EP2621226 - COMMUNICATION METHOD, USER EQUIPMENT, BASE STATION AND COMMUNICATION DEVICE [Right-click to bookmark this link] | Status | The application has been withdrawn Status updated on 28.08.2015 Database last updated on 12.07.2024 | Most recent event Tooltip | 28.08.2015 | Withdrawal of application | published on 30.09.2015 [2015/40] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [N/P] |
Former [2013/31] | For all designated states Huawei Technologies Co., Ltd Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | Inventor(s) | 01 /
ZHONG, Yi Huawei Administration Building Bantian, Longgang District Shenzhen Guangdong 518129 / CN | 02 /
LI, Shuang Huawei Administration Building Bantian, Longgang District Shenzhen Guangdong 518129 / CN | 03 /
YANG, Dongli Huawei Administration Building Bantian, Longgang District Shenzhen Guangdong 518129 / CN | 04 /
WANG, Jinling Huawei Administration Building Bantian, Longgang District Shenzhen Guangdong 518129 / CN | [2013/31] | Representative(s) | Epping - Hermann - Fischer Patentanwaltsgesellschaft mbH Schlossschmidstrasse 5 80639 München / DE | [N/P] |
Former [2013/31] | Epping - Hermann - Fischer Patentanwaltsgesellschaft mbH Ridlerstrasse 55 80339 München / DE | Application number, filing date | 11867487.8 | 10.11.2011 | WO2011CN82062 | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2012167544 | Date: | 13.12.2012 | Language: | ZH | [2012/50] | Type: | A1 Application with search report | No.: | EP2621226 | Date: | 31.07.2013 | Language: | EN | [2013/31] | Search report(s) | International search report - published on: | CN | 13.12.2012 | (Supplementary) European search report - dispatched on: | EP | 15.11.2013 | Classification | IPC: | H04W56/00 | [2013/31] | CPC: |
H04W74/0833 (EP,US);
H04L1/1812 (US);
H04W56/0045 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2013/31] | Title | German: | KOMMUNIKATIONSVERFAHREN, BENUTZERVORRICHTUNG, BASISSTATION UND KOMMUNIKATIONSVORRICHTUNG | [2013/31] | English: | COMMUNICATION METHOD, USER EQUIPMENT, BASE STATION AND COMMUNICATION DEVICE | [2013/31] | French: | PROCÉDÉ DE COMMUNICATION, ÉQUIPEMENT D'UTILISATEUR, STATION DE BASE ET DISPOSITIF DE COMMUNICATION | [2013/31] | Entry into regional phase | 25.04.2013 | Translation filed | 25.04.2013 | National basic fee paid | 25.04.2013 | Search fee paid | 25.04.2013 | Designation fee(s) paid | 25.04.2013 | Examination fee paid | Examination procedure | 25.04.2013 | Examination requested [2013/31] | 21.05.2014 | Amendment by applicant (claims and/or description) | 01.12.2014 | Despatch of a communication from the examining division (Time limit: M04) | 24.03.2015 | Reply to a communication from the examining division | 21.08.2015 | Application withdrawn by applicant [2015/40] | 21.08.2015 | Cancellation of oral proceeding that was planned for 26.11.2015 | 26.11.2015 | Date of oral proceedings (cancelled) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 01.12.2014 | Fees paid | Renewal fee | 22.11.2013 | Renewal fee patent year 03 | 21.11.2014 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [XI] - ALCATEL-LUCENT ET AL, "Analysis of impact of cell range extension", 3GPP DRAFT; R1-093762, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20091012), no. Miyazaki; 20091012, XP050388283 [X] 1,2,5,6,9,10,12,13,15 * paragraph [02.1] - paragraph [02.3] * [I] 3,4,7,8,11,14 | [A] - MSTAR SEMICONDUCTOR, "Specification of TDD LTE Maximum Timing Advance", 3GPP DRAFT; R4-116005_LTE_TDD_MAXTA, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20111107), vol. TSG RAN, no. San Francisco; 20111114 - 20111118, XP050567338 [A] 1-15 * page 1 - page 3 * | [A] - ZTE, "Simplified MAC RAR for dedicated preamble", 3GPP DRAFT; R2-093876 SIMPLIFIED MAC RAR FOR DEDICATED PREAMBLE, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20090623), no. Los Angeles, USA; 20090623, XP050352080 [A] 1-15 * page 1 - page 3 * | International search | [A]CN1378761 (ERICSSON INC [US]); | [X]CN101904212 (QUALCOMM INC); | [X]CN101990295 (TD TECH COMMUNICATION TECH LTD) |