EP2624660 - METHOD AND APPARATUS FOR ESTABLISHING NETWORK IN WIRELESS NETWORK [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.07.2019 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 27.07.2018 | ||
Former | Grant of patent is intended Status updated on 05.04.2018 | Most recent event Tooltip | 03.07.2020 | Lapse of the patent in a contracting state New state(s): CY, MK | published on 05.08.2020 [2020/32] | Applicant(s) | For all designated states ZTE Corporation ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan District Shenzhen, Guangdong 518057 / CN | [2018/35] |
Former [2013/32] | For all designated states ZTE Corporation ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan District Shenzhen, Guangdong 518057 / CN | Inventor(s) | 01 /
SUN, Bo ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan Shenzhen Guangdong 518057 / CN | 02 /
LV, Kaiying ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan Shenzhen Guangdong 518057 / CN | 03 /
LI, Nan ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan Shenzhen Guangdong 518057 / CN | 04 /
LI, Feng ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan Shenzhen Guangdong 518057 / CN | 05 /
ZHANG, Li ZTE Plaza Keji Road South Hi-Tech Industrial Park Nanshan Shenzhen Guangdong 518057 / CN | [2013/32] | Representative(s) | J A Kemp LLP 80 Turnmill Street London EC1M 5QU / GB | [N/P] |
Former [2018/35] | J A Kemp 14 South Square Gray's Inn London WC1R 5JJ / GB | ||
Former [2013/32] | Price, Nigel John King J A Kemp 14 South Square Gray's Inn London WC1R 5JJ / GB | Application number, filing date | 11835604.7 | 19.10.2011 | [2018/35] | WO2011CN80986 | Priority number, date | CN201010526382 | 29.10.2010 Original published format: CN201010526382 | [2013/32] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2012055331 | Date: | 03.05.2012 | Language: | ZH | [2012/18] | Type: | A1 Application with search report | No.: | EP2624660 | Date: | 07.08.2013 | Language: | EN | [2013/32] | Type: | B1 Patent specification | No.: | EP2624660 | Date: | 29.08.2018 | Language: | EN | [2018/35] | Search report(s) | International search report - published on: | CN | 03.05.2012 | (Supplementary) European search report - dispatched on: | EP | 28.04.2017 | Classification | IPC: | H04W84/12, H04W16/14, // H04W72/02 | [2017/22] | CPC: |
H04W16/14 (EP,US);
H04W72/04 (US);
H04W84/12 (EP,US);
H04W72/02 (EP,US)
|
Former IPC [2013/32] | H04W84/12 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/32] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR EINRICHTUNG EINES NETZWERKS IN EINEM DRAHTLOSEN NETZWERK | [2013/32] | English: | METHOD AND APPARATUS FOR ESTABLISHING NETWORK IN WIRELESS NETWORK | [2013/32] | French: | PROCÉDÉ ET APPAREIL D'ÉTABLISSEMENT DE RÉSEAU DANS UN RÉSEAU SANS FIL | [2013/32] | Entry into regional phase | 29.04.2013 | Translation filed | 29.04.2013 | National basic fee paid | 29.04.2013 | Search fee paid | 29.04.2013 | Designation fee(s) paid | 29.04.2013 | Examination fee paid | Examination procedure | 29.04.2013 | Examination requested [2013/32] | 24.11.2017 | Amendment by applicant (claims and/or description) | 06.04.2018 | Communication of intention to grant the patent | 17.07.2018 | Fee for grant paid | 17.07.2018 | Fee for publishing/printing paid | 17.07.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 06.04.2018 | Opposition(s) | 31.05.2019 | No opposition filed within time limit [2019/32] | Fees paid | Renewal fee | 02.08.2013 | Renewal fee patent year 03 | 14.10.2014 | Renewal fee patent year 04 | 12.10.2015 | Renewal fee patent year 05 | 28.09.2016 | Renewal fee patent year 06 | 27.10.2017 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.10.2011 | AL | 29.08.2018 | AT | 29.08.2018 | CY | 29.08.2018 | CZ | 29.08.2018 | DK | 29.08.2018 | EE | 29.08.2018 | FI | 29.08.2018 | HR | 29.08.2018 | IT | 29.08.2018 | LT | 29.08.2018 | LV | 29.08.2018 | MC | 29.08.2018 | MK | 29.08.2018 | NL | 29.08.2018 | PL | 29.08.2018 | PT | 29.08.2018 | RO | 29.08.2018 | RS | 29.08.2018 | SE | 29.08.2018 | SI | 29.08.2018 | SK | 29.08.2018 | SM | 29.08.2018 | TR | 29.08.2018 | IE | 19.10.2018 | LU | 19.10.2018 | MT | 19.10.2018 | BE | 31.10.2018 | CH | 31.10.2018 | LI | 31.10.2018 | BG | 29.11.2018 | NO | 29.11.2018 | GR | 30.11.2018 | IS | 29.12.2018 | [2020/31] |
Former [2020/30] | HU | 19.10.2011 | |
AL | 29.08.2018 | ||
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
PT | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
TR | 29.08.2018 | ||
IE | 19.10.2018 | ||
LU | 19.10.2018 | ||
MT | 19.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2020/27] | AL | 29.08.2018 | |
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
PT | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
TR | 29.08.2018 | ||
IE | 19.10.2018 | ||
LU | 19.10.2018 | ||
MT | 19.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2020/17] | AL | 29.08.2018 | |
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
TR | 29.08.2018 | ||
IE | 19.10.2018 | ||
LU | 19.10.2018 | ||
MT | 19.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2020/08] | AL | 29.08.2018 | |
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
IE | 19.10.2018 | ||
LU | 19.10.2018 | ||
MT | 19.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/48] | AL | 29.08.2018 | |
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
IE | 19.10.2018 | ||
LU | 19.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/40] | AL | 29.08.2018 | |
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
LU | 19.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/38] | AL | 29.08.2018 | |
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
LU | 19.10.2018 | ||
BE | 31.10.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/37] | AL | 29.08.2018 | |
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
LU | 19.10.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/30] | AL | 29.08.2018 | |
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
LU | 19.10.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/28] | AL | 29.08.2018 | |
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/26] | AL | 29.08.2018 | |
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
SK | 29.08.2018 | ||
SM | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/23] | AL | 29.08.2018 | |
AT | 29.08.2018 | ||
CZ | 29.08.2018 | ||
EE | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
SK | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/22] | AL | 29.08.2018 | |
CZ | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
NL | 29.08.2018 | ||
PL | 29.08.2018 | ||
RO | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/21] | AL | 29.08.2018 | |
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
NL | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/12] | AL | 29.08.2018 | |
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
NL | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/11] | FI | 29.08.2018 | |
HR | 29.08.2018 | ||
LT | 29.08.2018 | ||
NL | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/10] | FI | 29.08.2018 | |
LT | 29.08.2018 | ||
NL | 29.08.2018 | ||
RS | 29.08.2018 | ||
SE | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/09] | FI | 29.08.2018 | |
LT | 29.08.2018 | ||
NL | 29.08.2018 | ||
NO | 29.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/08] | FI | 29.08.2018 | |
LT | 29.08.2018 | ||
NO | 29.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/07] | LT | 29.08.2018 | Documents cited: | Search | [XY]US2009285116 (NANDA SANJIV [US], et al) [X] 1-3,5,7-10,12,14 * figures 3-5, 7-13 * * paragraph [0010] - paragraph [0012] * * paragraph [0026] - paragraph [0030] * * paragraph [0032] - paragraph [0034] * * paragraph [0036] * * paragraph [0039] - paragraph [0052] * * paragraph [0055] - paragraph [0103] * * paragraph [0105] * * claims 1-15 * [Y] 4,6,11,13; | [XY]WO2010002183 (LG ELECTRONICS INC [KR], et al) [X] 1,8 * figures 1-11 * * paragraph [0009] - paragraph [0013] * * paragraph [0027] - paragraph [0045] * * paragraph [0047] - paragraph [0074] * * claims 1-14 * [Y] 4,6,11,13; | [A] - LAURENT CARIOU AND AL (ORANGE LABS), "Fast Session Transfer ; 11-10-0491-02-00ad-fast-session-transfer", IEEE DRAFT; 11-10-0491-02-00AD-FAST-SESSION-TRANSFER, IEEE-SA MENTOR, PISCATAWAY, NJ USA, (20100518), vol. 802.11ad, no. 2, pages 1 - 19, XP017677067 [A] 1-14 * slides 2-19 * | International search | [A]CN1675954 (KONINKL PHILIPS ELECTRONICS NV [NL]); | [X]CN1787472 (LG ELECTRONICS INC [KR]); | [X]CN1881917 (HAIER GROUP [CN]); | [A]CN101015172 (INTEL CORP [US]) |