EP2508210 - Plastic mouldable biodegradable hemostyptic [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 09.11.2018 Database last updated on 13.07.2024 | |
Former | The patent has been granted Status updated on 01.12.2017 | ||
Former | Grant of patent is intended Status updated on 12.10.2017 | ||
Former | Examination is in progress Status updated on 02.11.2016 | Most recent event Tooltip | 26.06.2020 | Lapse of the patent in a contracting state New state(s): MK | published on 29.07.2020 [2020/31] | Applicant(s) | For all designated states Heraeus Medical GmbH Philipp-Reis-Strasse 8/13 61273 Wehrheim / DE | [2012/41] | Inventor(s) | 01 /
Vogt, Sebastian Gamstädter Weg 11 99092 Erfurt / DE | [2012/41] | Representative(s) | Heraeus IP Heraeus Business Solutions GmbH Intellectual Property Heraeusstraße 12-14 63450 Hanau / DE | [N/P] |
Former [2018/01] | Heraeus IP Heraeus Holding GmbH Schutzrechte Heraeusstraße 12-14 63450 Hanau / DE | ||
Former [2012/41] | Brand, Normen Heraeus Holding GmbH Schutzrechte Heraeusstraße 12-14 63450 Hanau / DE | Application number, filing date | 12001660.5 | 10.03.2012 | [2012/41] | Priority number, date | DE20111016277 | 06.04.2011 Original published format: DE102011016277 | [2012/41] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | EP2508210 | Date: | 10.10.2012 | Language: | DE | [2012/41] | Type: | A3 Search report | No.: | EP2508210 | Date: | 29.10.2014 | Language: | DE | [2014/44] | Type: | B1 Patent specification | No.: | EP2508210 | Date: | 03.01.2018 | Language: | DE | [2018/01] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 26.09.2014 | Classification | IPC: | A61L24/00 | [2012/41] | CPC: |
A61L24/0042 (EP,US);
A61L24/0015 (EP,US);
A61L24/046 (US);
A61L27/28 (EP,US);
A61P41/00 (EP);
A61P43/00 (EP);
A61P7/04 (EP);
A61L2300/404 (EP,US);
A61L2300/406 (US);
A61L2300/418 (EP,US);
A61L2300/45 (US);
A61L2300/606 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2012/41] | Title | German: | Plastisch verformbares, biodegradierbares Hämostyptikum | [2012/41] | English: | Plastic mouldable biodegradable hemostyptic | [2012/41] | French: | Hémostyptique préformé en plastique biodégradable | [2012/41] | Examination procedure | 22.03.2012 | Examination requested [2012/41] | 16.06.2015 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 07.08.2015 | Amendment by applicant (claims and/or description) | 24.10.2016 | Despatch of a communication from the examining division (Time limit: M06) | 24.04.2017 | Reply to a communication from the examining division | 13.10.2017 | Communication of intention to grant the patent | 22.11.2017 | Fee for grant paid | 22.11.2017 | Fee for publishing/printing paid | 22.11.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 24.10.2016 | Opposition(s) | 05.10.2018 | No opposition filed within time limit [2018/50] | Request for further processing for: | The application is deemed to be withdrawn due to failure to indicate the wish to proceed further with the application | 07.08.2015 | Request for further processing filed | 07.08.2015 | Full payment received (date of receipt of payment) Request granted | 03.09.2015 | Decision despatched | The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report | 07.08.2015 | Request for further processing filed | 07.08.2015 | Full payment received (date of receipt of payment) Request granted | 03.09.2015 | Decision despatched | Fees paid | Renewal fee | 21.03.2014 | Renewal fee patent year 03 | 24.03.2015 | Renewal fee patent year 04 | 25.03.2016 | Renewal fee patent year 05 | 24.03.2017 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.03.2012 | AL | 03.01.2018 | CY | 03.01.2018 | CZ | 03.01.2018 | DK | 03.01.2018 | EE | 03.01.2018 | ES | 03.01.2018 | FI | 03.01.2018 | HR | 03.01.2018 | LT | 03.01.2018 | LV | 03.01.2018 | MC | 03.01.2018 | MK | 03.01.2018 | MT | 03.01.2018 | PL | 03.01.2018 | PT | 03.01.2018 | RO | 03.01.2018 | RS | 03.01.2018 | SI | 03.01.2018 | SK | 03.01.2018 | SM | 03.01.2018 | TR | 03.01.2018 | AT | 10.03.2018 | IE | 10.03.2018 | LU | 10.03.2018 | BE | 31.03.2018 | BG | 03.04.2018 | NO | 03.04.2018 | GR | 04.04.2018 | IS | 03.05.2018 | [2020/31] |
Former [2020/27] | HU | 10.03.2012 | |
AL | 03.01.2018 | ||
CY | 03.01.2018 | ||
CZ | 03.01.2018 | ||
DK | 03.01.2018 | ||
EE | 03.01.2018 | ||
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
LV | 03.01.2018 | ||
MC | 03.01.2018 | ||
MT | 03.01.2018 | ||
PL | 03.01.2018 | ||
PT | 03.01.2018 | ||
RO | 03.01.2018 | ||
RS | 03.01.2018 | ||
SI | 03.01.2018 | ||
SK | 03.01.2018 | ||
SM | 03.01.2018 | ||
TR | 03.01.2018 | ||
AT | 10.03.2018 | ||
IE | 10.03.2018 | ||
LU | 10.03.2018 | ||
BE | 31.03.2018 | ||
BG | 03.04.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
IS | 03.05.2018 | ||
Former [2020/16] | AL | 03.01.2018 | |
CY | 03.01.2018 | ||
CZ | 03.01.2018 | ||
DK | 03.01.2018 | ||
EE | 03.01.2018 | ||
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
LV | 03.01.2018 | ||
MC | 03.01.2018 | ||
MT | 03.01.2018 | ||
PL | 03.01.2018 | ||
RO | 03.01.2018 | ||
RS | 03.01.2018 | ||
SI | 03.01.2018 | ||
SK | 03.01.2018 | ||
SM | 03.01.2018 | ||
TR | 03.01.2018 | ||
AT | 10.03.2018 | ||
IE | 10.03.2018 | ||
LU | 10.03.2018 | ||
BE | 31.03.2018 | ||
BG | 03.04.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
IS | 03.05.2018 | ||
Former [2019/46] | AL | 03.01.2018 | |
CY | 03.01.2018 | ||
CZ | 03.01.2018 | ||
DK | 03.01.2018 | ||
EE | 03.01.2018 | ||
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
LV | 03.01.2018 | ||
MC | 03.01.2018 | ||
MT | 03.01.2018 | ||
PL | 03.01.2018 | ||
RO | 03.01.2018 | ||
RS | 03.01.2018 | ||
SI | 03.01.2018 | ||
SK | 03.01.2018 | ||
SM | 03.01.2018 | ||
AT | 10.03.2018 | ||
IE | 10.03.2018 | ||
LU | 10.03.2018 | ||
BE | 31.03.2018 | ||
BG | 03.04.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
IS | 03.05.2018 | ||
Former [2019/12] | AL | 03.01.2018 | |
CY | 03.01.2018 | ||
CZ | 03.01.2018 | ||
DK | 03.01.2018 | ||
EE | 03.01.2018 | ||
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
LV | 03.01.2018 | ||
MC | 03.01.2018 | ||
MT | 03.01.2018 | ||
PL | 03.01.2018 | ||
RO | 03.01.2018 | ||
RS | 03.01.2018 | ||
SI | 03.01.2018 | ||
SK | 03.01.2018 | ||
SM | 03.01.2018 | ||
IE | 10.03.2018 | ||
LU | 10.03.2018 | ||
BE | 31.03.2018 | ||
BG | 03.04.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
IS | 03.05.2018 | ||
Former [2019/09] | AL | 03.01.2018 | |
CY | 03.01.2018 | ||
CZ | 03.01.2018 | ||
DK | 03.01.2018 | ||
EE | 03.01.2018 | ||
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
LV | 03.01.2018 | ||
MC | 03.01.2018 | ||
MT | 03.01.2018 | ||
PL | 03.01.2018 | ||
RO | 03.01.2018 | ||
RS | 03.01.2018 | ||
SK | 03.01.2018 | ||
SM | 03.01.2018 | ||
IE | 10.03.2018 | ||
LU | 10.03.2018 | ||
BG | 03.04.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
IS | 03.05.2018 | ||
Former [2019/04] | AL | 03.01.2018 | |
CY | 03.01.2018 | ||
CZ | 03.01.2018 | ||
DK | 03.01.2018 | ||
EE | 03.01.2018 | ||
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
LV | 03.01.2018 | ||
MC | 03.01.2018 | ||
MT | 03.01.2018 | ||
PL | 03.01.2018 | ||
RO | 03.01.2018 | ||
RS | 03.01.2018 | ||
SK | 03.01.2018 | ||
SM | 03.01.2018 | ||
LU | 10.03.2018 | ||
BG | 03.04.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
IS | 03.05.2018 | ||
Former [2018/52] | AL | 03.01.2018 | |
CY | 03.01.2018 | ||
CZ | 03.01.2018 | ||
DK | 03.01.2018 | ||
EE | 03.01.2018 | ||
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
LV | 03.01.2018 | ||
MC | 03.01.2018 | ||
MT | 03.01.2018 | ||
PL | 03.01.2018 | ||
RO | 03.01.2018 | ||
RS | 03.01.2018 | ||
SK | 03.01.2018 | ||
SM | 03.01.2018 | ||
BG | 03.04.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
IS | 03.05.2018 | ||
Former [2018/51] | AL | 03.01.2018 | |
CY | 03.01.2018 | ||
CZ | 03.01.2018 | ||
DK | 03.01.2018 | ||
EE | 03.01.2018 | ||
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
LV | 03.01.2018 | ||
MT | 03.01.2018 | ||
PL | 03.01.2018 | ||
RO | 03.01.2018 | ||
RS | 03.01.2018 | ||
SK | 03.01.2018 | ||
BG | 03.04.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
IS | 03.05.2018 | ||
Former [2018/50] | AL | 03.01.2018 | |
CY | 03.01.2018 | ||
CZ | 03.01.2018 | ||
EE | 03.01.2018 | ||
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
LV | 03.01.2018 | ||
MT | 03.01.2018 | ||
PL | 03.01.2018 | ||
RO | 03.01.2018 | ||
RS | 03.01.2018 | ||
SK | 03.01.2018 | ||
BG | 03.04.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
IS | 03.05.2018 | ||
Former [2018/46] | AL | 03.01.2018 | |
CY | 03.01.2018 | ||
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
LV | 03.01.2018 | ||
MT | 03.01.2018 | ||
PL | 03.01.2018 | ||
RS | 03.01.2018 | ||
BG | 03.04.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
IS | 03.05.2018 | ||
Former [2018/43] | CY | 03.01.2018 | |
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
LV | 03.01.2018 | ||
MT | 03.01.2018 | ||
PL | 03.01.2018 | ||
RS | 03.01.2018 | ||
BG | 03.04.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
IS | 03.05.2018 | ||
Former [2018/40] | CY | 03.01.2018 | |
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
LV | 03.01.2018 | ||
PL | 03.01.2018 | ||
RS | 03.01.2018 | ||
BG | 03.04.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
IS | 03.05.2018 | ||
Former [2018/39] | CY | 03.01.2018 | |
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
LV | 03.01.2018 | ||
PL | 03.01.2018 | ||
RS | 03.01.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
IS | 03.05.2018 | ||
Former [2018/37] | CY | 03.01.2018 | |
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
PL | 03.01.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
Former [2018/36] | CY | 03.01.2018 | |
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
PL | 03.01.2018 | ||
NO | 03.04.2018 | ||
Former [2018/35] | CY | 03.01.2018 | |
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
NO | 03.04.2018 | Documents cited: | Search | [Y]US2006002976 (KRONENTHAL RICHARD L [US]) [Y] 1-17 * paragraph [0037] * * paragraph [0040] * * paragraph [0041] * * paragraph [0042] * * paragraph [0048] - paragraph [0049] * * paragraph [0053] * * paragraph [0057] * * paragraph [0064] * * paragraph [0066] * * paragraph [0067] *; | [IY]DE102005002703 (HERAEUS KULZER GMBH [DE]) [I] 18 * paragraph [0011] - paragraph [0012] * * paragraph [0014] - paragraph [0015] * * paragraph [0017] * [Y] 1-8,10-17; | [Y]US5681873 (NORTON RICHARD L [US], et al) [Y] 9 * column 3, lines 57-66 * * column 4, lines 40-49 * * column 6, lines 44-56 *; | [A]DE102004060666 (HERAEUS KULZER GMBH [DE]) [A] 1-18 * paragraph [0009] - paragraph [0010] * | by applicant | EP0109310 | US4595713 | DE3229540 | DE19858889 | EP1142597 | US2009286886 | US2011002974 | - S. E. KATZ; J. ROTMANN, "Adverse effects of bone wax in surgery of the orbit", OPHTHAL PLAST. RECONSTR., (1996), vol. 12, no. 2, pages 121 - 126 | - M. LAVIGNE ET AL., "Bone-wax granuloma after femoral neckosteoplasty", CAN. J. SURG., (2008), vol. 51, no. 3, pages E58 - 60 | - R. T. ALLISON, "Foreign body reactions and an associated histological artifact due to bone wax", BR. J. BIOMED. SCI., (1994), vol. 51, no. 1, pages 14 - 17 | - O. ESER ET AL., "Bone wax as a cause offoreign body reaction after lumbar disc surgery: A case report", ADV. THER., (2007), vol. 24, no. 3, pages 594 - 7 | - A. SUWAN ET AL., "Controversial role of two different local haemostatic agents on bone healing", J. AM SCI., (2010), vol. 6, no. 12, pages 15 - 163 |