| EP2557451 - METHOD AND ASSEMBLY FOR THE OPTICAL RECORDING OF AN ILLUMINATED SAMPLE [Right-click to bookmark this link] | |||
| Former [2013/07] | Method and assembly for the optical recording of an illuminated sample | ||
| [2017/42] | Status | No opposition filed within time limit Status updated on 25.01.2019 Database last updated on 11.04.2026 | |
| Former | The patent has been granted Status updated on 16.02.2018 | ||
| Former | Grant of patent is intended Status updated on 01.10.2017 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): IS | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states Carl Zeiss Microscopy GmbH Carl-Zeiss-Promenade 10 07745 Jena / DE | [2018/12] |
| Former [2013/07] | For all designated states Carl Zeiss Microscopy GmbH Carl-Zeiss-Promenade 10 07745 Jena / DE | Inventor(s) | 01 /
Kempe, Michael Am Mönchenberge 8 07751 Jena / DE | 02 /
Schwertner, Michael 137 B High Street SM7 2NS Banstead (Surrey) / GB | 03 /
Wolleschensky, Ralf Ricarda-Huch-Weg 26 07743 Jena / DE | [2018/12] |
| Former [2013/20] | 01 /
Kempe, Michael Am Mönchenberge 8 07751 Jena / DE | ||
| 02 /
Schwertner, Michael Fritz-Reuter-Strasse 8 07745 Jena / DE | |||
| 03 /
Wolleschensky, Ralf Ricarda-Huch-Weg 26 07743 Jena / DE | |||
| Former [2013/07] | 01 /
Kempe, Michael Am Mönchenberge 8 07751 Jena / DE | ||
| 02 /
Schwertner, Michael Ernst- Abbe-Platz 5, App. 808 07743 Jena / DE | |||
| 03 /
Wolleschensky, Ralf Ricarda-Huch-Weg 26 07743 Jena / DE | Application number, filing date | 12006411.8 | 26.09.2008 | [2013/07] | Priority number, date | DE20071047468 | 28.09.2007 Original published format: DE102007047468 | [2013/07] | Previously filed application, date | EP20080008204 | 26.09.2008 | [2013/07] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP2557451 | Date: | 13.02.2013 | Language: | DE | [2013/07] | Type: | B1 Patent specification | No.: | EP2557451 | Date: | 21.03.2018 | Language: | DE | [2018/12] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 15.01.2013 | Classification | IPC: | G02B27/60, G02B27/58, G02B21/00 | [2013/07] | CPC: |
G02B21/006 (EP)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2013/07] | Title | German: | VERFAHREN UND ANORDNUNG ZUR OPTISCHEN ERFASSUNG EINER BELEUCHTETEN PROBE | [2017/44] | English: | METHOD AND ASSEMBLY FOR THE OPTICAL RECORDING OF AN ILLUMINATED SAMPLE | [2017/42] | French: | PROCÉDÉ ET DISPOSITIF POUR LA DÉTECTION OPTIQUE D'UN ÉCHANTILLON ÉCLAIRÉ | [2017/44] |
| Former [2013/07] | Verfahren und Anordnung zur optischen Erfassung einer beleuchteten Probe | ||
| Former [2013/07] | Method and assembly for the optical recording of an illuminated sample | ||
| Former [2013/07] | Procédé et dispositif pour la détection optique d'un échantillon éclairé | Examination procedure | 12.09.2012 | Examination requested [2013/07] | 09.08.2013 | Amendment by applicant (claims and/or description) | 30.05.2014 | Despatch of a communication from the examining division (Time limit: M06) | 13.01.2015 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 28.02.2015 | Reply to a communication from the examining division | 14.08.2015 | Despatch of a communication from the examining division (Time limit: M04) | 11.12.2015 | Reply to a communication from the examining division | 06.06.2016 | Despatch of a communication from the examining division (Time limit: M04) | 11.10.2016 | Reply to a communication from the examining division | 02.10.2017 | Communication of intention to grant the patent | 05.02.2018 | Fee for grant paid | 05.02.2018 | Fee for publishing/printing paid | 05.02.2018 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP08802655.4 / EP2212739 | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued (EP20080802655) is 14.09.2010 | Opposition(s) | 02.01.2019 | No opposition filed within time limit [2019/09] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 28.02.2015 | Request for further processing filed | 28.02.2015 | Full payment received (date of receipt of payment) Request granted | 13.03.2015 | Decision despatched | Fees paid | Renewal fee | 11.09.2012 | Renewal fee patent year 03 | 11.09.2012 | Renewal fee patent year 04 | 11.09.2012 | Renewal fee patent year 05 | 20.09.2013 | Renewal fee patent year 06 | 26.09.2014 | Renewal fee patent year 07 | 25.09.2015 | Renewal fee patent year 08 | 22.09.2016 | Renewal fee patent year 09 | 26.09.2017 | Renewal fee patent year 10 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.09.2008 | CY | 21.03.2018 | CZ | 21.03.2018 | DK | 21.03.2018 | EE | 21.03.2018 | ES | 21.03.2018 | FI | 21.03.2018 | HR | 21.03.2018 | IT | 21.03.2018 | LT | 21.03.2018 | LV | 21.03.2018 | MC | 21.03.2018 | MT | 21.03.2018 | NL | 21.03.2018 | PL | 21.03.2018 | RO | 21.03.2018 | SE | 21.03.2018 | SI | 21.03.2018 | SK | 21.03.2018 | TR | 21.03.2018 | BG | 21.06.2018 | NO | 21.06.2018 | GR | 22.06.2018 | IS | 21.07.2018 | PT | 23.07.2018 | AT | 26.09.2018 | GB | 26.09.2018 | IE | 26.09.2018 | LU | 26.09.2018 | BE | 30.09.2018 | CH | 30.09.2018 | FR | 30.09.2018 | LI | 30.09.2018 | [2020/33] |
| Former [2020/28] | HU | 26.09.2008 | |
| CY | 21.03.2018 | ||
| CZ | 21.03.2018 | ||
| DK | 21.03.2018 | ||
| EE | 21.03.2018 | ||
| ES | 21.03.2018 | ||
| FI | 21.03.2018 | ||
| HR | 21.03.2018 | ||
| IT | 21.03.2018 | ||
| LT | 21.03.2018 | ||
| LV | 21.03.2018 | ||
| MC | 21.03.2018 | ||
| MT | 21.03.2018 | ||
| NL | 21.03.2018 | ||
| PL | 21.03.2018 | ||
| RO | 21.03.2018 | ||
| SE | 21.03.2018 | ||
| SI | 21.03.2018 | ||
| SK | 21.03.2018 | ||
| TR | 21.03.2018 | ||
| BG | 21.06.2018 | ||
| NO | 21.06.2018 | ||
| GR | 22.06.2018 | ||
| PT | 23.07.2018 | ||
| AT | 26.09.2018 | ||
| GB | 26.09.2018 | ||
| IE | 26.09.2018 | ||
| LU | 26.09.2018 | ||
| BE | 30.09.2018 | ||
| CH | 30.09.2018 | ||
| FR | 30.09.2018 | ||
| LI | 30.09.2018 | ||
| Former [2020/16] | CY | 21.03.2018 | |
| CZ | 21.03.2018 | ||
| DK | 21.03.2018 | ||
| EE | 21.03.2018 | ||
| ES | 21.03.2018 | ||
| FI | 21.03.2018 | ||
| HR | 21.03.2018 | ||
| IT | 21.03.2018 | ||
| LT | 21.03.2018 | ||
| LV | 21.03.2018 | ||
| MC | 21.03.2018 | ||
| MT | 21.03.2018 | ||
| NL | 21.03.2018 | ||
| PL | 21.03.2018 | ||
| RO | 21.03.2018 | ||
| SE | 21.03.2018 | ||
| SI | 21.03.2018 | ||
| SK | 21.03.2018 | ||
| TR | 21.03.2018 | ||
| BG | 21.06.2018 | ||
| NO | 21.06.2018 | ||
| GR | 22.06.2018 | ||
| PT | 23.07.2018 | ||
| AT | 26.09.2018 | ||
| GB | 26.09.2018 | ||
| IE | 26.09.2018 | ||
| LU | 26.09.2018 | ||
| BE | 30.09.2018 | ||
| CH | 30.09.2018 | ||
| FR | 30.09.2018 | ||
| LI | 30.09.2018 | ||
| Former [2020/10] | CY | 21.03.2018 | |
| CZ | 21.03.2018 | ||
| DK | 21.03.2018 | ||
| EE | 21.03.2018 | ||
| ES | 21.03.2018 | ||
| FI | 21.03.2018 | ||
| HR | 21.03.2018 | ||
| IT | 21.03.2018 | ||
| LT | 21.03.2018 | ||
| LV | 21.03.2018 | ||
| MC | 21.03.2018 | ||
| MT | 21.03.2018 | ||
| NL | 21.03.2018 | ||
| PL | 21.03.2018 | ||
| RO | 21.03.2018 | ||
| SE | 21.03.2018 | ||
| SI | 21.03.2018 | ||
| SK | 21.03.2018 | ||
| BG | 21.06.2018 | ||
| NO | 21.06.2018 | ||
| GR | 22.06.2018 | ||
| PT | 23.07.2018 | ||
| AT | 26.09.2018 | ||
| GB | 26.09.2018 | ||
| IE | 26.09.2018 | ||
| LU | 26.09.2018 | ||
| BE | 30.09.2018 | ||
| CH | 30.09.2018 | ||
| FR | 30.09.2018 | ||
| LI | 30.09.2018 | ||
| Former [2019/47] | CY | 21.03.2018 | |
| CZ | 21.03.2018 | ||
| DK | 21.03.2018 | ||
| EE | 21.03.2018 | ||
| ES | 21.03.2018 | ||
| FI | 21.03.2018 | ||
| HR | 21.03.2018 | ||
| IT | 21.03.2018 | ||
| LT | 21.03.2018 | ||
| LV | 21.03.2018 | ||
| MC | 21.03.2018 | ||
| MT | 21.03.2018 | ||
| NL | 21.03.2018 | ||
| PL | 21.03.2018 | ||
| RO | 21.03.2018 | ||
| SE | 21.03.2018 | ||
| SI | 21.03.2018 | ||
| SK | 21.03.2018 | ||
| BG | 21.06.2018 | ||
| NO | 21.06.2018 | ||
| GR | 22.06.2018 | ||
| PT | 23.07.2018 | ||
| GB | 26.09.2018 | ||
| IE | 26.09.2018 | ||
| LU | 26.09.2018 | ||
| BE | 30.09.2018 | ||
| CH | 30.09.2018 | ||
| FR | 30.09.2018 | ||
| LI | 30.09.2018 | ||
| Former [2019/40] | CY | 21.03.2018 | |
| CZ | 21.03.2018 | ||
| DK | 21.03.2018 | ||
| EE | 21.03.2018 | ||
| ES | 21.03.2018 | ||
| FI | 21.03.2018 | ||
| HR | 21.03.2018 | ||
| IT | 21.03.2018 | ||
| LT | 21.03.2018 | ||
| LV | 21.03.2018 | ||
| MC | 21.03.2018 | ||
| MT | 21.03.2018 | ||
| NL | 21.03.2018 | ||
| PL | 21.03.2018 | ||
| RO | 21.03.2018 | ||
| SE | 21.03.2018 | ||
| SI | 21.03.2018 | ||
| SK | 21.03.2018 | ||
| BG | 21.06.2018 | ||
| NO | 21.06.2018 | ||
| GR | 22.06.2018 | ||
| PT | 23.07.2018 | ||
| IE | 26.09.2018 | ||
| LU | 26.09.2018 | ||
| BE | 30.09.2018 | ||
| CH | 30.09.2018 | ||
| FR | 30.09.2018 | ||
| LI | 30.09.2018 | ||
| Former [2019/38] | CY | 21.03.2018 | |
| CZ | 21.03.2018 | ||
| DK | 21.03.2018 | ||
| EE | 21.03.2018 | ||
| ES | 21.03.2018 | ||
| FI | 21.03.2018 | ||
| HR | 21.03.2018 | ||
| IT | 21.03.2018 | ||
| LT | 21.03.2018 | ||
| LV | 21.03.2018 | ||
| MC | 21.03.2018 | ||
| MT | 21.03.2018 | ||
| NL | 21.03.2018 | ||
| PL | 21.03.2018 | ||
| RO | 21.03.2018 | ||
| SE | 21.03.2018 | ||
| SI | 21.03.2018 | ||
| SK | 21.03.2018 | ||
| BG | 21.06.2018 | ||
| NO | 21.06.2018 | ||
| GR | 22.06.2018 | ||
| PT | 23.07.2018 | ||
| IE | 26.09.2018 | ||
| LU | 26.09.2018 | ||
| BE | 30.09.2018 | ||
| FR | 30.09.2018 | ||
| Former [2019/33] | CY | 21.03.2018 | |
| CZ | 21.03.2018 | ||
| DK | 21.03.2018 | ||
| EE | 21.03.2018 | ||
| ES | 21.03.2018 | ||
| FI | 21.03.2018 | ||
| HR | 21.03.2018 | ||
| IT | 21.03.2018 | ||
| LT | 21.03.2018 | ||
| LV | 21.03.2018 | ||
| MC | 21.03.2018 | ||
| MT | 21.03.2018 | ||
| NL | 21.03.2018 | ||
| PL | 21.03.2018 | ||
| RO | 21.03.2018 | ||
| SE | 21.03.2018 | ||
| SI | 21.03.2018 | ||
| SK | 21.03.2018 | ||
| BG | 21.06.2018 | ||
| NO | 21.06.2018 | ||
| GR | 22.06.2018 | ||
| PT | 23.07.2018 | ||
| IE | 26.09.2018 | ||
| LU | 26.09.2018 | ||
| Former [2019/30] | CY | 21.03.2018 | |
| CZ | 21.03.2018 | ||
| DK | 21.03.2018 | ||
| EE | 21.03.2018 | ||
| ES | 21.03.2018 | ||
| FI | 21.03.2018 | ||
| HR | 21.03.2018 | ||
| IT | 21.03.2018 | ||
| LT | 21.03.2018 | ||
| LV | 21.03.2018 | ||
| MC | 21.03.2018 | ||
| MT | 21.03.2018 | ||
| NL | 21.03.2018 | ||
| PL | 21.03.2018 | ||
| RO | 21.03.2018 | ||
| SE | 21.03.2018 | ||
| SI | 21.03.2018 | ||
| SK | 21.03.2018 | ||
| BG | 21.06.2018 | ||
| NO | 21.06.2018 | ||
| GR | 22.06.2018 | ||
| PT | 23.07.2018 | ||
| LU | 26.09.2018 | ||
| Former [2019/26] | CY | 21.03.2018 | |
| CZ | 21.03.2018 | ||
| DK | 21.03.2018 | ||
| EE | 21.03.2018 | ||
| ES | 21.03.2018 | ||
| FI | 21.03.2018 | ||
| HR | 21.03.2018 | ||
| IT | 21.03.2018 | ||
| LT | 21.03.2018 | ||
| LV | 21.03.2018 | ||
| MC | 21.03.2018 | ||
| MT | 21.03.2018 | ||
| NL | 21.03.2018 | ||
| PL | 21.03.2018 | ||
| RO | 21.03.2018 | ||
| SE | 21.03.2018 | ||
| SI | 21.03.2018 | ||
| SK | 21.03.2018 | ||
| BG | 21.06.2018 | ||
| NO | 21.06.2018 | ||
| GR | 22.06.2018 | ||
| PT | 23.07.2018 | ||
| Former [2019/24] | CY | 21.03.2018 | |
| CZ | 21.03.2018 | ||
| DK | 21.03.2018 | ||
| EE | 21.03.2018 | ||
| ES | 21.03.2018 | ||
| FI | 21.03.2018 | ||
| HR | 21.03.2018 | ||
| IT | 21.03.2018 | ||
| LT | 21.03.2018 | ||
| LV | 21.03.2018 | ||
| MC | 21.03.2018 | ||
| MT | 21.03.2018 | ||
| NL | 21.03.2018 | ||
| PL | 21.03.2018 | ||
| RO | 21.03.2018 | ||
| SE | 21.03.2018 | ||
| SK | 21.03.2018 | ||
| BG | 21.06.2018 | ||
| NO | 21.06.2018 | ||
| GR | 22.06.2018 | ||
| PT | 23.07.2018 | ||
| Former [2019/08] | CY | 21.03.2018 | |
| CZ | 21.03.2018 | ||
| DK | 21.03.2018 | ||
| EE | 21.03.2018 | ||
| ES | 21.03.2018 | ||
| FI | 21.03.2018 | ||
| HR | 21.03.2018 | ||
| IT | 21.03.2018 | ||
| LT | 21.03.2018 | ||
| LV | 21.03.2018 | ||
| MT | 21.03.2018 | ||
| NL | 21.03.2018 | ||
| PL | 21.03.2018 | ||
| RO | 21.03.2018 | ||
| SE | 21.03.2018 | ||
| SK | 21.03.2018 | ||
| BG | 21.06.2018 | ||
| NO | 21.06.2018 | ||
| GR | 22.06.2018 | ||
| PT | 23.07.2018 | ||
| Former [2019/03] | CY | 21.03.2018 | |
| CZ | 21.03.2018 | ||
| EE | 21.03.2018 | ||
| ES | 21.03.2018 | ||
| FI | 21.03.2018 | ||
| HR | 21.03.2018 | ||
| IT | 21.03.2018 | ||
| LT | 21.03.2018 | ||
| LV | 21.03.2018 | ||
| MT | 21.03.2018 | ||
| NL | 21.03.2018 | ||
| PL | 21.03.2018 | ||
| RO | 21.03.2018 | ||
| SE | 21.03.2018 | ||
| SK | 21.03.2018 | ||
| BG | 21.06.2018 | ||
| NO | 21.06.2018 | ||
| GR | 22.06.2018 | ||
| PT | 23.07.2018 | ||
| Former [2018/50] | CY | 21.03.2018 | |
| CZ | 21.03.2018 | ||
| EE | 21.03.2018 | ||
| ES | 21.03.2018 | ||
| FI | 21.03.2018 | ||
| HR | 21.03.2018 | ||
| IT | 21.03.2018 | ||
| LT | 21.03.2018 | ||
| LV | 21.03.2018 | ||
| MT | 21.03.2018 | ||
| NL | 21.03.2018 | ||
| PL | 21.03.2018 | ||
| RO | 21.03.2018 | ||
| SE | 21.03.2018 | ||
| SK | 21.03.2018 | ||
| BG | 21.06.2018 | ||
| NO | 21.06.2018 | ||
| GR | 22.06.2018 | ||
| Former [2018/49] | CY | 21.03.2018 | |
| EE | 21.03.2018 | ||
| ES | 21.03.2018 | ||
| FI | 21.03.2018 | ||
| HR | 21.03.2018 | ||
| IT | 21.03.2018 | ||
| LT | 21.03.2018 | ||
| LV | 21.03.2018 | ||
| MT | 21.03.2018 | ||
| NL | 21.03.2018 | ||
| PL | 21.03.2018 | ||
| RO | 21.03.2018 | ||
| SE | 21.03.2018 | ||
| BG | 21.06.2018 | ||
| NO | 21.06.2018 | ||
| GR | 22.06.2018 | ||
| Former [2018/47] | CY | 21.03.2018 | |
| ES | 21.03.2018 | ||
| FI | 21.03.2018 | ||
| HR | 21.03.2018 | ||
| IT | 21.03.2018 | ||
| LT | 21.03.2018 | ||
| LV | 21.03.2018 | ||
| MT | 21.03.2018 | ||
| NL | 21.03.2018 | ||
| SE | 21.03.2018 | ||
| BG | 21.06.2018 | ||
| NO | 21.06.2018 | ||
| GR | 22.06.2018 | ||
| Former [2018/45] | CY | 21.03.2018 | |
| FI | 21.03.2018 | ||
| HR | 21.03.2018 | ||
| LT | 21.03.2018 | ||
| LV | 21.03.2018 | ||
| MT | 21.03.2018 | ||
| NL | 21.03.2018 | ||
| SE | 21.03.2018 | ||
| BG | 21.06.2018 | ||
| NO | 21.06.2018 | ||
| GR | 22.06.2018 | ||
| Former [2018/43] | CY | 21.03.2018 | |
| FI | 21.03.2018 | ||
| HR | 21.03.2018 | ||
| LT | 21.03.2018 | ||
| LV | 21.03.2018 | ||
| MT | 21.03.2018 | ||
| SE | 21.03.2018 | ||
| BG | 21.06.2018 | ||
| NO | 21.06.2018 | ||
| GR | 22.06.2018 | ||
| Former [2018/40] | CY | 21.03.2018 | |
| FI | 21.03.2018 | ||
| HR | 21.03.2018 | ||
| LT | 21.03.2018 | ||
| LV | 21.03.2018 | ||
| SE | 21.03.2018 | ||
| BG | 21.06.2018 | ||
| NO | 21.06.2018 | ||
| GR | 22.06.2018 | ||
| Former [2018/37] | CY | 21.03.2018 | |
| FI | 21.03.2018 | ||
| HR | 21.03.2018 | ||
| LT | 21.03.2018 | ||
| NO | 21.06.2018 | ||
| GR | 22.06.2018 | ||
| Former [2018/35] | CY | 21.03.2018 | |
| FI | 21.03.2018 | ||
| HR | 21.03.2018 | ||
| LT | 21.03.2018 | ||
| NO | 21.06.2018 | Documents cited: | Search | [XA] EP0353495 (LEITZ WILD GMBH et al.) | [XA] WO0043819 (ISIS INNOVATION et al.) | [XA] US2007206276 (GUGEL HILMAR et al.) | [XDA] DE10155002 (ZEISS CARL JENA GMBH et al.) | [XA] DE10118463 (ZEISS CARL JENA GMBH et al.) | [XP] EP1936422 (NIKON CORP et al.) | [AD] NEIL M A A ET AL: "METHOD OF OBTAINING OPTICAL SECTIONING BY USING STRUCTURED LIGHT IN A CONVENTIONAL MICROSCOPE", OPTICS LETTERS, OSA, OPTICAL SOCIETY OF AMERICA, WASHINGTON, DC, US, vol. 22, no. 24, 15 December 1997 (1997-12-15), pages 1805 - 1807, XP000733996, ISSN: 0146-9592 | Examination | WO2007009812 | by applicant | DE10155002 | US6028306 | US6947127 | NEIL M.A.A.; JUSKAITIS R.; WILSON T.: "Method of obtaining optical sectioning by using structured light in a conventional microscope", OPT.LETT., vol. 22, no. 24, 1997, pages 1905 - 1907, XP000733996 | LUKOSZ W.; MARCHAND M.: "Optische Auflsung unter berschreitung der beugungsbedingten Auflsungsgrenze", OPTICA ACTA, vol. 16, 1963, pages 241 - 255 | HEINTZMANN R.; CREMER C.: "Laterally modulated excitation microscopy: improvement of resolution by using a diffraction grating", PROC. OF SPIE, vol. 3568, 1998, pages 185 - 196, XP007906252 | NEIL M.A.A.; JUSKAITIS, A.; WILSON, T.: "Real time 3D fluorescence microscopy by two beam interference illumination", OPT. COMM., vol. 153, 1998, pages 1 - 4, XP004146317, DOI: doi:10.1016/S0030-4018(98)00210-7 DOI: http://dx.doi.org/10.1016/S0030-4018(98)00210-7 | HEINTZMANN R.; JOVIN T.M.; CREMER C.: "Saturated pattemed excitation microscopy - a concept for optical resolution improvement", JOSA A, vol. 19, no. 8, 2002, pages 1599 - 1609, XP002529109, DOI: doi:10.1364/JOSAA.19.001599 DOI: http://dx.doi.org/10.1364/JOSAA.19.001599 | GUSTAFSSON, M.G.L.; AGARD, D.A.; SEDAT, J.W.: "Doubling the lateral resolution of wide-field fluorescence microscopy by structured illumination", PROC. OF SPIE 3919, 2000, pages 141 - 150, XP007906250 | GUSTAFSSON M.G.L.: "Nonlinear structured-illumination microscopy: wide-field fluorescence imaging with theoretically unlimited resolution", PNAS, vol. 102, 2005, pages 13081 - 13086, XP007906251, DOI: doi:10.1073/pnas.0406877102 DOI: http://dx.doi.org/10.1073/pnas.0406877102 |