EP2663111 - CAPACITY AND COVERAGE SELF-OPTIMIZATION METHOD AND DEVICE IN MOBILE NETWORK [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.04.2016 Database last updated on 12.07.2024 | Most recent event Tooltip | 12.10.2018 | Lapse of the patent in a contracting state New state(s): AL | published on 14.11.2018 [2018/46] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. B1-3A Intellectual Property Department Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2015/22] |
Former [2013/46] | For all designated states Huawei Technologies Co., Ltd. B1-3A Intellectual Property Dept. Huawei Administration Building Bantian Longgang Shenzhen, Guangdong 518129 / CN | Inventor(s) | 01 /
ZHUANG, Hongcheng Huawei Administration Building Bantian Longgang Shenzhen Guangdong 518129 / CN | 02 /
ZHANG, Jietao Huawei Administration Building Bantian Longgang Shenzhen Guangdong 518129 / CN | 03 /
LUO, Zezhou Huawei Administration Building Bantian Longgang Shenzhen Guangdong 518129 / CN | [2013/46] | Representative(s) | Kreuz, Georg Maria Huawei Technologies Duesseldorf GmbH Riesstraße 25 80992 München / DE | [N/P] |
Former [2015/22] | Kreuz, Georg Maria Huawei Technologies Duesseldorf GmbH Messerschmittstrasse 4 80992 München / DE | ||
Former [2013/46] | Kreuz, Georg Maria Huawei Technologies Dessauerstrasse 3 80992 Munich / DE | Application number, filing date | 11855245.4 | 21.07.2011 | WO2011CN77441 | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2012159340 | Date: | 29.11.2012 | Language: | ZH | [2012/48] | Type: | A1 Application with search report | No.: | EP2663111 | Date: | 13.11.2013 | Language: | EN | [2013/46] | Type: | B1 Patent specification | No.: | EP2663111 | Date: | 27.05.2015 | Language: | EN | [2015/22] | Search report(s) | International search report - published on: | CN | 29.11.2012 | (Supplementary) European search report - dispatched on: | EP | 21.01.2014 | Classification | IPC: | H04W16/18, H04W16/10, // H04W16/28, H04W16/24, H04W24/02 | [2014/08] | CPC: |
H04W16/10 (EP,BR,US);
H04W24/02 (EP,BR,US);
H04W16/30 (EP,BR,US)
|
Former IPC [2013/46] | H04W16/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/46] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR KAPAZITÄTS- UND ABDECKUNGS-SELBSTOPTIMIERUNG IN EINEM MOBILEN NETZWERK | [2013/46] | English: | CAPACITY AND COVERAGE SELF-OPTIMIZATION METHOD AND DEVICE IN MOBILE NETWORK | [2013/46] | French: | PROCÉDÉ ET DISPOSITIF D'OPTIMISATION AUTOMATIQUE DE CAPACITÉ ET DE COUVERTURE DANS UN RÉSEAU MOBILE | [2013/46] | Entry into regional phase | 16.07.2012 | Translation filed | 16.07.2012 | National basic fee paid | 16.07.2012 | Search fee paid | 16.07.2012 | Designation fee(s) paid | 16.07.2012 | Examination fee paid | Examination procedure | 16.07.2012 | Examination requested [2013/46] | 14.08.2014 | Amendment by applicant (claims and/or description) | 28.11.2014 | Communication of intention to grant the patent | 08.04.2015 | Fee for grant paid | 08.04.2015 | Fee for publishing/printing paid | 08.04.2015 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 28.11.2014 | Opposition(s) | 01.03.2016 | No opposition filed within time limit [2016/18] | Fees paid | Renewal fee | 31.07.2013 | Renewal fee patent year 03 | 31.07.2014 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.07.2011 | AL | 27.05.2015 | AT | 27.05.2015 | BE | 27.05.2015 | CY | 27.05.2015 | CZ | 27.05.2015 | DK | 27.05.2015 | EE | 27.05.2015 | ES | 27.05.2015 | FI | 27.05.2015 | HR | 27.05.2015 | IT | 27.05.2015 | LT | 27.05.2015 | LV | 27.05.2015 | MC | 27.05.2015 | MK | 27.05.2015 | MT | 27.05.2015 | NL | 27.05.2015 | PL | 27.05.2015 | RO | 27.05.2015 | RS | 27.05.2015 | SE | 27.05.2015 | SI | 27.05.2015 | SK | 27.05.2015 | SM | 27.05.2015 | TR | 27.05.2015 | IE | 21.07.2015 | LU | 21.07.2015 | CH | 31.07.2015 | LI | 31.07.2015 | BG | 27.08.2015 | NO | 27.08.2015 | GR | 28.08.2015 | IS | 27.09.2015 | PT | 28.09.2015 | [2018/46] |
Former [2018/31] | HU | 21.07.2011 | |
AT | 27.05.2015 | ||
BE | 27.05.2015 | ||
CY | 27.05.2015 | ||
CZ | 27.05.2015 | ||
DK | 27.05.2015 | ||
EE | 27.05.2015 | ||
ES | 27.05.2015 | ||
FI | 27.05.2015 | ||
HR | 27.05.2015 | ||
IT | 27.05.2015 | ||
LT | 27.05.2015 | ||
LV | 27.05.2015 | ||
MC | 27.05.2015 | ||
MK | 27.05.2015 | ||
MT | 27.05.2015 | ||
NL | 27.05.2015 | ||
PL | 27.05.2015 | ||
RO | 27.05.2015 | ||
RS | 27.05.2015 | ||
SE | 27.05.2015 | ||
SI | 27.05.2015 | ||
SK | 27.05.2015 | ||
SM | 27.05.2015 | ||
TR | 27.05.2015 | ||
IE | 21.07.2015 | ||
LU | 21.07.2015 | ||
CH | 31.07.2015 | ||
LI | 31.07.2015 | ||
BG | 27.08.2015 | ||
NO | 27.08.2015 | ||
GR | 28.08.2015 | ||
IS | 27.09.2015 | ||
PT | 28.09.2015 | ||
Former [2017/39] | HU | 21.07.2011 | |
AT | 27.05.2015 | ||
BE | 27.05.2015 | ||
CY | 27.05.2015 | ||
CZ | 27.05.2015 | ||
DK | 27.05.2015 | ||
EE | 27.05.2015 | ||
ES | 27.05.2015 | ||
FI | 27.05.2015 | ||
HR | 27.05.2015 | ||
IT | 27.05.2015 | ||
LT | 27.05.2015 | ||
LV | 27.05.2015 | ||
MC | 27.05.2015 | ||
MT | 27.05.2015 | ||
NL | 27.05.2015 | ||
PL | 27.05.2015 | ||
RO | 27.05.2015 | ||
RS | 27.05.2015 | ||
SE | 27.05.2015 | ||
SI | 27.05.2015 | ||
SK | 27.05.2015 | ||
SM | 27.05.2015 | ||
IE | 21.07.2015 | ||
LU | 21.07.2015 | ||
CH | 31.07.2015 | ||
LI | 31.07.2015 | ||
BG | 27.08.2015 | ||
NO | 27.08.2015 | ||
GR | 28.08.2015 | ||
IS | 27.09.2015 | ||
PT | 28.09.2015 | ||
Former [2017/22] | AT | 27.05.2015 | |
BE | 27.05.2015 | ||
CZ | 27.05.2015 | ||
DK | 27.05.2015 | ||
EE | 27.05.2015 | ||
ES | 27.05.2015 | ||
FI | 27.05.2015 | ||
HR | 27.05.2015 | ||
IT | 27.05.2015 | ||
LT | 27.05.2015 | ||
LV | 27.05.2015 | ||
MC | 27.05.2015 | ||
MT | 27.05.2015 | ||
PL | 27.05.2015 | ||
RO | 27.05.2015 | ||
RS | 27.05.2015 | ||
SI | 27.05.2015 | ||
SK | 27.05.2015 | ||
IE | 21.07.2015 | ||
LU | 21.07.2015 | ||
CH | 31.07.2015 | ||
LI | 31.07.2015 | ||
BG | 27.08.2015 | ||
NO | 27.08.2015 | ||
GR | 28.08.2015 | ||
IS | 27.09.2015 | ||
PT | 28.09.2015 | ||
Former [2016/37] | AT | 27.05.2015 | |
BE | 27.05.2015 | ||
CZ | 27.05.2015 | ||
DK | 27.05.2015 | ||
EE | 27.05.2015 | ||
ES | 27.05.2015 | ||
FI | 27.05.2015 | ||
HR | 27.05.2015 | ||
IT | 27.05.2015 | ||
LT | 27.05.2015 | ||
LV | 27.05.2015 | ||
MC | 27.05.2015 | ||
PL | 27.05.2015 | ||
RO | 27.05.2015 | ||
RS | 27.05.2015 | ||
SI | 27.05.2015 | ||
SK | 27.05.2015 | ||
IE | 21.07.2015 | ||
LU | 21.07.2015 | ||
CH | 31.07.2015 | ||
LI | 31.07.2015 | ||
BG | 27.08.2015 | ||
NO | 27.08.2015 | ||
GR | 28.08.2015 | ||
IS | 27.09.2015 | ||
PT | 28.09.2015 | ||
Former [2016/33] | AT | 27.05.2015 | |
CZ | 27.05.2015 | ||
DK | 27.05.2015 | ||
EE | 27.05.2015 | ||
ES | 27.05.2015 | ||
FI | 27.05.2015 | ||
HR | 27.05.2015 | ||
IT | 27.05.2015 | ||
LT | 27.05.2015 | ||
LV | 27.05.2015 | ||
MC | 27.05.2015 | ||
PL | 27.05.2015 | ||
RO | 27.05.2015 | ||
RS | 27.05.2015 | ||
SI | 27.05.2015 | ||
SK | 27.05.2015 | ||
IE | 21.07.2015 | ||
LU | 21.07.2015 | ||
CH | 31.07.2015 | ||
LI | 31.07.2015 | ||
BG | 27.08.2015 | ||
NO | 27.08.2015 | ||
GR | 28.08.2015 | ||
IS | 27.09.2015 | ||
PT | 28.09.2015 | ||
Former [2016/24] | AT | 27.05.2015 | |
CZ | 27.05.2015 | ||
DK | 27.05.2015 | ||
EE | 27.05.2015 | ||
ES | 27.05.2015 | ||
FI | 27.05.2015 | ||
HR | 27.05.2015 | ||
IT | 27.05.2015 | ||
LT | 27.05.2015 | ||
LV | 27.05.2015 | ||
MC | 27.05.2015 | ||
PL | 27.05.2015 | ||
RO | 27.05.2015 | ||
RS | 27.05.2015 | ||
SI | 27.05.2015 | ||
SK | 27.05.2015 | ||
LU | 21.07.2015 | ||
CH | 31.07.2015 | ||
LI | 31.07.2015 | ||
BG | 27.08.2015 | ||
NO | 27.08.2015 | ||
GR | 28.08.2015 | ||
IS | 27.09.2015 | ||
PT | 28.09.2015 | ||
Former [2016/22] | AT | 27.05.2015 | |
CZ | 27.05.2015 | ||
DK | 27.05.2015 | ||
EE | 27.05.2015 | ||
ES | 27.05.2015 | ||
FI | 27.05.2015 | ||
HR | 27.05.2015 | ||
IT | 27.05.2015 | ||
LT | 27.05.2015 | ||
LV | 27.05.2015 | ||
MC | 27.05.2015 | ||
PL | 27.05.2015 | ||
RO | 27.05.2015 | ||
RS | 27.05.2015 | ||
SK | 27.05.2015 | ||
LU | 21.07.2015 | ||
CH | 31.07.2015 | ||
LI | 31.07.2015 | ||
BG | 27.08.2015 | ||
NO | 27.08.2015 | ||
GR | 28.08.2015 | ||
IS | 27.09.2015 | ||
PT | 28.09.2015 | ||
Former [2016/21] | AT | 27.05.2015 | |
CZ | 27.05.2015 | ||
DK | 27.05.2015 | ||
EE | 27.05.2015 | ||
ES | 27.05.2015 | ||
FI | 27.05.2015 | ||
HR | 27.05.2015 | ||
IT | 27.05.2015 | ||
LT | 27.05.2015 | ||
LV | 27.05.2015 | ||
MC | 27.05.2015 | ||
PL | 27.05.2015 | ||
RO | 27.05.2015 | ||
RS | 27.05.2015 | ||
SK | 27.05.2015 | ||
LU | 21.07.2015 | ||
BG | 27.08.2015 | ||
NO | 27.08.2015 | ||
GR | 28.08.2015 | ||
IS | 27.09.2015 | ||
PT | 28.09.2015 | ||
Former [2016/15] | AT | 27.05.2015 | |
CZ | 27.05.2015 | ||
DK | 27.05.2015 | ||
EE | 27.05.2015 | ||
ES | 27.05.2015 | ||
FI | 27.05.2015 | ||
HR | 27.05.2015 | ||
LT | 27.05.2015 | ||
LV | 27.05.2015 | ||
MC | 27.05.2015 | ||
PL | 27.05.2015 | ||
RO | 27.05.2015 | ||
RS | 27.05.2015 | ||
SK | 27.05.2015 | ||
LU | 21.07.2015 | ||
BG | 27.08.2015 | ||
NO | 27.08.2015 | ||
GR | 28.08.2015 | ||
IS | 27.09.2015 | ||
PT | 28.09.2015 | ||
Former [2016/13] | AT | 27.05.2015 | |
CZ | 27.05.2015 | ||
DK | 27.05.2015 | ||
EE | 27.05.2015 | ||
ES | 27.05.2015 | ||
FI | 27.05.2015 | ||
HR | 27.05.2015 | ||
LT | 27.05.2015 | ||
LV | 27.05.2015 | ||
MC | 27.05.2015 | ||
PL | 27.05.2015 | ||
RO | 27.05.2015 | ||
RS | 27.05.2015 | ||
SK | 27.05.2015 | ||
BG | 27.08.2015 | ||
NO | 27.08.2015 | ||
GR | 28.08.2015 | ||
IS | 27.09.2015 | ||
PT | 28.09.2015 | ||
Former [2016/10] | AT | 27.05.2015 | |
CZ | 27.05.2015 | ||
DK | 27.05.2015 | ||
EE | 27.05.2015 | ||
ES | 27.05.2015 | ||
FI | 27.05.2015 | ||
HR | 27.05.2015 | ||
LT | 27.05.2015 | ||
LV | 27.05.2015 | ||
PL | 27.05.2015 | ||
RO | 27.05.2015 | ||
RS | 27.05.2015 | ||
SK | 27.05.2015 | ||
BG | 27.08.2015 | ||
NO | 27.08.2015 | ||
GR | 28.08.2015 | ||
IS | 27.09.2015 | ||
PT | 28.09.2015 | ||
Former [2016/09] | AT | 27.05.2015 | |
DK | 27.05.2015 | ||
EE | 27.05.2015 | ||
ES | 27.05.2015 | ||
FI | 27.05.2015 | ||
HR | 27.05.2015 | ||
LT | 27.05.2015 | ||
LV | 27.05.2015 | ||
RS | 27.05.2015 | ||
BG | 27.08.2015 | ||
NO | 27.08.2015 | ||
GR | 28.08.2015 | ||
IS | 27.09.2015 | ||
PT | 28.09.2015 | ||
Former [2016/07] | AT | 27.05.2015 | |
DK | 27.05.2015 | ||
ES | 27.05.2015 | ||
FI | 27.05.2015 | ||
HR | 27.05.2015 | ||
LT | 27.05.2015 | ||
LV | 27.05.2015 | ||
RS | 27.05.2015 | ||
BG | 27.08.2015 | ||
NO | 27.08.2015 | ||
GR | 28.08.2015 | ||
IS | 27.09.2015 | ||
PT | 28.09.2015 | ||
Former [2015/51] | AT | 27.05.2015 | |
ES | 27.05.2015 | ||
FI | 27.05.2015 | ||
HR | 27.05.2015 | ||
LT | 27.05.2015 | ||
LV | 27.05.2015 | ||
RS | 27.05.2015 | ||
BG | 27.08.2015 | ||
NO | 27.08.2015 | ||
GR | 28.08.2015 | ||
IS | 27.09.2015 | ||
PT | 28.09.2015 | ||
Former [2015/50] | ES | 27.05.2015 | |
FI | 27.05.2015 | ||
HR | 27.05.2015 | ||
LT | 27.05.2015 | ||
LV | 27.05.2015 | ||
RS | 27.05.2015 | ||
BG | 27.08.2015 | ||
NO | 27.08.2015 | ||
GR | 28.08.2015 | ||
IS | 27.09.2015 | ||
PT | 28.09.2015 | ||
Former [2015/49] | ES | 27.05.2015 | |
FI | 27.05.2015 | ||
HR | 27.05.2015 | ||
LT | 27.05.2015 | ||
LV | 27.05.2015 | ||
RS | 27.05.2015 | ||
NO | 27.08.2015 | ||
GR | 28.08.2015 | ||
PT | 28.09.2015 | Documents cited: | Search | [XY] - Valeria D'amico ET AL, "EU FP7 INFSO-ICT-247223 ARTIST4G, D1.2 Innovative advanced signal processing algorithms for interference avoidance", (20101231), URL: http://publications.lib.chalmers.se/publication/134553-eu-fp7-infso-ict-247223-artist4g-d12-innovative-advanced-signal-processing-algorithms-for-interferen, (20140110), XP055095668 [X] 1,13 * paragraph 4.3 * * page 71, lines 24-25 * * page 72, lines 16-19, 35-38 * * Figure 4.37 * [Y] 2,3,14,15 | [XY] - Carmen Botella ET AL, "EU FP7 INFSO-ICT-247223 ARTIST4G, D1.3 Innovative scheduling and cross-layer design techniques for interference avoidance", (20110331), URL: http://publications.lib.chalmers.se/publication/153474-eu-fp7-infso-ict-247223-artist4g-d13-innovative-scheduling-and-cross-layer-design-techniques-for-int, (20140110), XP055095669 [X] 1,13 * page 11, lines 43-46 * * page 12, lines 1-3 * * page 50, lines 17-27 * * page 61, lines 1-6 and 23-44 * * page 62, lines 12-20 * * Figure 3-1 * * Figure 4-28 * [Y] 2,3,14,15 | [Y] - THOMAS NOVLAN ET AL, "Comparison of Fractional Frequency Reuse Approaches in the OFDMA Cellular Downlink", GLOBECOM 2010, 2010 IEEE GLOBAL TELECOMMUNICATIONS CONFERENCE, IEEE, PISCATAWAY, NJ, USA, (20101206), ISBN 978-1-4244-5636-9, pages 1 - 5, XP031846484 [Y] 2,3,14,15 * page 3, column 2, line 28 - line 31 * | [A] - VALERIA D'AMICO ET AL, "Advanced interference management in ARTIST4G: Interference avoidance", WIRELESS TECHNOLOGY CONFERENCE (EUWIT), 2010 EUROPEAN, IEEE, PISCATAWAY, NJ, USA, (20100927), ISBN 978-1-4244-7233-8, pages 21 - 24, XP031784714 [A] 1-20 * section II.A * | [A] - HUAWEI ET AL, "Some Clarifications on Soft Frequency Reuse Scheme", 3GPP DRAFT; R1-060229, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20060119), vol. RAN WG1, no. Helsinki, Finland; 20060123, XP050417557 [A] 1-20 * paragraph 2 * | [A] - STEPHAN SAUR ET AL, "Exploring the vertical dimension of dynamic beam steering", MULTI-CARRIER SYSTEMS&SOLUTIONS (MC-SS), 2011 8TH INTERNATIONAL WORKSHOP ON, IEEE, (20110503), doi:10.1109/MC-SS.2011.5910725, ISBN 978-1-61284-885-3, pages 1 - 5, XP031947916 [A] 1-20 * section I * * section II * * section IV * DOI: http://dx.doi.org/10.1109/MC-SS.2011.5910725 | International search | [A]CN101247624 (BEIJING SAMSUNG COMM TECH RES [CN]); | [A]CN101316433 (ZTE CORP [CN]); | [A]CN101404800 (UNIV BEIJING POSTS & TELECOMM [CN]) |