EP2484527 - Pressure damper, liquid jet head, and liquid jet apparatus [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.10.2015 Database last updated on 15.05.2024 | Most recent event Tooltip | 12.10.2018 | Lapse of the patent in a contracting state New state(s): AL | published on 14.11.2018 [2018/46] | Applicant(s) | For all designated states SII Printek Inc 8 Nakase 1-chome, Mihama-ku Chiba-shi Chiba / JP | [2012/32] | Inventor(s) | 01 /
Tominaga, Kazuyoshi c/o SII Printek Inc. 8, Nakase 1-chome Mihama-ku Chiba-shi, Chiba / JP | 02 /
Koyano, Takanori c/o SII Printek Inc. 8, Nakase 1-chome Mihama-ku Chiba-shi, Chiba / JP | 03 /
Kawamura, Jun c/o SII Printek Inc. 8, Nakase 1-chome Mihama-ku Chiba-shi, Chiba / JP | [2012/32] | Representative(s) | Cloughley, Peter Andrew Miller Sturt Kenyon 9 John Street London WC1N 2ES / GB | [2014/48] |
Former [2012/32] | Cloughley, Peter Andrew Miller Sturt Kenyon 9 John Street London WC1N 2ES / GB | Application number, filing date | 12152525.7 | 25.01.2012 | [2012/32] | Priority number, date | JP20110024234 | 07.02.2011 Original published format: JP 2011024234 | JP20110246669 | 10.11.2011 Original published format: JP 2011246669 | [2012/32] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2484527 | Date: | 08.08.2012 | Language: | EN | [2012/32] | Type: | B1 Patent specification | No.: | EP2484527 | Date: | 26.11.2014 | Language: | EN | [2014/48] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 16.05.2012 | Classification | IPC: | B41J2/175 | [2012/32] | CPC: |
B41J2/175 (EP,KR,US);
B41J2/045 (KR);
Y10T137/1624 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2012/32] | Title | German: | Druckdämpfer, Flüssigkeitsstrahlkopf und Flüssigkeitsstrahlvorrichtung | [2014/31] | English: | Pressure damper, liquid jet head, and liquid jet apparatus | [2012/32] | French: | Amortisseur de pression, tête à jet liquide et appareil à jet liquide | [2012/32] |
Former [2012/32] | Druckdämpfe, Flüssigkeitsstrahlkopf und Flüssigkeitsstrahlvorrichtung | Examination procedure | 17.01.2013 | Amendment by applicant (claims and/or description) | 08.02.2013 | Examination requested [2013/12] | 14.02.2014 | Despatch of a communication from the examining division (Time limit: M04) | 22.05.2014 | Reply to a communication from the examining division | 07.07.2014 | Communication of intention to grant the patent | 17.10.2014 | Fee for grant paid | 17.10.2014 | Fee for publishing/printing paid | 17.10.2014 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 14.02.2014 | Opposition(s) | 27.08.2015 | No opposition filed within time limit [2015/45] | Fees paid | Renewal fee | 21.01.2014 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 25.01.2012 | AL | 26.11.2014 | AT | 26.11.2014 | BG | 26.11.2014 | CY | 26.11.2014 | CZ | 26.11.2014 | DK | 26.11.2014 | EE | 26.11.2014 | FI | 26.11.2014 | HR | 26.11.2014 | IT | 26.11.2014 | LT | 26.11.2014 | LV | 26.11.2014 | MC | 26.11.2014 | MK | 26.11.2014 | MT | 26.11.2014 | NL | 26.11.2014 | PL | 26.11.2014 | RO | 26.11.2014 | RS | 26.11.2014 | SE | 26.11.2014 | SI | 26.11.2014 | SK | 26.11.2014 | SM | 26.11.2014 | TR | 26.11.2014 | IE | 25.01.2015 | LU | 25.01.2015 | BE | 31.01.2015 | CH | 31.01.2015 | LI | 31.01.2015 | FR | 02.02.2015 | NO | 26.02.2015 | GR | 27.02.2015 | IS | 26.03.2015 | PT | 26.03.2015 | DE | 01.08.2015 | [2018/46] |
Former [2018/31] | HU | 25.01.2012 | |
AT | 26.11.2014 | ||
BG | 26.11.2014 | ||
CY | 26.11.2014 | ||
CZ | 26.11.2014 | ||
DK | 26.11.2014 | ||
EE | 26.11.2014 | ||
FI | 26.11.2014 | ||
HR | 26.11.2014 | ||
IT | 26.11.2014 | ||
LT | 26.11.2014 | ||
LV | 26.11.2014 | ||
MC | 26.11.2014 | ||
MK | 26.11.2014 | ||
MT | 26.11.2014 | ||
NL | 26.11.2014 | ||
PL | 26.11.2014 | ||
RO | 26.11.2014 | ||
RS | 26.11.2014 | ||
SE | 26.11.2014 | ||
SI | 26.11.2014 | ||
SK | 26.11.2014 | ||
SM | 26.11.2014 | ||
TR | 26.11.2014 | ||
IE | 25.01.2015 | ||
LU | 25.01.2015 | ||
BE | 31.01.2015 | ||
CH | 31.01.2015 | ||
LI | 31.01.2015 | ||
FR | 02.02.2015 | ||
NO | 26.02.2015 | ||
GR | 27.02.2015 | ||
IS | 26.03.2015 | ||
PT | 26.03.2015 | ||
DE | 01.08.2015 | ||
Former [2017/38] | HU | 25.01.2012 | |
AT | 26.11.2014 | ||
BG | 26.11.2014 | ||
CY | 26.11.2014 | ||
CZ | 26.11.2014 | ||
DK | 26.11.2014 | ||
EE | 26.11.2014 | ||
FI | 26.11.2014 | ||
HR | 26.11.2014 | ||
IT | 26.11.2014 | ||
LT | 26.11.2014 | ||
LV | 26.11.2014 | ||
MC | 26.11.2014 | ||
MT | 26.11.2014 | ||
NL | 26.11.2014 | ||
PL | 26.11.2014 | ||
RO | 26.11.2014 | ||
RS | 26.11.2014 | ||
SE | 26.11.2014 | ||
SI | 26.11.2014 | ||
SK | 26.11.2014 | ||
SM | 26.11.2014 | ||
TR | 26.11.2014 | ||
IE | 25.01.2015 | ||
LU | 25.01.2015 | ||
BE | 31.01.2015 | ||
CH | 31.01.2015 | ||
LI | 31.01.2015 | ||
FR | 02.02.2015 | ||
NO | 26.02.2015 | ||
GR | 27.02.2015 | ||
IS | 26.03.2015 | ||
PT | 26.03.2015 | ||
DE | 01.08.2015 | ||
Former [2017/03] | AT | 26.11.2014 | |
CY | 26.11.2014 | ||
CZ | 26.11.2014 | ||
DK | 26.11.2014 | ||
EE | 26.11.2014 | ||
FI | 26.11.2014 | ||
HR | 26.11.2014 | ||
IT | 26.11.2014 | ||
LT | 26.11.2014 | ||
LV | 26.11.2014 | ||
MC | 26.11.2014 | ||
MT | 26.11.2014 | ||
NL | 26.11.2014 | ||
PL | 26.11.2014 | ||
RO | 26.11.2014 | ||
RS | 26.11.2014 | ||
SE | 26.11.2014 | ||
SI | 26.11.2014 | ||
SK | 26.11.2014 | ||
IE | 25.01.2015 | ||
LU | 25.01.2015 | ||
CH | 31.01.2015 | ||
LI | 31.01.2015 | ||
FR | 02.02.2015 | ||
NO | 26.02.2015 | ||
GR | 27.02.2015 | ||
IS | 26.03.2015 | ||
PT | 26.03.2015 | ||
DE | 01.08.2015 | ||
Former [2016/12] | AT | 26.11.2014 | |
CY | 26.11.2014 | ||
CZ | 26.11.2014 | ||
DK | 26.11.2014 | ||
EE | 26.11.2014 | ||
FI | 26.11.2014 | ||
HR | 26.11.2014 | ||
IT | 26.11.2014 | ||
LT | 26.11.2014 | ||
LV | 26.11.2014 | ||
MC | 26.11.2014 | ||
NL | 26.11.2014 | ||
PL | 26.11.2014 | ||
RO | 26.11.2014 | ||
RS | 26.11.2014 | ||
SE | 26.11.2014 | ||
SI | 26.11.2014 | ||
SK | 26.11.2014 | ||
IE | 25.01.2015 | ||
LU | 25.01.2015 | ||
CH | 31.01.2015 | ||
LI | 31.01.2015 | ||
FR | 02.02.2015 | ||
NO | 26.02.2015 | ||
GR | 27.02.2015 | ||
IS | 26.03.2015 | ||
PT | 26.03.2015 | ||
DE | 01.08.2015 | ||
Former [2016/07] | AT | 26.11.2014 | |
CY | 26.11.2014 | ||
CZ | 26.11.2014 | ||
DK | 26.11.2014 | ||
EE | 26.11.2014 | ||
FI | 26.11.2014 | ||
HR | 26.11.2014 | ||
IT | 26.11.2014 | ||
LT | 26.11.2014 | ||
LV | 26.11.2014 | ||
MC | 26.11.2014 | ||
NL | 26.11.2014 | ||
PL | 26.11.2014 | ||
RO | 26.11.2014 | ||
RS | 26.11.2014 | ||
SE | 26.11.2014 | ||
SK | 26.11.2014 | ||
IE | 25.01.2015 | ||
LU | 25.01.2015 | ||
CH | 31.01.2015 | ||
LI | 31.01.2015 | ||
FR | 02.02.2015 | ||
NO | 26.02.2015 | ||
GR | 27.02.2015 | ||
IS | 26.03.2015 | ||
PT | 26.03.2015 | ||
DE | 01.08.2015 | ||
Former [2016/03] | AT | 26.11.2014 | |
CY | 26.11.2014 | ||
CZ | 26.11.2014 | ||
DK | 26.11.2014 | ||
EE | 26.11.2014 | ||
FI | 26.11.2014 | ||
HR | 26.11.2014 | ||
IT | 26.11.2014 | ||
LT | 26.11.2014 | ||
LV | 26.11.2014 | ||
MC | 26.11.2014 | ||
NL | 26.11.2014 | ||
PL | 26.11.2014 | ||
RO | 26.11.2014 | ||
RS | 26.11.2014 | ||
SE | 26.11.2014 | ||
SK | 26.11.2014 | ||
LU | 25.01.2015 | ||
CH | 31.01.2015 | ||
LI | 31.01.2015 | ||
FR | 02.02.2015 | ||
NO | 26.02.2015 | ||
GR | 27.02.2015 | ||
IS | 26.03.2015 | ||
PT | 26.03.2015 | ||
DE | 01.08.2015 | ||
Former [2015/51] | AT | 26.11.2014 | |
CY | 26.11.2014 | ||
CZ | 26.11.2014 | ||
DK | 26.11.2014 | ||
EE | 26.11.2014 | ||
FI | 26.11.2014 | ||
HR | 26.11.2014 | ||
LT | 26.11.2014 | ||
LV | 26.11.2014 | ||
MC | 26.11.2014 | ||
NL | 26.11.2014 | ||
PL | 26.11.2014 | ||
RO | 26.11.2014 | ||
RS | 26.11.2014 | ||
SE | 26.11.2014 | ||
SK | 26.11.2014 | ||
LU | 25.01.2015 | ||
CH | 31.01.2015 | ||
LI | 31.01.2015 | ||
FR | 02.02.2015 | ||
NO | 26.02.2015 | ||
GR | 27.02.2015 | ||
IS | 26.03.2015 | ||
PT | 26.03.2015 | ||
DE | 01.08.2015 | ||
Former [2015/47] | AT | 26.11.2014 | |
CY | 26.11.2014 | ||
CZ | 26.11.2014 | ||
DK | 26.11.2014 | ||
EE | 26.11.2014 | ||
FI | 26.11.2014 | ||
HR | 26.11.2014 | ||
LT | 26.11.2014 | ||
LV | 26.11.2014 | ||
MC | 26.11.2014 | ||
NL | 26.11.2014 | ||
PL | 26.11.2014 | ||
RO | 26.11.2014 | ||
RS | 26.11.2014 | ||
SE | 26.11.2014 | ||
SK | 26.11.2014 | ||
LU | 25.01.2015 | ||
CH | 31.01.2015 | ||
LI | 31.01.2015 | ||
NO | 26.02.2015 | ||
GR | 27.02.2015 | ||
IS | 26.03.2015 | ||
PT | 26.03.2015 | ||
DE | 01.08.2015 | ||
Former [2015/43] | AT | 26.11.2014 | |
CY | 26.11.2014 | ||
CZ | 26.11.2014 | ||
DK | 26.11.2014 | ||
EE | 26.11.2014 | ||
FI | 26.11.2014 | ||
HR | 26.11.2014 | ||
LT | 26.11.2014 | ||
LV | 26.11.2014 | ||
MC | 26.11.2014 | ||
NL | 26.11.2014 | ||
PL | 26.11.2014 | ||
RO | 26.11.2014 | ||
RS | 26.11.2014 | ||
SE | 26.11.2014 | ||
SK | 26.11.2014 | ||
LU | 25.01.2015 | ||
NO | 26.02.2015 | ||
GR | 27.02.2015 | ||
IS | 26.03.2015 | ||
PT | 26.03.2015 | ||
Former [2015/39] | AT | 26.11.2014 | |
CY | 26.11.2014 | ||
CZ | 26.11.2014 | ||
DK | 26.11.2014 | ||
EE | 26.11.2014 | ||
FI | 26.11.2014 | ||
HR | 26.11.2014 | ||
LT | 26.11.2014 | ||
LV | 26.11.2014 | ||
NL | 26.11.2014 | ||
PL | 26.11.2014 | ||
RO | 26.11.2014 | ||
RS | 26.11.2014 | ||
SE | 26.11.2014 | ||
SK | 26.11.2014 | ||
LU | 25.01.2015 | ||
NO | 26.02.2015 | ||
GR | 27.02.2015 | ||
IS | 26.03.2015 | ||
PT | 26.03.2015 | ||
Former [2015/37] | AT | 26.11.2014 | |
CY | 26.11.2014 | ||
CZ | 26.11.2014 | ||
DK | 26.11.2014 | ||
EE | 26.11.2014 | ||
FI | 26.11.2014 | ||
HR | 26.11.2014 | ||
LT | 26.11.2014 | ||
LV | 26.11.2014 | ||
NL | 26.11.2014 | ||
PL | 26.11.2014 | ||
RO | 26.11.2014 | ||
RS | 26.11.2014 | ||
SE | 26.11.2014 | ||
SK | 26.11.2014 | ||
NO | 26.02.2015 | ||
GR | 27.02.2015 | ||
IS | 26.03.2015 | ||
PT | 26.03.2015 | ||
Former [2015/36] | AT | 26.11.2014 | |
CY | 26.11.2014 | ||
CZ | 26.11.2014 | ||
DK | 26.11.2014 | ||
EE | 26.11.2014 | ||
FI | 26.11.2014 | ||
HR | 26.11.2014 | ||
LT | 26.11.2014 | ||
LV | 26.11.2014 | ||
NL | 26.11.2014 | ||
RO | 26.11.2014 | ||
RS | 26.11.2014 | ||
SE | 26.11.2014 | ||
NO | 26.02.2015 | ||
GR | 27.02.2015 | ||
IS | 26.03.2015 | ||
PT | 26.03.2015 | ||
Former [2015/35] | AT | 26.11.2014 | |
CY | 26.11.2014 | ||
DK | 26.11.2014 | ||
EE | 26.11.2014 | ||
FI | 26.11.2014 | ||
HR | 26.11.2014 | ||
LT | 26.11.2014 | ||
LV | 26.11.2014 | ||
NL | 26.11.2014 | ||
RS | 26.11.2014 | ||
SE | 26.11.2014 | ||
NO | 26.02.2015 | ||
GR | 27.02.2015 | ||
IS | 26.03.2015 | ||
PT | 26.03.2015 | ||
Former [2015/26] | AT | 26.11.2014 | |
CY | 26.11.2014 | ||
FI | 26.11.2014 | ||
HR | 26.11.2014 | ||
LT | 26.11.2014 | ||
LV | 26.11.2014 | ||
NL | 26.11.2014 | ||
RS | 26.11.2014 | ||
SE | 26.11.2014 | ||
NO | 26.02.2015 | ||
GR | 27.02.2015 | ||
IS | 26.03.2015 | ||
PT | 26.03.2015 | ||
Former [2015/25] | AT | 26.11.2014 | |
FI | 26.11.2014 | ||
HR | 26.11.2014 | ||
LT | 26.11.2014 | ||
LV | 26.11.2014 | ||
NL | 26.11.2014 | ||
RS | 26.11.2014 | ||
SE | 26.11.2014 | ||
NO | 26.02.2015 | ||
GR | 27.02.2015 | ||
IS | 26.03.2015 | ||
PT | 26.03.2015 | ||
Former [2015/24] | FI | 26.11.2014 | |
HR | 26.11.2014 | ||
LT | 26.11.2014 | ||
LV | 26.11.2014 | ||
NL | 26.11.2014 | ||
RS | 26.11.2014 | ||
SE | 26.11.2014 | ||
NO | 26.02.2015 | ||
GR | 27.02.2015 | ||
IS | 26.03.2015 | ||
PT | 26.03.2015 | ||
Former [2015/23] | FI | 26.11.2014 | |
LT | 26.11.2014 | ||
NL | 26.11.2014 | ||
NO | 26.02.2015 | ||
IS | 26.03.2015 | ||
PT | 26.03.2015 | ||
Former [2015/22] | LT | 26.11.2014 | |
NO | 26.02.2015 | ||
PT | 26.03.2015 | ||
Former [2015/21] | LT | 26.11.2014 | |
NO | 26.02.2015 | ||
Former [2015/20] | LT | 26.11.2014 | Documents cited: | Search | [X]EP1285761 (SEIKO EPSON CORP [JP]) [X] 1-14 * paragraph [0032]; figure 2 *; | [X]US2010245481 (OKUBO KATSUHIRO [JP]) [X] 1-14 * paragraph [0047]; figures 1,2 *; | [X]GB2348259 (LUK LAMELLEN & KUPPLUNGSBAU [DE]) [X] 1-14 * page 36, lines 16-32; figure 10 *; | [X]WO2007098524 (SILVERBROOK RES PTY LTD [AU], et al) [X] 1-14 * page 7, line 35 - page 10, line 22; figure 3b *; | [X]US2004027427 (TOMINAGA KAZUYOSHI [JP]) [X] 1-14 * paragraphs [0022] , [0032]; figures 2,5 *; | [X]EP1707365 (BROTHER IND LTD [JP]) [X] 1-14 * paragraphs [0031] , [0 29]; figure 3 *; | [X]EP1839881 (BROTHER IND LTD [JP]) [X] 1-14 * paragraphs [0047] , [0 49]; figure 2 *; | [X]US5078455 (WASHINGTON WILLIAM E [US]) [X] 1-14 * column 4, lines 8-55; figure 2 *; | [A]US2004051767 (TAKANO YUTAKA [JP]) [A] 1 * paragraph [0046]; figure 2 *; | [A]US4673955 (AMEYAMA MINORU [JP], et al) [A] 1 * figure 2 *; | [A]US2005151801 (NEESE DAVID A [US], et al) [A] 1 * figure 23 * | by applicant | JP2009137263 |