EP2732663 - METHOD OF CELL SEARCH IN WIRELESS COMMUNICATION SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 29.03.2019 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 20.04.2018 | ||
Former | Grant of patent is intended Status updated on 13.04.2018 | ||
Former | Examination is in progress Status updated on 13.03.2018 | ||
Former | Grant of patent is intended Status updated on 26.10.2017 | ||
Former | Examination is in progress Status updated on 28.04.2017 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): IS | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2018/21] |
Former [2014/21] | For all designated states Huawei Technologies Co., Ltd Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | Inventor(s) | 01 /
BERGGREN, Fredrik Solbergsvagen 41 S-194 57 Upplands Vasby / SE | [2014/21] | Representative(s) | Körber, Martin Hans Mitscherlich PartmbB Patent- und Rechtsanwälte Sonnenstrasse 33 80331 München / DE | [2014/21] | Application number, filing date | 11867550.3 | 11.07.2011 | [2018/21] | WO2011CN77021 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2012167471 | Date: | 13.12.2012 | Language: | EN | [2012/50] | Type: | A1 Application with search report | No.: | EP2732663 | Date: | 21.05.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 13.12.2012 takes the place of the publication of the European patent application. | [2014/21] | Type: | B1 Patent specification | No.: | EP2732663 | Date: | 23.05.2018 | Language: | EN | [2018/21] | Search report(s) | International search report - published on: | CN | 13.12.2012 | (Supplementary) European search report - dispatched on: | EP | 07.04.2014 | Classification | IPC: | H04W48/16, H04J11/00, // H04L5/00, H04W56/00, H04L27/26, H04L25/02 | [2017/45] | CPC: |
H04W48/16 (EP,US);
H04J11/0069 (EP,US);
H04L27/2662 (EP,US);
H04L5/001 (EP,US);
H04L5/0053 (EP,US);
H04L5/0094 (EP,US);
H04W56/001 (EP,US);
H04W56/0015 (EP,US);
H04W56/0055 (EP,US);
|
Former IPC [2014/21] | H04W48/16, H04J11/00, // H04L5/00, H04W56/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/21] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ZELLENSUCHVERFAHREN IN EINEM DRAHTLOSEN KOMMUNIKATIONSSYSTEMEN | [2014/21] | English: | METHOD OF CELL SEARCH IN WIRELESS COMMUNICATION SYSTEM | [2014/21] | French: | PROCÉDÉ DE RECHERCHE DE CELLULE DANS UN SYSTÈME DE RADIOCOMMUNICATIONS | [2014/21] | Entry into regional phase | 17.01.2014 | National basic fee paid | 17.01.2014 | Search fee paid | 17.01.2014 | Designation fee(s) paid | 17.01.2014 | Examination fee paid | Examination procedure | 17.01.2014 | Examination requested [2014/21] | 11.06.2014 | Amendment by applicant (claims and/or description) | 03.05.2017 | Despatch of a communication from the examining division (Time limit: M04) | 06.09.2017 | Reply to a communication from the examining division | 27.10.2017 | Communication of intention to grant the patent | 27.01.2018 | Fee for grant paid | 27.01.2018 | Fee for publishing/printing paid | 06.03.2018 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 13.04.2018 | Information about intention to grant a patent | 13.04.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 03.05.2017 | Opposition(s) | 26.02.2019 | No opposition filed within time limit [2019/18] | Fees paid | Renewal fee | 17.01.2014 | Renewal fee patent year 03 | 29.07.2014 | Renewal fee patent year 04 | 29.07.2015 | Renewal fee patent year 05 | 27.07.2016 | Renewal fee patent year 06 | 28.07.2017 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.07.2011 | AL | 23.05.2018 | AT | 23.05.2018 | CY | 23.05.2018 | CZ | 23.05.2018 | DK | 23.05.2018 | EE | 23.05.2018 | ES | 23.05.2018 | FI | 23.05.2018 | HR | 23.05.2018 | IT | 23.05.2018 | LT | 23.05.2018 | LV | 23.05.2018 | MC | 23.05.2018 | MK | 23.05.2018 | NL | 23.05.2018 | PL | 23.05.2018 | PT | 23.05.2018 | RO | 23.05.2018 | RS | 23.05.2018 | SE | 23.05.2018 | SI | 23.05.2018 | SK | 23.05.2018 | SM | 23.05.2018 | TR | 23.05.2018 | IE | 11.07.2018 | LU | 11.07.2018 | MT | 11.07.2018 | FR | 23.07.2018 | BE | 31.07.2018 | CH | 31.07.2018 | LI | 31.07.2018 | BG | 23.08.2018 | NO | 23.08.2018 | GR | 24.08.2018 | IS | 23.09.2018 | [2020/33] |
Former [2020/31] | HU | 11.07.2011 | |
AL | 23.05.2018 | ||
AT | 23.05.2018 | ||
CY | 23.05.2018 | ||
CZ | 23.05.2018 | ||
DK | 23.05.2018 | ||
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
IT | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
MC | 23.05.2018 | ||
MK | 23.05.2018 | ||
NL | 23.05.2018 | ||
PL | 23.05.2018 | ||
PT | 23.05.2018 | ||
RO | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
SI | 23.05.2018 | ||
SK | 23.05.2018 | ||
SM | 23.05.2018 | ||
TR | 23.05.2018 | ||
IE | 11.07.2018 | ||
LU | 11.07.2018 | ||
MT | 11.07.2018 | ||
FR | 23.07.2018 | ||
BE | 31.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
Former [2020/28] | HU | 11.07.2011 | |
AL | 23.05.2018 | ||
AT | 23.05.2018 | ||
CZ | 23.05.2018 | ||
DK | 23.05.2018 | ||
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
IT | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
MC | 23.05.2018 | ||
NL | 23.05.2018 | ||
PL | 23.05.2018 | ||
PT | 23.05.2018 | ||
RO | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
SI | 23.05.2018 | ||
SK | 23.05.2018 | ||
SM | 23.05.2018 | ||
TR | 23.05.2018 | ||
IE | 11.07.2018 | ||
LU | 11.07.2018 | ||
MT | 11.07.2018 | ||
FR | 23.07.2018 | ||
BE | 31.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
Former [2020/16] | AL | 23.05.2018 | |
AT | 23.05.2018 | ||
CZ | 23.05.2018 | ||
DK | 23.05.2018 | ||
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
IT | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
MC | 23.05.2018 | ||
NL | 23.05.2018 | ||
PL | 23.05.2018 | ||
RO | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
SI | 23.05.2018 | ||
SK | 23.05.2018 | ||
SM | 23.05.2018 | ||
TR | 23.05.2018 | ||
IE | 11.07.2018 | ||
LU | 11.07.2018 | ||
MT | 11.07.2018 | ||
FR | 23.07.2018 | ||
BE | 31.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
Former [2020/08] | AL | 23.05.2018 | |
AT | 23.05.2018 | ||
CZ | 23.05.2018 | ||
DK | 23.05.2018 | ||
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
IT | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
MC | 23.05.2018 | ||
NL | 23.05.2018 | ||
PL | 23.05.2018 | ||
RO | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
SI | 23.05.2018 | ||
SK | 23.05.2018 | ||
SM | 23.05.2018 | ||
IE | 11.07.2018 | ||
LU | 11.07.2018 | ||
MT | 11.07.2018 | ||
FR | 23.07.2018 | ||
BE | 31.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
Former [2019/51] | AL | 23.05.2018 | |
AT | 23.05.2018 | ||
CZ | 23.05.2018 | ||
DK | 23.05.2018 | ||
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
IT | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
MC | 23.05.2018 | ||
NL | 23.05.2018 | ||
PL | 23.05.2018 | ||
RO | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
SI | 23.05.2018 | ||
SK | 23.05.2018 | ||
SM | 23.05.2018 | ||
IE | 11.07.2018 | ||
LU | 11.07.2018 | ||
FR | 23.07.2018 | ||
BE | 31.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
Former [2019/26] | AT | 23.05.2018 | |
CZ | 23.05.2018 | ||
DK | 23.05.2018 | ||
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
IT | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
MC | 23.05.2018 | ||
NL | 23.05.2018 | ||
PL | 23.05.2018 | ||
RO | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
SI | 23.05.2018 | ||
SK | 23.05.2018 | ||
SM | 23.05.2018 | ||
IE | 11.07.2018 | ||
LU | 11.07.2018 | ||
FR | 23.07.2018 | ||
BE | 31.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
Former [2019/23] | AT | 23.05.2018 | |
CZ | 23.05.2018 | ||
DK | 23.05.2018 | ||
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
IT | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
MC | 23.05.2018 | ||
NL | 23.05.2018 | ||
PL | 23.05.2018 | ||
RO | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
SK | 23.05.2018 | ||
SM | 23.05.2018 | ||
IE | 11.07.2018 | ||
LU | 11.07.2018 | ||
FR | 23.07.2018 | ||
BE | 31.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
Former [2019/21] | AT | 23.05.2018 | |
CZ | 23.05.2018 | ||
DK | 23.05.2018 | ||
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
IT | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
MC | 23.05.2018 | ||
NL | 23.05.2018 | ||
PL | 23.05.2018 | ||
RO | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
SK | 23.05.2018 | ||
SM | 23.05.2018 | ||
IE | 11.07.2018 | ||
LU | 11.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
Former [2019/19] | AT | 23.05.2018 | |
CZ | 23.05.2018 | ||
DK | 23.05.2018 | ||
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
IT | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
MC | 23.05.2018 | ||
NL | 23.05.2018 | ||
PL | 23.05.2018 | ||
RO | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
SK | 23.05.2018 | ||
SM | 23.05.2018 | ||
IE | 11.07.2018 | ||
LU | 11.07.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
Former [2019/17] | AT | 23.05.2018 | |
CZ | 23.05.2018 | ||
DK | 23.05.2018 | ||
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
IT | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
MC | 23.05.2018 | ||
NL | 23.05.2018 | ||
PL | 23.05.2018 | ||
RO | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
SK | 23.05.2018 | ||
SM | 23.05.2018 | ||
LU | 11.07.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
Former [2019/15] | AT | 23.05.2018 | |
CZ | 23.05.2018 | ||
DK | 23.05.2018 | ||
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
IT | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
MC | 23.05.2018 | ||
NL | 23.05.2018 | ||
PL | 23.05.2018 | ||
RO | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
SK | 23.05.2018 | ||
SM | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
Former [2019/11] | AT | 23.05.2018 | |
CZ | 23.05.2018 | ||
DK | 23.05.2018 | ||
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
IT | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
NL | 23.05.2018 | ||
PL | 23.05.2018 | ||
RO | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
SK | 23.05.2018 | ||
SM | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
Former [2019/10] | AT | 23.05.2018 | |
CZ | 23.05.2018 | ||
DK | 23.05.2018 | ||
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
NL | 23.05.2018 | ||
PL | 23.05.2018 | ||
RO | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
SK | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
Former [2019/09] | DK | 23.05.2018 | |
EE | 23.05.2018 | ||
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
NL | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
Former [2019/08] | DK | 23.05.2018 | |
ES | 23.05.2018 | ||
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
NL | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
Former [2018/52] | ES | 23.05.2018 | |
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
NL | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
GR | 24.08.2018 | ||
Former [2018/51] | ES | 23.05.2018 | |
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
LT | 23.05.2018 | ||
LV | 23.05.2018 | ||
RS | 23.05.2018 | ||
SE | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
Former [2018/50] | ES | 23.05.2018 | |
FI | 23.05.2018 | ||
HR | 23.05.2018 | ||
LT | 23.05.2018 | ||
SE | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
Former [2018/49] | ES | 23.05.2018 | |
FI | 23.05.2018 | ||
LT | 23.05.2018 | ||
SE | 23.05.2018 | ||
BG | 23.08.2018 | ||
NO | 23.08.2018 | ||
Former [2018/47] | ES | 23.05.2018 | |
FI | 23.05.2018 | ||
LT | 23.05.2018 | ||
NO | 23.08.2018 | Documents cited: | Search | [A]US2007091785 (LINDOFF BENGT [SE], et al) [A] 1-15 * abstract * * paragraphs [0003] , [0004] , [0008] , [0015] , [0016] , [0022] - [0025] - [0027] , [0029] , [0030] * * figures 2,4 *; | [Y]US2009316659 (LINDOFF BENGT [SE], et al) [Y] 1-15 * abstract * * paragraphs [0013] , [0014] , [0017] - [0019] - [0037] , [0039] - [0042] - [0050] - [0051] - [0053] , [0056] * * figures 3,5 *; | [Y]EP2315473 (NTT DOCOMO INC [JP]) [Y] 1-15 * abstract * * paragraphs [0001] , [0006] - [0011] - [0022] - [0025] - [0028] , [0073] , [0081] , [0085] - [0094] - [0104] - [0114] - [0118] , [0123] * * figures 13,14 *; | [A] - RAN4, "Reply to LS on DL timing difference and DL timing reference in Carrier Aggregation", 3GPP DRAFT; R4-102579, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20100623), vol. RAN WG4, no. Bratislava; 20100628, XP050454732 [A] 1-15 * section 1b * | [A] - HUAWEI ET AL, "Discussion on CA-based HetNet", 3GPP DRAFT; R1-111381, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20110503), vol. RAN WG1, no. Barcelona, Spain; 20110509, XP050491090 [A] 1-15 * sections 3.1, 3.2 * | International search | [X]WO2009153165 (ERICSSON TELEFON AB L M [SE], et al); | [A]WO2010147444 (LG ELECTRONICS INC [KR], et al); | [X] - ERICSSON ET AL., "Remaining Details for CA-based HetNets", 3GPP TSG RAN WG1, R1-110031, (20110121), URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_63b/Docs/, XP050490012 | [X] - HUAWEI ET AL., "Discussion on CA-based HetNet", 3GPP TSG RAN WG1, R1-111381, (20110513), URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_65/Docs/, XP050491090 | by applicant | US2009316659 | EP2315473 |