co., LLC
330 South Warminster Road
Station Park, Suite 380
Hatboro, Pennsylvania 19040 / US
[2013/33]
Inventor(s)01 / FISHMAN, Oleg, S.
1 Saljon Court
Maple Glen Pennsylvania 19002 / US
02 / SCHWABE, Ulrich, K.W.
50 Meadow Lane
Norristown Pennsylvania 19403 / US
 [2013/33]
Representative(s)Ackroyd, Robert
WP Thompson
138 Fetter Lane
London EC4A 1BT / GB
[N/P]
Former [2013/33]Ackroyd, Robert
WP Thompson
55 Drury Lane
London
WC2B 5SQ / GB
Application number, filing date11831527.405.10.2011
WO2011US54943
Priority number, dateUS201161485384P12.05.2011         Original published format: US 201161485384 P
US20100389816P05.10.2010         Original published format: US 389816 P
[2013/33]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report
No.:WO2012048012
Date:12.04.2012
Language:EN
[2012/15]
Type: A2 Application without search report 
No.:EP2625762
Date:14.08.2013
Language:EN
The application published by WIPO in one of the EPO official languages on 12.04.2012 takes the place of the publication of the European patent application.
[2013/33]
Search report(s)International search report - published on:KR14.06.2012
(Supplementary) European search report - dispatched on:EP20.04.2015
ClassificationIPC:H02J3/36, H02J3/38, // H02J1/10
[2015/21]
CPC:
H02J3/46 (EP,US); H02J3/38 (KR); F03D7/04 (KR);
H01L31/02021 (EP,US); H02J3/381 (EP,US); H02J7/35 (KR);
H02J2300/24 (EP,US); H02J2300/28 (EP,US); Y02E10/56 (EP,US);
Y02E10/72 (EP); Y02E10/76 (EP,US) (-)
Former IPC [2013/33]H02J3/38, H02J7/35, F03D7/04
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2013/33]
TitleGerman:HOCHSPANNUNGS-STROMSYSTEME FÜR ENERGIEGEWINNUNG UND -UMWANDLUNG UNTER VERWENDUNG ERNEUERBARER ENERGIE SOWIE SYSTEME ZUR VISUELLEN ÜBERWACHUNG UND STEUERUNGS SOLCHER SYSTEME[2013/33]
English:HIGH VOLTAGE ENERGY HARVESTING AND CONVERSION RENEWABLE ENERGY UTILITY SIZE ELECTRIC POWER SYSTEMS AND VISUAL MONITORING AND CONTROL SYSTEMS FOR SAID SYSTEMS[2013/33]
French:SYSTÈMES DE COURANT ÉLECTRIQUE À COLLECTE D'ÉNERGIE À HAUTE TENSION ET CONVERSION D'ÉNERGIE RENOUVELABLE À TAILLE DE RÉSEAU PUBLIC DE DISTRIBUTION D'ÉLECTRICITÉ ET SYSTÈMES DE SURVEILLANCE VISUELLE ET DE COMMANDE POUR LESDITS SYSTÈMES[2013/33]
Entry into regional phase26.04.2013National basic fee paid 
26.04.2013Search fee paid 
26.04.2013Designation fee(s) paid 
26.04.2013Examination fee paid 
Examination procedure26.04.2013Examination requested  [2013/33]
20.11.2015Amendment by applicant (claims and/or description)
13.03.2017Despatch of a communication from the examining division (Time limit: M04)
25.07.2017Application deemed to be withdrawn, date of legal effect  [2017/52]
18.08.2017Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time  [2017/52]
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  13.03.2017
Fees paidRenewal fee
14.10.2013Renewal fee patent year 03
14.10.2014Renewal fee patent year 04
12.10.2015Renewal fee patent year 05
11.10.2016Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]US6563718  (LI QIONG MICHELLE [US], et al) [A] 1-14 * column 5, line 2 - line 9; figure 4 *;
 [Y]US2005275386  (JEPSEN AKSEL B [DK], et al) [Y] 4,7-9,11,14 * paragraphs [0007] - [0027] - [0 43] - [0045] - [0 52] , [ 112] - [0115]; figures 1,2 *;
 [A]US2008280175  (GURUNATHAN RANGANATHAN [IN], et al) [A] 1-14 * paragraphs [0045] - [0047]; figures 3, 6 *;
 [Y]US2010013317  (BALLANTINE ARNE WATSON [US], et al) [Y] 3 * paragraphs [0020] - [0029]; figure 1 *;
 [AP]US2010301991  (SELLA GUY [IL], et al) [AP] 1-14* paragraphs [0072] - [0133] *;
 [XP]EP2276137  (KOSTAL IND ELEKTRIK GMBH [DE]) [XP] 1,13 * paragraphs [0021] - [0025] - [0 35] - [0041]; figures 1, 3 *;
 [XPY]WO2011033308  (NAT RENEWABLE ENERGY CT LTD [GB], et al) [XP] 1,2,5,6,10,12,13 * pages 4, 10-14; figures 1, 2 * [Y] 3,4,7-9,11,14
International search[Y]US2007217239  (ROTTGER DIETER [DE], et al);
 [A]US7672149  (FALK ANDREAS [DE]);
 [Y]US2010133911  (WILLIAMS BERTRAND JEFFERY [US], et al);
 [A]US2010156188  (FISHMAN OLEG S [US])
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.