EP2668750 - METHODS AND APPARATUSES FOR FACILITATING DETERMINATION OF A STATE OF A RECEIVER BUFFER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.08.2019 Database last updated on 03.06.2024 | |
Former | The patent has been granted Status updated on 24.08.2018 | ||
Former | Grant of patent is intended Status updated on 24.04.2018 | Most recent event Tooltip | 03.07.2020 | Lapse of the patent in a contracting state New state(s): CY, MK | published on 05.08.2020 [2020/32] | Applicant(s) | For all designated states Nokia Technologies Oy Karaportti 3 02610 Espoo / FI | [2018/39] |
Former [2015/32] | For all designated states Nokia Technologies Oy Karaportti 3 02610 Espoo / FI | ||
Former [2014/24] | For all designated states Nokia Corporation Karakaari 7 02610 Espoo / FI | ||
Former [2013/49] | For all designated states Nokia Corporation Keilalahdentie 4 02150 Espoo / FI | Inventor(s) | 01 /
CURCIO, Igor D Hatanpaan Valtatie 12C57 FI-33100 Tampere / FI | 02 /
OTT, Jorg Kruununkuja 4A1 FI-02180 Espoo / FI | 03 /
SINGH, Varun Avaruuskatu 4C036 FI-02210 Espoo / FI | [2013/49] | Representative(s) | Berggren Oy P.O. Box 16 Eteläinen Rautatiekatu 10A 00101 Helsinki / FI | [N/P] |
Former [2018/39] | Berggren Oy, Tampere Visiokatu 1 33720 Tampere / FI | ||
Former [2013/49] | Jaatinen, Jussi Imari Nokia Corporation Intellectual Property Department Keilalahdentie 4 02150 Espoo / FI | Application number, filing date | 11853532.7 | 18.10.2011 | [2018/39] | WO2011IB54613 | Priority number, date | US20100982190 | 30.12.2010 Original published format: US 982190 | [2013/49] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2012090081 | Date: | 05.07.2012 | Language: | EN | [2012/27] | Type: | A1 Application with search report | No.: | EP2668750 | Date: | 04.12.2013 | Language: | EN | The application published by WIPO in one of the EPO official languages on 05.07.2012 takes the place of the publication of the European patent application. | [2013/49] | Type: | B1 Patent specification | No.: | EP2668750 | Date: | 26.09.2018 | Language: | EN | [2018/39] | Search report(s) | International search report - published on: | SE | 05.07.2012 | (Supplementary) European search report - dispatched on: | EP | 06.09.2017 | Classification | IPC: | H04L12/835, H04L12/801, H04L12/825, H04L12/841, H04L1/18, H04B7/04 | [2018/20] | CPC: |
H04L47/30 (EP,US);
H04B7/0417 (US);
H04L1/1874 (US);
H04L47/263 (EP,US);
H04L47/283 (EP,US);
H04L47/10 (EP,US);
|
Former IPC [2017/40] | H04L12/835, H04L12/801, H04L12/825, H04L12/841, H04L1/18 | ||
Former IPC [2013/49] | H04L12/56, H04L29/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/49] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNGEN ZUR BESTIMMUNG DES ZUSTANDS EINES EMPFÄNGERPUFFERS | [2013/49] | English: | METHODS AND APPARATUSES FOR FACILITATING DETERMINATION OF A STATE OF A RECEIVER BUFFER | [2013/49] | French: | PROCÉDÉS ET APPAREILS POUR FACILITER LA DÉTERMINATION D'UN ÉTAT D'UN TAMPON DE RÉCEPTEUR | [2013/49] | Entry into regional phase | 25.07.2013 | National basic fee paid | 25.07.2013 | Search fee paid | 25.07.2013 | Designation fee(s) paid | 25.07.2013 | Examination fee paid | Examination procedure | 25.07.2013 | Examination requested [2013/49] | 21.03.2018 | Amendment by applicant (claims and/or description) | 25.04.2018 | Communication of intention to grant the patent | 20.08.2018 | Fee for grant paid | 20.08.2018 | Fee for publishing/printing paid | 20.08.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 25.04.2018 | Opposition(s) | 27.06.2019 | No opposition filed within time limit [2019/36] | Fees paid | Renewal fee | 14.10.2013 | Renewal fee patent year 03 | 14.10.2014 | Renewal fee patent year 04 | 12.10.2015 | Renewal fee patent year 05 | 11.10.2016 | Renewal fee patent year 06 | 11.10.2017 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 18.10.2011 | AL | 26.09.2018 | AT | 26.09.2018 | CY | 26.09.2018 | CZ | 26.09.2018 | DK | 26.09.2018 | EE | 26.09.2018 | ES | 26.09.2018 | FI | 26.09.2018 | HR | 26.09.2018 | IT | 26.09.2018 | LT | 26.09.2018 | LV | 26.09.2018 | MC | 26.09.2018 | MK | 26.09.2018 | NL | 26.09.2018 | PL | 26.09.2018 | RO | 26.09.2018 | RS | 26.09.2018 | SE | 26.09.2018 | SI | 26.09.2018 | SK | 26.09.2018 | SM | 26.09.2018 | TR | 26.09.2018 | IE | 18.10.2018 | LU | 18.10.2018 | MT | 18.10.2018 | BE | 31.10.2018 | CH | 31.10.2018 | LI | 31.10.2018 | FR | 26.11.2018 | BG | 26.12.2018 | GB | 26.12.2018 | NO | 26.12.2018 | GR | 27.12.2018 | IS | 26.01.2019 | PT | 26.01.2019 | [2020/31] |
Former [2020/30] | HU | 18.10.2011 | |
AL | 26.09.2018 | ||
AT | 26.09.2018 | ||
CZ | 26.09.2018 | ||
DK | 26.09.2018 | ||
EE | 26.09.2018 | ||
ES | 26.09.2018 | ||
FI | 26.09.2018 | ||
HR | 26.09.2018 | ||
IT | 26.09.2018 | ||
LT | 26.09.2018 | ||
LV | 26.09.2018 | ||
MC | 26.09.2018 | ||
NL | 26.09.2018 | ||
PL | 26.09.2018 | ||
RO | 26.09.2018 | ||
RS | 26.09.2018 | ||
SE | 26.09.2018 | ||
SI | 26.09.2018 | ||
SK | 26.09.2018 | ||
SM | 26.09.2018 | ||
TR | 26.09.2018 | ||
IE | 18.10.2018 | ||
LU | 18.10.2018 | ||
MT | 18.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
FR | 26.11.2018 | ||
BG | 26.12.2018 | ||
GB | 26.12.2018 | ||
NO | 26.12.2018 | ||
GR | 27.12.2018 | ||
IS | 26.01.2019 | ||
PT | 26.01.2019 | ||
Former [2020/17] | AL | 26.09.2018 | |
AT | 26.09.2018 | ||
CZ | 26.09.2018 | ||
DK | 26.09.2018 | ||
EE | 26.09.2018 | ||
ES | 26.09.2018 | ||
FI | 26.09.2018 | ||
HR | 26.09.2018 | ||
IT | 26.09.2018 | ||
LT | 26.09.2018 | ||
LV | 26.09.2018 | ||
MC | 26.09.2018 | ||
NL | 26.09.2018 | ||
PL | 26.09.2018 | ||
RO | 26.09.2018 | ||
RS | 26.09.2018 | ||
SE | 26.09.2018 | ||
SI | 26.09.2018 | ||
SK | 26.09.2018 | ||
SM | 26.09.2018 | ||
TR | 26.09.2018 | ||
IE | 18.10.2018 | ||
LU | 18.10.2018 | ||
MT | 18.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
FR | 26.11.2018 | ||
BG | 26.12.2018 | ||
GB | 26.12.2018 | ||
NO | 26.12.2018 | ||
GR | 27.12.2018 | ||
IS | 26.01.2019 | ||
PT | 26.01.2019 | ||
Former [2020/08] | AL | 26.09.2018 | |
AT | 26.09.2018 | ||
CZ | 26.09.2018 | ||
DK | 26.09.2018 | ||
EE | 26.09.2018 | ||
ES | 26.09.2018 | ||
FI | 26.09.2018 | ||
HR | 26.09.2018 | ||
IT | 26.09.2018 | ||
LT | 26.09.2018 | ||
LV | 26.09.2018 | ||
MC | 26.09.2018 | ||
NL | 26.09.2018 | ||
PL | 26.09.2018 | ||
RO | 26.09.2018 | ||
RS | 26.09.2018 | ||
SE | 26.09.2018 | ||
SI | 26.09.2018 | ||
SK | 26.09.2018 | ||
SM | 26.09.2018 | ||
IE | 18.10.2018 | ||
LU | 18.10.2018 | ||
MT | 18.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
FR | 26.11.2018 | ||
BG | 26.12.2018 | ||
GB | 26.12.2018 | ||
NO | 26.12.2018 | ||
GR | 27.12.2018 | ||
IS | 26.01.2019 | ||
PT | 26.01.2019 | ||
Former [2020/03] | AL | 26.09.2018 | |
AT | 26.09.2018 | ||
CZ | 26.09.2018 | ||
DK | 26.09.2018 | ||
EE | 26.09.2018 | ||
ES | 26.09.2018 | ||
FI | 26.09.2018 | ||
HR | 26.09.2018 | ||
IT | 26.09.2018 | ||
LT | 26.09.2018 | ||
LV | 26.09.2018 | ||
MC | 26.09.2018 | ||
NL | 26.09.2018 | ||
PL | 26.09.2018 | ||
RO | 26.09.2018 | ||
RS | 26.09.2018 | ||
SE | 26.09.2018 | ||
SI | 26.09.2018 | ||
SK | 26.09.2018 | ||
SM | 26.09.2018 | ||
IE | 18.10.2018 | ||
LU | 18.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
FR | 26.11.2018 | ||
BG | 26.12.2018 | ||
GB | 26.12.2018 | ||
NO | 26.12.2018 | ||
GR | 27.12.2018 | ||
IS | 26.01.2019 | ||
PT | 26.01.2019 | ||
Former [2019/49] | AL | 26.09.2018 | |
AT | 26.09.2018 | ||
CZ | 26.09.2018 | ||
DK | 26.09.2018 | ||
EE | 26.09.2018 | ||
ES | 26.09.2018 | ||
FI | 26.09.2018 | ||
HR | 26.09.2018 | ||
IT | 26.09.2018 | ||
LT | 26.09.2018 | ||
LV | 26.09.2018 | ||
MC | 26.09.2018 | ||
NL | 26.09.2018 | ||
PL | 26.09.2018 | ||
RO | 26.09.2018 | ||
RS | 26.09.2018 | ||
SE | 26.09.2018 | ||
SI | 26.09.2018 | ||
SK | 26.09.2018 | ||
SM | 26.09.2018 | ||
IE | 18.10.2018 | ||
LU | 18.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
FR | 26.11.2018 | ||
BG | 26.12.2018 | ||
NO | 26.12.2018 | ||
GR | 27.12.2018 | ||
IS | 26.01.2019 | ||
PT | 26.01.2019 | ||
Former [2019/48] | AL | 26.09.2018 | |
AT | 26.09.2018 | ||
CZ | 26.09.2018 | ||
DK | 26.09.2018 | ||
EE | 26.09.2018 | ||
ES | 26.09.2018 | ||
FI | 26.09.2018 | ||
HR | 26.09.2018 | ||
IT | 26.09.2018 | ||
LT | 26.09.2018 | ||
LV | 26.09.2018 | ||
MC | 26.09.2018 | ||
NL | 26.09.2018 | ||
PL | 26.09.2018 | ||
RO | 26.09.2018 | ||
RS | 26.09.2018 | ||
SE | 26.09.2018 | ||
SK | 26.09.2018 | ||
SM | 26.09.2018 | ||
IE | 18.10.2018 | ||
LU | 18.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 26.12.2018 | ||
NO | 26.12.2018 | ||
GR | 27.12.2018 | ||
IS | 26.01.2019 | ||
PT | 26.01.2019 | ||
Former [2019/40] | AL | 26.09.2018 | |
AT | 26.09.2018 | ||
CZ | 26.09.2018 | ||
DK | 26.09.2018 | ||
EE | 26.09.2018 | ||
ES | 26.09.2018 | ||
FI | 26.09.2018 | ||
HR | 26.09.2018 | ||
IT | 26.09.2018 | ||
LT | 26.09.2018 | ||
LV | 26.09.2018 | ||
MC | 26.09.2018 | ||
NL | 26.09.2018 | ||
PL | 26.09.2018 | ||
RO | 26.09.2018 | ||
RS | 26.09.2018 | ||
SE | 26.09.2018 | ||
SK | 26.09.2018 | ||
SM | 26.09.2018 | ||
LU | 18.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 26.12.2018 | ||
NO | 26.12.2018 | ||
GR | 27.12.2018 | ||
IS | 26.01.2019 | ||
PT | 26.01.2019 | ||
Former [2019/38] | AL | 26.09.2018 | |
AT | 26.09.2018 | ||
CZ | 26.09.2018 | ||
DK | 26.09.2018 | ||
EE | 26.09.2018 | ||
ES | 26.09.2018 | ||
FI | 26.09.2018 | ||
HR | 26.09.2018 | ||
IT | 26.09.2018 | ||
LT | 26.09.2018 | ||
LV | 26.09.2018 | ||
MC | 26.09.2018 | ||
NL | 26.09.2018 | ||
PL | 26.09.2018 | ||
RO | 26.09.2018 | ||
RS | 26.09.2018 | ||
SE | 26.09.2018 | ||
SK | 26.09.2018 | ||
SM | 26.09.2018 | ||
LU | 18.10.2018 | ||
BE | 31.10.2018 | ||
BG | 26.12.2018 | ||
NO | 26.12.2018 | ||
GR | 27.12.2018 | ||
IS | 26.01.2019 | ||
PT | 26.01.2019 | ||
Former [2019/34] | AL | 26.09.2018 | |
AT | 26.09.2018 | ||
CZ | 26.09.2018 | ||
DK | 26.09.2018 | ||
EE | 26.09.2018 | ||
ES | 26.09.2018 | ||
FI | 26.09.2018 | ||
HR | 26.09.2018 | ||
IT | 26.09.2018 | ||
LT | 26.09.2018 | ||
LV | 26.09.2018 | ||
MC | 26.09.2018 | ||
NL | 26.09.2018 | ||
PL | 26.09.2018 | ||
RO | 26.09.2018 | ||
RS | 26.09.2018 | ||
SE | 26.09.2018 | ||
SK | 26.09.2018 | ||
SM | 26.09.2018 | ||
LU | 18.10.2018 | ||
BG | 26.12.2018 | ||
NO | 26.12.2018 | ||
GR | 27.12.2018 | ||
IS | 26.01.2019 | ||
PT | 26.01.2019 | ||
Former [2019/33] | AL | 26.09.2018 | |
AT | 26.09.2018 | ||
CZ | 26.09.2018 | ||
EE | 26.09.2018 | ||
ES | 26.09.2018 | ||
FI | 26.09.2018 | ||
HR | 26.09.2018 | ||
IT | 26.09.2018 | ||
LT | 26.09.2018 | ||
LV | 26.09.2018 | ||
MC | 26.09.2018 | ||
NL | 26.09.2018 | ||
PL | 26.09.2018 | ||
RO | 26.09.2018 | ||
RS | 26.09.2018 | ||
SE | 26.09.2018 | ||
SK | 26.09.2018 | ||
SM | 26.09.2018 | ||
LU | 18.10.2018 | ||
BG | 26.12.2018 | ||
NO | 26.12.2018 | ||
GR | 27.12.2018 | ||
IS | 26.01.2019 | ||
PT | 26.01.2019 | ||
Former [2019/30] | AL | 26.09.2018 | |
AT | 26.09.2018 | ||
CZ | 26.09.2018 | ||
EE | 26.09.2018 | ||
ES | 26.09.2018 | ||
FI | 26.09.2018 | ||
HR | 26.09.2018 | ||
IT | 26.09.2018 | ||
LT | 26.09.2018 | ||
LV | 26.09.2018 | ||
NL | 26.09.2018 | ||
PL | 26.09.2018 | ||
RO | 26.09.2018 | ||
RS | 26.09.2018 | ||
SE | 26.09.2018 | ||
SK | 26.09.2018 | ||
SM | 26.09.2018 | ||
LU | 18.10.2018 | ||
BG | 26.12.2018 | ||
NO | 26.12.2018 | ||
GR | 27.12.2018 | ||
IS | 26.01.2019 | ||
PT | 26.01.2019 | ||
Former [2019/26] | AL | 26.09.2018 | |
AT | 26.09.2018 | ||
CZ | 26.09.2018 | ||
EE | 26.09.2018 | ||
ES | 26.09.2018 | ||
FI | 26.09.2018 | ||
HR | 26.09.2018 | ||
IT | 26.09.2018 | ||
LT | 26.09.2018 | ||
LV | 26.09.2018 | ||
NL | 26.09.2018 | ||
PL | 26.09.2018 | ||
RO | 26.09.2018 | ||
RS | 26.09.2018 | ||
SE | 26.09.2018 | ||
SK | 26.09.2018 | ||
SM | 26.09.2018 | ||
BG | 26.12.2018 | ||
NO | 26.12.2018 | ||
GR | 27.12.2018 | ||
IS | 26.01.2019 | ||
PT | 26.01.2019 | ||
Former [2019/23] | AL | 26.09.2018 | |
AT | 26.09.2018 | ||
CZ | 26.09.2018 | ||
EE | 26.09.2018 | ||
ES | 26.09.2018 | ||
FI | 26.09.2018 | ||
HR | 26.09.2018 | ||
IT | 26.09.2018 | ||
LT | 26.09.2018 | ||
LV | 26.09.2018 | ||
NL | 26.09.2018 | ||
PL | 26.09.2018 | ||
RO | 26.09.2018 | ||
RS | 26.09.2018 | ||
SE | 26.09.2018 | ||
SK | 26.09.2018 | ||
BG | 26.12.2018 | ||
NO | 26.12.2018 | ||
GR | 27.12.2018 | ||
IS | 26.01.2019 | ||
Former [2019/22] | AL | 26.09.2018 | |
CZ | 26.09.2018 | ||
FI | 26.09.2018 | ||
HR | 26.09.2018 | ||
IT | 26.09.2018 | ||
LT | 26.09.2018 | ||
LV | 26.09.2018 | ||
NL | 26.09.2018 | ||
PL | 26.09.2018 | ||
RO | 26.09.2018 | ||
RS | 26.09.2018 | ||
SE | 26.09.2018 | ||
BG | 26.12.2018 | ||
NO | 26.12.2018 | ||
GR | 27.12.2018 | ||
IS | 26.01.2019 | ||
Former [2019/21] | AL | 26.09.2018 | |
FI | 26.09.2018 | ||
HR | 26.09.2018 | ||
IT | 26.09.2018 | ||
LT | 26.09.2018 | ||
LV | 26.09.2018 | ||
NL | 26.09.2018 | ||
RS | 26.09.2018 | ||
SE | 26.09.2018 | ||
BG | 26.12.2018 | ||
NO | 26.12.2018 | ||
GR | 27.12.2018 | ||
IS | 26.01.2019 | ||
Former [2019/20] | AL | 26.09.2018 | |
FI | 26.09.2018 | ||
HR | 26.09.2018 | ||
LT | 26.09.2018 | ||
LV | 26.09.2018 | ||
NL | 26.09.2018 | ||
RS | 26.09.2018 | ||
SE | 26.09.2018 | ||
BG | 26.12.2018 | ||
NO | 26.12.2018 | ||
GR | 27.12.2018 | ||
Former [2019/12] | AL | 26.09.2018 | |
FI | 26.09.2018 | ||
HR | 26.09.2018 | ||
LT | 26.09.2018 | ||
LV | 26.09.2018 | ||
RS | 26.09.2018 | ||
SE | 26.09.2018 | ||
BG | 26.12.2018 | ||
NO | 26.12.2018 | ||
GR | 27.12.2018 | ||
Former [2019/11] | FI | 26.09.2018 | |
HR | 26.09.2018 | ||
LT | 26.09.2018 | ||
RS | 26.09.2018 | ||
SE | 26.09.2018 | ||
BG | 26.12.2018 | ||
NO | 26.12.2018 | ||
GR | 27.12.2018 | ||
Former [2019/10] | FI | 26.09.2018 | |
LT | 26.09.2018 | ||
RS | 26.09.2018 | ||
SE | 26.09.2018 | ||
BG | 26.12.2018 | ||
NO | 26.12.2018 | ||
GR | 27.12.2018 | ||
Former [2019/08] | FI | 26.09.2018 | |
LT | 26.09.2018 | ||
NO | 26.12.2018 | ||
Former [2019/07] | LT | 26.09.2018 | Documents cited: | Search | [A]US2006282566 (VIRDI GURPRATAP [US], et al) [A] 1-15* paragraphs [0024] , [0026] , [0 32] , [0 38] , [0043] *; | [I] - SEONG-JUN BAE ET AL, "TCP-friendly wireless multimedia flow control using ECN marking", GLOBECOM'02. 2002 - IEEE GLOBAL TELECOMMUNICATIONS CONFERENCE. CONFERENCE PROCEEDINGS. TAIPEI, TAIWAN, NOV. 17 - 21, 2002; [IEEE GLOBAL TELECOMMUNICATIONS CONFERENCE], NEW YORK, NY : IEEE, US, (20021117), vol. 2, doi:10.1109/GLOCOM.2002.1188507, ISBN 978-0-7803-7632-8, pages 1794 - 1799, XP010636452 [I] 1-15 * paragraph [II.B] * DOI: http://dx.doi.org/10.1109/GLOCOM.2002.1188507 | [A] - "Universal Mobile Telecommunications System (UMTS); LTE; Transparent end-to-end packet switched streaming service (PSS); Real-time Transport Protocol (RTP) usage model (3GPP TR 26.937 version 9.0.0 Release 9)", TECHNICAL REPORT, EUROPEAN TELECOMMUNICATIONS STANDARDS INSTITUTE (ETSI), 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS ; FRANCE, (20100101), no. V9.0.0, XP014044987 [A] 1-15 * paragraph [6.2a.1] * | International search | [A]US2004186877 (WANG RU-SHANG [US], et al); | [A]US2005254427 (LEON DAVID [US], et al); | [A]US2008091838 (MICELI SEAN [US]); | [A]US2008120424 (DESHPANDE SACHIN G [US]) |