blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2479383

EP2479383 - Gas Turbine Engine Stator Vane Assembly [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  19.02.2021
Database last updated on 26.06.2024
FormerThe patent has been granted
Status updated on  13.03.2020
FormerGrant of patent is intended
Status updated on  29.10.2019
FormerExamination is in progress
Status updated on  05.10.2019
FormerGrant of patent is intended
Status updated on  21.05.2019
FormerExamination is in progress
Status updated on  21.09.2018
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For all designated states
United Technologies Corporation
10 Farm Springs Road
Farmington, CT 06032 / US
[2016/43]
Former [2012/30]For all designated states
United Technologies Corporation
One Financial Plaza
Hartford, CT 06101 / US
Inventor(s)01 / Feigleson, Steven J.
3 Marston Street
Falmouth, ME Maine 04105 / US
02 / Tremblay, Dennis R.
5 Wilson Street
Biddeford, ME Maine 04005 / US
03 / Edwards, William R.
13 Union Road
Stratham, NH New Hampshire 03885 / US
 [2012/30]
Representative(s)Dehns
St. Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
[2020/16]
Former [2012/30]Leckey, David Herbert
Dehns 10 Salisbury Square London
Greater London EC4Y 8JD / GB
Application number, filing date12151543.118.01.2012
[2012/30]
Priority number, dateUS20111301017420.01.2011         Original published format: US201113010174
[2012/30]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2479383
Date:25.07.2012
Language:EN
[2012/30]
Type: A3 Search report 
No.:EP2479383
Date:12.08.2015
Language:EN
[2015/33]
Type: B1 Patent specification 
No.:EP2479383
Date:15.04.2020
Language:EN
[2020/16]
Search report(s)(Supplementary) European search report - dispatched on:EP09.07.2015
ClassificationIPC:F01D9/04
[2012/30]
CPC:
F01D9/042 (EP,US); F01D25/285 (EP,US); F05D2230/60 (EP,US);
F05D2240/55 (EP,US); F05D2300/437 (EP,US); Y10T156/10 (EP,US);
Y10T29/49323 (EP,US); Y10T29/49885 (EP,US); Y10T29/49982 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/12]
Former [2012/30]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Leitschaufelanordnung eines Gasturbinenmotors[2012/30]
English:Gas Turbine Engine Stator Vane Assembly[2012/30]
French:Ensemble d'aube de stator de moteur de turbine à gaz[2012/30]
Examination procedure12.02.2016Amendment by applicant (claims and/or description)
12.02.2016Examination requested  [2016/12]
21.09.2018Despatch of a communication from the examining division (Time limit: M06)
01.04.2019Reply to a communication from the examining division
22.05.2019Communication of intention to grant the patent
01.10.2019Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
30.10.2019Communication of intention to grant the patent
06.03.2020Fee for grant paid
06.03.2020Fee for publishing/printing paid
06.03.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  21.09.2018
Opposition(s)18.01.2021No opposition filed within time limit [2021/12]
Fees paidRenewal fee
21.01.2014Renewal fee patent year 03
13.01.2015Renewal fee patent year 04
28.01.2016Renewal fee patent year 05
24.01.2017Renewal fee patent year 06
24.01.2018Renewal fee patent year 07
24.01.2019Renewal fee patent year 08
21.01.2020Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU18.01.2012
AL15.04.2020
AT15.04.2020
CY15.04.2020
CZ15.04.2020
DK15.04.2020
EE15.04.2020
ES15.04.2020
FI15.04.2020
HR15.04.2020
IT15.04.2020
LT15.04.2020
LV15.04.2020
MC15.04.2020
MK15.04.2020
NL15.04.2020
PL15.04.2020
RO15.04.2020
RS15.04.2020
SE15.04.2020
SI15.04.2020
SK15.04.2020
SM15.04.2020
BG15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
[2024/22]
Former [2023/27]HU18.01.2012
AL15.04.2020
AT15.04.2020
CY15.04.2020
CZ15.04.2020
DK15.04.2020
EE15.04.2020
ES15.04.2020
FI15.04.2020
HR15.04.2020
IT15.04.2020
LT15.04.2020
LV15.04.2020
MC15.04.2020
NL15.04.2020
PL15.04.2020
RO15.04.2020
RS15.04.2020
SE15.04.2020
SI15.04.2020
SK15.04.2020
SM15.04.2020
BG15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2023/24]AL15.04.2020
AT15.04.2020
CY15.04.2020
CZ15.04.2020
DK15.04.2020
EE15.04.2020
ES15.04.2020
FI15.04.2020
HR15.04.2020
IT15.04.2020
LT15.04.2020
LV15.04.2020
MC15.04.2020
NL15.04.2020
PL15.04.2020
RO15.04.2020
RS15.04.2020
SE15.04.2020
SI15.04.2020
SK15.04.2020
SM15.04.2020
BG15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2021/40]AL15.04.2020
AT15.04.2020
CZ15.04.2020
DK15.04.2020
EE15.04.2020
ES15.04.2020
FI15.04.2020
HR15.04.2020
IT15.04.2020
LT15.04.2020
LV15.04.2020
MC15.04.2020
NL15.04.2020
PL15.04.2020
RO15.04.2020
RS15.04.2020
SE15.04.2020
SI15.04.2020
SK15.04.2020
SM15.04.2020
BG15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2021/24]AL15.04.2020
AT15.04.2020
CZ15.04.2020
DK15.04.2020
EE15.04.2020
ES15.04.2020
FI15.04.2020
HR15.04.2020
IT15.04.2020
LT15.04.2020
LV15.04.2020
NL15.04.2020
PL15.04.2020
RO15.04.2020
RS15.04.2020
SE15.04.2020
SI15.04.2020
SK15.04.2020
SM15.04.2020
BG15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2021/10]AL15.04.2020
AT15.04.2020
CZ15.04.2020
DK15.04.2020
EE15.04.2020
ES15.04.2020
FI15.04.2020
HR15.04.2020
IT15.04.2020
LT15.04.2020
LV15.04.2020
NL15.04.2020
PL15.04.2020
RO15.04.2020
RS15.04.2020
SE15.04.2020
SK15.04.2020
SM15.04.2020
BG15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2021/09]AL15.04.2020
AT15.04.2020
CZ15.04.2020
DK15.04.2020
EE15.04.2020
ES15.04.2020
FI15.04.2020
HR15.04.2020
IT15.04.2020
LT15.04.2020
LV15.04.2020
NL15.04.2020
RO15.04.2020
RS15.04.2020
SE15.04.2020
SM15.04.2020
BG15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2021/08]AL15.04.2020
DK15.04.2020
ES15.04.2020
FI15.04.2020
HR15.04.2020
LT15.04.2020
LV15.04.2020
NL15.04.2020
RO15.04.2020
RS15.04.2020
SE15.04.2020
SM15.04.2020
BG15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2021/04]AL15.04.2020
FI15.04.2020
HR15.04.2020
LT15.04.2020
LV15.04.2020
NL15.04.2020
RS15.04.2020
SE15.04.2020
BG15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2021/01]FI15.04.2020
HR15.04.2020
LT15.04.2020
LV15.04.2020
NL15.04.2020
RS15.04.2020
SE15.04.2020
BG15.07.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2020/51]FI15.04.2020
HR15.04.2020
LT15.04.2020
LV15.04.2020
NL15.04.2020
RS15.04.2020
SE15.04.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2020/50]FI15.04.2020
HR15.04.2020
LT15.04.2020
LV15.04.2020
NL15.04.2020
SE15.04.2020
NO15.07.2020
GR16.07.2020
IS15.08.2020
PT17.08.2020
Former [2020/48]FI15.04.2020
LT15.04.2020
NL15.04.2020
SE15.04.2020
NO15.07.2020
IS15.08.2020
PT17.08.2020
Former [2020/47]LT15.04.2020
NO15.07.2020
IS15.08.2020
Former [2020/46]IS15.08.2020
Documents cited:Search[Y]US3836282  (MANDELBAUM W, et al) [Y] 15 * figure 1 * * column 3, line 1 - column 3, line 3 *;
 [Y]FR2606071  (SNECMA [FR]) [Y] 15 * figure 6 * * page 5 - page 6 *;
 [XI]US5569019  (KATARIYA DEVINDER N [US], et al) [X] 10 * figures 1,2,4,5 * * column 3, line 53 - column 4, line 8 * * column 5, line 20 - column 5, line 30 * [I] 11-14;
 [A]US6343912  (MANTEIGA JOHN A [US], et al) [A] 8* column 2, line 1 - column 2, line 33 *;
 [XYI]US2007104574  (ASHLEY DUNCAN E [GB], et al) [X] 1-7,9 * figure 1 * * paragraphs [0022] , [0023] * [Y] 15 [I] 8;
 [XI]US2010166545  (SCHULER ARTHUR [US], et al) [X] 1-3,9 * figures 4,7 * * paragraphs [0023] , [0026] * [I] 8
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.