blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2634467

EP2634467 - TUBE SUPPORT STRUCTURE FOR AIRCRAFT [Right-click to bookmark this link]
Former [2013/36]PIPE SUPPORT STRUCTURE FOR AIRCRAFT
[2019/23]
StatusNo opposition filed within time limit
Status updated on  02.10.2020
Database last updated on 03.06.2024
FormerThe patent has been granted
Status updated on  25.10.2019
FormerGrant of patent is intended
Status updated on  02.06.2019
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Mitsubishi Heavy Industries, Ltd.
16-5, Konan 2-chome Minato-ku
Tokyo 108-8215 / JP
[2013/36]
Inventor(s)01 / MINAMI Keisuke
c/o MITSUBISHI HEAVY INDUSTRIES LTD.
16-5 Konan 2-chome
Minato-ku
Tokyo 108-8215 / JP
 [2013/36]
Representative(s)Henkel & Partner mbB
Patentanwaltskanzlei, Rechtsanwaltskanzlei
Maximiliansplatz 21
80333 München / DE
[2019/48]
Former [2013/36]Henkel, Breuer & Partner
Patentanwälte
Maximiliansplatz 21
80333 München / DE
Application number, filing date11836173.221.10.2011
[2019/48]
WO2011JP74342
Priority number, dateJP2010023996126.10.2010         Original published format: JP 2010239961
[2013/36]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2012057039
Date:03.05.2012
Language:JA
[2012/18]
Type: A1 Application with search report 
No.:EP2634467
Date:04.09.2013
Language:EN
[2013/36]
Type: B1 Patent specification 
No.:EP2634467
Date:27.11.2019
Language:EN
[2019/48]
Search report(s)International search report - published on:JP03.05.2012
(Supplementary) European search report - dispatched on:EP28.04.2017
ClassificationIPC:F16L3/16, B64C3/34, B64D37/32, F16L5/00, B64D37/00, F16M11/10, F16L3/10, F16L5/10, F16L5/02
[2019/23]
CPC:
B64D37/005 (EP,US); F16L3/1222 (US); F16L3/1091 (EP,US);
F16L3/16 (EP,US); F16L5/025 (EP); F16L5/10 (EP,US);
F16L3/10 (US); F16L3/1008 (US); F16L3/1016 (US);
F16M11/10 (US); Y02T50/40 (EP,US) (-)
Former IPC [2017/22]F16L3/16, B64C3/34, B64D37/32, F16L5/00, B64D37/00, F16M11/10, F16L3/10, F16L5/10
Former IPC [2013/36]F16L3/16, B64C3/34, B64D37/32, F16L5/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2013/36]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:SCHLAUCHTRÄGERSTRUKTUR FÜR FLUGZEUGE[2019/23]
English:TUBE SUPPORT STRUCTURE FOR AIRCRAFT[2019/23]
French:STRUCTURE DE SUPPORT DE TUBE POUR AVION[2019/23]
Former [2013/36]ROHRTRÄGERSTRUKTUR FÜR FLUGZEUGE
Former [2013/36]PIPE SUPPORT STRUCTURE FOR AIRCRAFT
Former [2013/36]STRUCTURE DE SUPPORT DE TUYAU POUR AVION
Entry into regional phase09.04.2013Translation filed 
09.04.2013National basic fee paid 
09.04.2013Search fee paid 
09.04.2013Designation fee(s) paid 
09.04.2013Examination fee paid 
Examination procedure09.04.2013Examination requested  [2013/36]
02.11.2017Amendment by applicant (claims and/or description)
03.06.2019Communication of intention to grant the patent
05.09.2019Fee for grant paid
05.09.2019Fee for publishing/printing paid
05.09.2019Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  03.06.2019
Opposition(s)28.08.2020No opposition filed within time limit [2020/45]
Fees paidRenewal fee
31.10.2013Renewal fee patent year 03
30.10.2014Renewal fee patent year 04
29.10.2015Renewal fee patent year 05
26.10.2016Renewal fee patent year 06
25.10.2017Renewal fee patent year 07
31.10.2018Renewal fee patent year 08
16.10.2019Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU21.10.2011
AL27.11.2019
AT27.11.2019
CY27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
ES27.11.2019
FI27.11.2019
HR27.11.2019
IT27.11.2019
LT27.11.2019
LV27.11.2019
MC27.11.2019
MK27.11.2019
MT27.11.2019
NL27.11.2019
PL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SI27.11.2019
SK27.11.2019
SM27.11.2019
TR27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
PT19.04.2020
[2022/32]
Former [2022/27]HU21.10.2011
AL27.11.2019
AT27.11.2019
CY27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
ES27.11.2019
FI27.11.2019
HR27.11.2019
IT27.11.2019
LT27.11.2019
LV27.11.2019
MC27.11.2019
MT27.11.2019
NL27.11.2019
PL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SI27.11.2019
SK27.11.2019
SM27.11.2019
TR27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
PT19.04.2020
Former [2022/26]AL27.11.2019
AT27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
ES27.11.2019
FI27.11.2019
HR27.11.2019
IT27.11.2019
LT27.11.2019
LV27.11.2019
MC27.11.2019
NL27.11.2019
PL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SI27.11.2019
SK27.11.2019
SM27.11.2019
TR27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
PT19.04.2020
Former [2021/31]AL27.11.2019
AT27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
ES27.11.2019
FI27.11.2019
HR27.11.2019
IT27.11.2019
LT27.11.2019
LV27.11.2019
MC27.11.2019
NL27.11.2019
PL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SI27.11.2019
SK27.11.2019
SM27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
PT19.04.2020
Former [2021/10]AL27.11.2019
AT27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
ES27.11.2019
FI27.11.2019
HR27.11.2019
IT27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
PL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SI27.11.2019
SK27.11.2019
SM27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
PT19.04.2020
Former [2020/51]AL27.11.2019
AT27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
ES27.11.2019
FI27.11.2019
HR27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
PL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SI27.11.2019
SK27.11.2019
SM27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
PT19.04.2020
Former [2020/37]AL27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
ES27.11.2019
FI27.11.2019
HR27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SK27.11.2019
SM27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
PT19.04.2020
Former [2020/36]AL27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
ES27.11.2019
FI27.11.2019
HR27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
PT19.04.2020
Former [2020/35]AL27.11.2019
CZ27.11.2019
ES27.11.2019
FI27.11.2019
HR27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
Former [2020/32]AL27.11.2019
ES27.11.2019
FI27.11.2019
HR27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
RS27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
Former [2020/26]ES27.11.2019
FI27.11.2019
HR27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
RS27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
Former [2020/24]ES27.11.2019
FI27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
Former [2020/23]ES27.11.2019
FI27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
Former [2020/22]FI27.11.2019
LT27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
Former [2020/21]NO27.02.2020
Documents cited:Search[Y]GB566292  (TINNERMAN PRODUCTS INC) [Y] 1-12 * page 1, line 72 - page 4, line 6; figures 6-8 *;
 [Y]JPS588887  (TOKYO SHIBAURA ELECTRIC CO) [Y] 1-12 * abstract *;
 [Y]US4490888  (LEVANT JEAN M [FR]) [Y] 1-12 * column 2, line 10 - column 3; figure - *;
 [Y]JPS6089485U  (HITACHI CABLE, LTD.) [Y] 1-12 * abstract *;
 [A]DE10211212  (BROEKHUIJSEN ANDRIES [DE]) [A] 1-12* the whole document *;
 [A]JP2010126133  (MITSUBISHI HEAVY IND LTD) [A] 1,11,12 * abstract *
International search[Y]JPS54124324  (TOKYO SHIBAURA ELECTRIC CO);
 [Y]JPS588887  (TOKYO SHIBAURA ELECTRIC CO);
 [Y]US4490888  (LEVANT JEAN M [FR]);
 [Y]JPS6089485U  (HITACHI CABLE, LTD.);
 [Y]US4921191  (HERSCHLER WILBERT H [US], et al);
 [Y]JP2010126133  (MITSUBISHI HEAVY IND LTD)
by applicantJPS58200891
 JPH10292817
 JP20100239961
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.