blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2638990

EP2638990 - MANUFACTURING METHOD FOR METAL PARTICLES [Right-click to bookmark this link]
Former [2013/38]METAL PARTICLES AND MANUFACTURING METHOD FOR SAME
[2018/52]
StatusNo opposition filed within time limit
Status updated on  13.03.2020
Database last updated on 28.05.2024
FormerThe patent has been granted
Status updated on  05.04.2019
FormerGrant of patent is intended
Status updated on  13.12.2018
FormerExamination is in progress
Status updated on  16.02.2018
Most recent event   Tooltip01.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 03.08.2022  [2022/31]
Applicant(s)For all designated states
Namics Corporation
3993, Nigorikawa Kita-ku
Niigata-shi, Niigata 950-3131 / JP
[2013/38]
Inventor(s)01 / TAKAHASHI, Tomoyuki
c/o NAMICS CORPORATION
3993, Nigorikawa, Kita-ku
Niigata-shi, Niigata 950-3131 / JP
02 / YOSHII, Akito
c/o NAMICS CORPORATION
3993, Nigorikawa, Kita-ku
Niigata-shi, Niigata 950-3131 / JP
 [2013/38]
Representative(s)Hoffmann Eitle
Patent- und Rechtsanwälte PartmbB
Arabellastraße 30
81925 München / DE
[2019/19]
Former [2013/38]HOFFMANN EITLE
Patent- und Rechtsanwälte
Arabellastrasse 4
81925 München / DE
Application number, filing date11840597.604.11.2011
[2019/19]
WO2011JP75508
Priority number, dateJP2010025025108.11.2010         Original published format: JP 2010250251
[2013/38]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2012063747
Date:18.05.2012
Language:JA
[2012/20]
Type: A1 Application with search report 
No.:EP2638990
Date:18.09.2013
Language:EN
[2013/38]
Type: B1 Patent specification 
No.:EP2638990
Date:08.05.2019
Language:EN
[2019/19]
Search report(s)International search report - published on:JP18.05.2012
(Supplementary) European search report - dispatched on:EP24.05.2017
ClassificationIPC:B22F1/00, B22F3/11, B22F9/24, C22C1/02, C22C5/06, C22C9/00, H01B1/02, H01B1/22, C22C5/02, C22C5/04, C22C19/03
[2018/52]
CPC:
B22F9/24 (EP,KR,US); B22F1/00 (EP,KR,US); B22F1/05 (EP,KR,US);
B22F1/052 (EP,KR,US); B22F3/11 (EP,US); B22F9/18 (US);
C22C1/02 (EP,US); C22C19/03 (EP,US); C22C5/02 (EP,US);
C22C5/04 (EP,US); C22C5/06 (EP,US); C22C9/00 (EP,US);
H01B1/02 (EP,US); H01B1/22 (EP,KR,US); H01B5/00 (KR);
Y10T428/12 (EP,US) (-)
Former IPC [2017/25]B22F1/00, B22F3/11, B22F9/24, C22C1/02, C22C5/06, C22C9/00, H01B1/02, H01B1/22
Former IPC [2013/38]B22F1/00, B22F9/00, B22F9/24, H01B1/22, H01B5/00, H01B13/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2013/38]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:HERSTELLUNGSVERFAHREN FÜR METALLTEILCHEN[2018/52]
English:MANUFACTURING METHOD FOR METAL PARTICLES[2018/52]
French:PROCÉDÉ DE FABRICATION DE PARTICULES MÉTALLIQUES[2018/52]
Former [2013/38]METALLTEILCHEN UND HERSTELLUNGSVERFAHREN DAFÜR
Former [2013/38]METAL PARTICLES AND MANUFACTURING METHOD FOR SAME
Former [2013/38]PARTICULES MÉTALLIQUES ET PROCÉDÉ DE FABRICATION DE CELLES-CI
Entry into regional phase05.06.2013Translation filed 
05.06.2013National basic fee paid 
05.06.2013Search fee paid 
05.06.2013Designation fee(s) paid 
05.06.2013Examination fee paid 
Examination procedure05.06.2013Examination requested  [2013/38]
23.10.2017Amendment by applicant (claims and/or description)
15.02.2018Despatch of a communication from the examining division (Time limit: M04)
19.06.2018Reply to a communication from the examining division
14.12.2018Communication of intention to grant the patent
26.03.2019Fee for grant paid
26.03.2019Fee for publishing/printing paid
26.03.2019Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  15.02.2018
Opposition(s)11.02.2020No opposition filed within time limit [2020/16]
Fees paidRenewal fee
16.11.2013Renewal fee patent year 03
25.11.2014Renewal fee patent year 04
18.11.2015Renewal fee patent year 05
24.11.2016Renewal fee patent year 06
23.11.2017Renewal fee patent year 07
26.11.2018Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU04.11.2011
AL08.05.2019
AT08.05.2019
CY08.05.2019
CZ08.05.2019
DK08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
MC08.05.2019
MK08.05.2019
MT08.05.2019
NL08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
IS08.09.2019
PT08.09.2019
GB04.11.2019
IE04.11.2019
LU04.11.2019
BE30.11.2019
CH30.11.2019
LI30.11.2019
[2022/31]
Former [2021/34]HU04.11.2011
AL08.05.2019
AT08.05.2019
CY08.05.2019
CZ08.05.2019
DK08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
MC08.05.2019
MT08.05.2019
NL08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
IS08.09.2019
PT08.09.2019
GB04.11.2019
IE04.11.2019
LU04.11.2019
BE30.11.2019
CH30.11.2019
LI30.11.2019
Former [2021/32]HU04.11.2011
AL08.05.2019
AT08.05.2019
CY08.05.2019
CZ08.05.2019
DK08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
MC08.05.2019
NL08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
IS08.09.2019
PT08.09.2019
GB04.11.2019
IE04.11.2019
LU04.11.2019
BE30.11.2019
CH30.11.2019
LI30.11.2019
Former [2021/31]AL08.05.2019
AT08.05.2019
CY08.05.2019
CZ08.05.2019
DK08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
MC08.05.2019
NL08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
IS08.09.2019
PT08.09.2019
GB04.11.2019
IE04.11.2019
LU04.11.2019
BE30.11.2019
CH30.11.2019
LI30.11.2019
Former [2021/26]AL08.05.2019
AT08.05.2019
CY08.05.2019
CZ08.05.2019
DK08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
MC08.05.2019
NL08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
GB04.11.2019
IE04.11.2019
LU04.11.2019
BE30.11.2019
CH30.11.2019
LI30.11.2019
Former [2020/51]AL08.05.2019
AT08.05.2019
CZ08.05.2019
DK08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
MC08.05.2019
NL08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
GB04.11.2019
IE04.11.2019
LU04.11.2019
BE30.11.2019
CH30.11.2019
LI30.11.2019
Former [2020/48]AL08.05.2019
AT08.05.2019
CZ08.05.2019
DK08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
MC08.05.2019
NL08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
GB04.11.2019
IE04.11.2019
LU04.11.2019
CH30.11.2019
LI30.11.2019
Former [2020/46]AL08.05.2019
AT08.05.2019
CZ08.05.2019
DK08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
MC08.05.2019
NL08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
IE04.11.2019
LU04.11.2019
CH30.11.2019
LI30.11.2019
Former [2020/36]AL08.05.2019
AT08.05.2019
CZ08.05.2019
DK08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
MC08.05.2019
NL08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
LU04.11.2019
CH30.11.2019
LI30.11.2019
Former [2020/35]AL08.05.2019
AT08.05.2019
CZ08.05.2019
DK08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
NL08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
LU04.11.2019
CH30.11.2019
LI30.11.2019
Former [2020/34]AL08.05.2019
AT08.05.2019
CZ08.05.2019
DK08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
NL08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
CH30.11.2019
LI30.11.2019
Former [2020/25]AL08.05.2019
AT08.05.2019
CZ08.05.2019
DK08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
NL08.05.2019
PL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SI08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
Former [2020/17]AL08.05.2019
AT08.05.2019
CZ08.05.2019
DK08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
NL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SK08.05.2019
SM08.05.2019
TR08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
Former [2020/14]AL08.05.2019
AT08.05.2019
CZ08.05.2019
DK08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
NL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SK08.05.2019
SM08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
Former [2020/12]AL08.05.2019
AT08.05.2019
CZ08.05.2019
DK08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
IT08.05.2019
LT08.05.2019
LV08.05.2019
NL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SK08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
Former [2020/11]AL08.05.2019
AT08.05.2019
CZ08.05.2019
DK08.05.2019
EE08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
LT08.05.2019
LV08.05.2019
NL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
SK08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
Former [2020/10]AL08.05.2019
AT08.05.2019
CZ08.05.2019
DK08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
LT08.05.2019
LV08.05.2019
NL08.05.2019
RO08.05.2019
RS08.05.2019
SE08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
Former [2020/09]AL08.05.2019
CZ08.05.2019
DK08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
LT08.05.2019
LV08.05.2019
NL08.05.2019
RS08.05.2019
SE08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
Former [2019/51]AL08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
LT08.05.2019
LV08.05.2019
NL08.05.2019
RS08.05.2019
SE08.05.2019
BG08.08.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
Former [2019/50]AL08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
LT08.05.2019
LV08.05.2019
NL08.05.2019
RS08.05.2019
SE08.05.2019
NO08.08.2019
GR09.08.2019
PT08.09.2019
Former [2019/49]AL08.05.2019
ES08.05.2019
FI08.05.2019
HR08.05.2019
LT08.05.2019
NL08.05.2019
SE08.05.2019
NO08.08.2019
PT08.09.2019
Former [2019/48]ES08.05.2019
FI08.05.2019
LT08.05.2019
SE08.05.2019
NO08.08.2019
PT08.09.2019
Former [2019/47]ES08.05.2019
FI08.05.2019
LT08.05.2019
NO08.08.2019
Documents cited:Search[XYI]US2005279970  (OGI KOZO [JP], et al) [X] 10-13 * abstract * * paragraphs [0016] - [0033] * [Y] 6-9 [I] 14;
 [XI]US2008138238  (SASAKI TAKUYA [JP], et al) [X] 1-5,15 * abstract * * paragraphs [0018] - [0022] - [0 59] * * table 1 * * figures 2-5 * [I] 6-9;
 [XI]US2010279116  (IRIZARRY ROBERTO [US]) [X] 1-5,15 * abstract * * paragraphs [0005] - [0013] - [0 44] * * claim 1 * * figures 1-4 * [I] 6-9;
 [E]EP2611559  (DU PONT [US]) [E] 1-5,15 * abstract * * page 2, line 16 - line 24 * * page 6, line 32 - page 7, line 2 * * figures 1-2 ** claims 1-20 *;
 [XY]  - WON H I ET AL, "Preparation of porous silver particles using ammonium formate and its formation mechanism", CHEMICAL ENGINEERING JOURNAL, ELSEVIER SEQUOIA, LAUSANNE, CH, vol. 156, no. 2, ISSN 1385-8947, (20100115), pages 459 - 464, (20091031), XP026827917 [X] 1,3-5,15 * abstract * * 2.1 Preparation of Ag particles * * figures 2, 4 * [Y] 6-9
International search[X]JPS5321068  (KOGYO GIJUTSUIN);
 [X]JPH08311659  (NEC CORP);
 [X]JPH11505884  (H.C.STARCK GMBH & CO. KG.);
 [X]JP2001107101  (MITSUI MINING & SMELTING CO);
 [X]JP2006002228  (DOWA MINING CO);
 [X]JP2006097086  (DOWA MINING CO);
 [A]JP2006152344  (CATALYSTS & CHEM IND CO);
 [X]JP2006183092  (SUMITOMO ELECTRIC INDUSTRIES);
 [X]JP2006193795  (DOWA MINING CO);
 [X]JP2007138250  (MITSUBISHI MATERIALS CORP, et al);
 [X]JP2007138249  (MITSUBISHI MATERIALS CORP, et al);
 [X]JP2008115439  (NAT INST OF ADV IND & TECHNOL);
 [X]JP2009013449  (MITSUI MINING & SMELTING CO);
 [X]JP2009527640  (CLIMAX ENGINEERED MATERIALS, L.L.C.);
 [X]WO2009096569  (UNIV KYUSHU NAT UNIV CORP [JP], et al)
Examination   - HONG L ET AL, "Synthesis of flower-like silver nanoarchitectures at room temperature", MATERIALS RESEARCH BULLETIN, ELSEVIER, KIDLINGTON, GB, vol. 44, no. 6, doi:10.1016/J.MATERRESBULL.2009.01.017, ISSN 0025-5408, (20090603), pages 1201 - 1204, (20090203), XP026038593

DOI:   http://dx.doi.org/10.1016/j.materresbull.2009.01.017
by applicantJP2004149903
 JP2005146387
 JP2007204795
 JP2009144196
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.