blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2648346

EP2648346 - OPTICAL TRANSPORT SYSTEM, OPTICAL TRANSMITTER DEVICE AND OPTICAL RECEIVER DEVICE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  09.04.2021
Database last updated on 24.04.2024
FormerThe patent has been granted
Status updated on  01.05.2020
FormerGrant of patent is intended
Status updated on  02.01.2020
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Mitsubishi Electric Corporation
7-3 Marunouchi 2-Chome
Chiyoda-ku
Tokyo 100-8310 / JP
[2020/23]
Former [2013/41]For all designated states
Mitsubishi Electric Corporation
7-3 Marunouchi 2-Chome Chiyoda-ku
Tokyo 100-8310 / JP
Inventor(s)01 / YOSHIDA, Tsuyoshi
c/o Mitsubishi Electric Corporation
7-3 Marunouchi 2-chome
Chiyoda-ku
Tokyo 100-8310 / JP
02 / SUGIHARA, Takashi
c/o Mitsubishi Electric Corporation
7-3 Marunouchi 2-chome
Chiyoda-ku
Tokyo 100-8310 / JP
03 / ISHIDA, Kazuyuki
c/o Mitsubishi Electric Corporation
7-3 Marunouchi 2-chome
Chiyoda-ku
Tokyo 100-8310 / JP
04 / MIZUOCHI, Takashi
c/o Mitsubishi Electric Corporation
7-3 Marunouchi 2-chome
Chiyoda-ku
Tokyo 100-8310 / JP
 [2013/41]
Representative(s)Lavoix
Bayerstraße 83
80335 München / DE
[N/P]
Former [2020/23]Lavoix
Bayerstrasse 83
80335 München / DE
Former [2013/41]Tischner, Oliver
Lavoix
Bayerstrasse 83
80335 München / DE
Application number, filing date11845299.430.09.2011
[2020/23]
WO2011JP72638
Priority number, dateWO2010JP0696730.11.2010         Original published format: PCT/JP2010/006967
[2013/41]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2012073590
Date:07.06.2012
Language:JA
[2012/23]
Type: A1 Application with search report 
No.:EP2648346
Date:09.10.2013
Language:EN
[2013/41]
Type: B1 Patent specification 
No.:EP2648346
Date:03.06.2020
Language:EN
[2020/23]
Search report(s)International search report - published on:JP07.06.2012
(Supplementary) European search report - dispatched on:EP12.07.2017
ClassificationIPC:H04J14/06, H04J14/00, H04J14/04, H04B10/50, H04B10/532, H04B10/61
[2017/32]
CPC:
H04J14/06 (EP,US); H04B10/5053 (EP,US); H04B10/532 (EP,US);
H04B10/616 (EP,US); H04J14/002 (EP,US)
Former IPC [2013/41]H04B10/02, H04B10/18, H04J14/00, H04J14/04, H04J14/06
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2013/41]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:OPTISCHES TRANSPORTSYSTEM, OPTISCHE SENDEVORRICHTUNG UND OPTISCHE EMPFANGSVORRICHTUNG[2013/41]
English:OPTICAL TRANSPORT SYSTEM, OPTICAL TRANSMITTER DEVICE AND OPTICAL RECEIVER DEVICE[2013/41]
French:SYSTÈME DE TRANSPORT OPTIQUE, DISPOSITIF ÉMETTEUR OPTIQUE ET DISPOSITIF RÉCEPTEUR OPTIQUE[2013/41]
Entry into regional phase25.04.2013Translation filed 
25.04.2013National basic fee paid 
25.04.2013Search fee paid 
25.04.2013Designation fee(s) paid 
25.04.2013Examination fee paid 
Examination procedure25.04.2013Examination requested  [2013/41]
30.11.2017Amendment by applicant (claims and/or description)
03.01.2020Communication of intention to grant the patent
22.04.2020Fee for grant paid
22.04.2020Fee for publishing/printing paid
22.04.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  03.01.2020
Opposition(s)04.03.2021No opposition filed within time limit [2021/19]
Fees paidRenewal fee
23.09.2013Renewal fee patent year 03
29.09.2014Renewal fee patent year 04
11.09.2015Renewal fee patent year 05
13.09.2016Renewal fee patent year 06
12.09.2017Renewal fee patent year 07
11.09.2018Renewal fee patent year 08
13.09.2019Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU30.09.2011
AL03.06.2020
AT03.06.2020
CY03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
MK03.06.2020
MT03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
TR03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
BE30.09.2020
CH30.09.2020
GB30.09.2020
IE30.09.2020
LI30.09.2020
LU30.09.2020
IS03.10.2020
PT06.10.2020
[2022/32]
Former [2022/27]HU30.09.2011
AL03.06.2020
AT03.06.2020
CY03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
MT03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
TR03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
BE30.09.2020
CH30.09.2020
GB30.09.2020
IE30.09.2020
LI30.09.2020
LU30.09.2020
IS03.10.2020
PT06.10.2020
Former [2022/26]AL03.06.2020
AT03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
TR03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
BE30.09.2020
CH30.09.2020
GB30.09.2020
IE30.09.2020
LI30.09.2020
LU30.09.2020
IS03.10.2020
PT06.10.2020
Former [2021/38]AL03.06.2020
AT03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
BE30.09.2020
CH30.09.2020
GB30.09.2020
IE30.09.2020
LI30.09.2020
LU30.09.2020
IS03.10.2020
PT06.10.2020
Former [2021/37]AL03.06.2020
AT03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
BE30.09.2020
CH30.09.2020
IE30.09.2020
LI30.09.2020
LU30.09.2020
IS03.10.2020
PT06.10.2020
Former [2021/36]AL03.06.2020
AT03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
BE30.09.2020
LU30.09.2020
IS03.10.2020
PT06.10.2020
Former [2021/27]AL03.06.2020
AT03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
LU30.09.2020
IS03.10.2020
PT06.10.2020
Former [2021/23]AL03.06.2020
AT03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
MC03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SI03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
Former [2021/20]AL03.06.2020
AT03.06.2020
CZ03.06.2020
DK03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
Former [2021/10]AL03.06.2020
AT03.06.2020
CZ03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
NL03.06.2020
PL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SK03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
IS03.10.2020
PT06.10.2020
Former [2021/09]AL03.06.2020
AT03.06.2020
CZ03.06.2020
EE03.06.2020
ES03.06.2020
FI03.06.2020
HR03.06.2020
IT03.06.2020
LT03.06.2020
LV03.06.2020
NL03.06.2020
RO03.06.2020
RS03.06.2020
SE03.06.2020
SM03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
PT06.10.2020
Former [2021/04]AL03.06.2020
FI03.06.2020
HR03.06.2020
LT03.06.2020
LV03.06.2020
NL03.06.2020
RS03.06.2020
SE03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
Former [2021/01]FI03.06.2020
HR03.06.2020
LT03.06.2020
LV03.06.2020
RS03.06.2020
SE03.06.2020
BG03.09.2020
NO03.09.2020
GR04.09.2020
Former [2020/51]FI03.06.2020
HR03.06.2020
LT03.06.2020
LV03.06.2020
RS03.06.2020
SE03.06.2020
NO03.09.2020
GR04.09.2020
Former [2020/50]FI03.06.2020
HR03.06.2020
LT03.06.2020
LV03.06.2020
SE03.06.2020
NO03.09.2020
GR04.09.2020
Former [2020/48]FI03.06.2020
LT03.06.2020
SE03.06.2020
NO03.09.2020
Former [2020/47]LT03.06.2020
NO03.09.2020
Documents cited:Search[A]US2007206960  (NISSOV MORTEN [US], et al) [A] 1-16 * paragraph [0002] * * paragraph [0007] - paragraph [0008] * * paragraph [0025] - paragraph [0038]; figures 2,2A *;
 [XI]US2010215374  (LIU XIANG [US], et al) [X] 1-4,11,12,14-16 * paragraph [0005] * * paragraph [0012] - paragraph [0024]; figures 1,2 * * paragraph [0040] - paragraph [0052]; figures 3,4,5 * [I] 5-10,13;
 [XI]  - VAN DEN BORNE D ET AL, "1.6-b/s/Hz Spectrally Efficient Transmission Over 1700 km of SSMF Using 40 85.6-Gb/s POLMUX-RZ-DQPSK", JOURNAL OF LIGHTWAVE TECHNOLOGY, IEEE SERVICE CENTER, NEW YORK, NY, US, (20070101), vol. 25, no. 1, doi:10.1109/JLT.2006.886724, ISSN 0733-8724, pages 222 - 232, XP011175493 [X] 3-9,11,12,14 * page 224, column r, paragraph 2 - page 226, column l, paragraph 1; figure 1 * * page 226, column r, paragraph 3 - page 227, column l, paragraph 2; figure 6 * [I] 1,2,10,13,15,16

DOI:   http://dx.doi.org/10.1109/JLT.2006.886724
 [A]  - DOERR C ET AL, "High Spectral Density Long-Haul 40-Gb/s Transmission Using CSRZ-DPSK Format", JOURNAL OF LIGHTWAVE TECHNOLOGY, IEEE SERVICE CENTER, NEW YORK, NY, US, (20040101), vol. 22, no. 1, doi:10.1109/JLT.2003.822165, ISSN 0733-8724, pages 208 - 214, XP011107637 [A] 1-16 * page 208, column r, paragraph 4 - page 211, column l, paragraph 1; figures 1,2,3 *

DOI:   http://dx.doi.org/10.1109/JLT.2003.822165
International search[Y]JPH1188299  (NIPPON TELEGRAPH & TELEPHONE);
 [Y]JP2003021816  (KDDI SUBMARINE CABLE SYS INC);
 [A]JP2009027525  (NEC CORP);
 [Y]JP2009060461  (FUJITSU LTD);
 [Y]JP2009278338  (NIPPON TELEGRAPH & TELEPHONE);
 [Y]JP2010243953  (NIPPON TELEGRAPH & TELEPHONE);
 [Y]  - TAKAHITO TANIMURA ET AL., "Semi-blind Multi- Stage Dual-Polarization Nonlinear Compensation in 112 Gb/s DP-QPSK Coherent Receiver", IEICE TECHNICAL REPORT, HIKARI TSUSHIN SYSTEM, (20100722), vol. 110, no. 152, pages 57 - 62, XP008170531
 [Y]  - ZHANG B. ET AL., "Penalty-free transmission of 127-Gb/s coherent PM-QPSK over 1500-km of NDSF with 10 cascaded 50-GHz ROADMs", OFC/NFOEC 2010, (201003), XP031676677
 [Y]  - JIANJUN Y. ET AL., "20x112Gbit/s, 50GHz spaced, PolMux-RZ-QPSK straight-line transmission over 1540km of SSMF employing digital coherent detection and pure EDFA amplification", ECOC 2008, (200809), pages 1 - 2, XP031381169
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.