EP2634942 - Method and device for determining whether a configuration of an optical transmission interface has to be adjusted [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 14.02.2020 Database last updated on 05.07.2024 | |
Former | The patent has been granted Status updated on 08.03.2019 | ||
Former | Grant of patent is intended Status updated on 29.10.2018 | ||
Former | Examination is in progress Status updated on 19.01.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For:FR
Mitsubishi Electric R&D Centre Europe B.V. Capronilaan 46 1119 NS Schiphol Rijk / NL | For:AL
AT
BE
BG
CH
CY
CZ
DE
DK
EE
ES
FI
GB
GR
HR
HU
IE
IS
IT
LI
LT
LU
LV
MC
MK
MT
NL
NO
PL
PT
RO
RS
SE
SI
SK
SM
TR
Mitsubishi Electric Corporation 7-3, Marunouchi 2-chome Chiyoda-ku Tokyo 100-8310 / JP | [2019/15] |
Former [2013/36] | For:FR
Mitsubishi Electric R&D Centre Europe B.V. Capronilaan 46 1119 NS Schiphol Rijk / NL | ||
For:AL
AT
BE
BG
CH
CY
CZ
DE
DK
EE
ES
FI
GB
GR
HR
HU
IE
IS
IT
LI
LT
LU
LV
MC
MK
MT
NL
NO
PL
PT
RO
RS
SE
SI
SK
SM
TR
Mitsubishi Electric Corporation 7-3, Marunouchi 2-chome Chiyoda-ku Tokyo 100-8310 / JP | Inventor(s) | 01 /
Froc, Gwillerm MITSUBISHI ELECTRIC R&D CENTRE EUROPE 1 allée de Beaulieu CS 10806 35708 Rennes Cedex 7 / FR | 02 /
Weppe, Olivier MITSUBISHI ELECTRIC R&D CENTRE EUROPE 1 allée de Beaulieu CS 10806 35708 Rennes Cedex 7 / FR | [2013/36] | Representative(s) | Cabinet Le Guen Maillet 3, impasse de la Vigie CS 71840 35418 Saint-Malo Cedex / FR | [2019/15] |
Former [2013/36] | Maillet, Alain, et al Cabinet Le Guen Maillet 5, place Newquay B.P. 70250 35802 Dinard Cedex / FR | Application number, filing date | 12157241.6 | 28.02.2012 | [2013/36] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2634942 | Date: | 04.09.2013 | Language: | EN | [2013/36] | Type: | B1 Patent specification | No.: | EP2634942 | Date: | 10.04.2019 | Language: | EN | [2019/15] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 21.09.2012 | Classification | IPC: | H04J14/02, H04B10/07 | [2013/36] | CPC: |
H04B10/0795 (EP,US);
H04B10/2507 (EP,US);
H04J14/02 (EP,US);
H04J14/0256 (EP,US);
H04J14/0282 (EP,US);
H04J14/0227 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/15] |
Former [2013/36] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Verfahren und Vorrichtung zum Bestimmen, ob eine Konfiguration einer optischen Übertragungsschnittstelle angepasst werden muss | [2013/36] | English: | Method and device for determining whether a configuration of an optical transmission interface has to be adjusted | [2013/36] | French: | Procédé et dispositif pour déterminer si la configuration d'une interface de transmission optique doit être réglée | [2013/36] | Examination procedure | 03.03.2014 | Amendment by applicant (claims and/or description) | 03.03.2014 | Examination requested [2014/16] | 18.01.2018 | Despatch of a communication from the examining division (Time limit: M04) | 16.05.2018 | Reply to a communication from the examining division | 30.10.2018 | Communication of intention to grant the patent | 27.02.2019 | Fee for grant paid | 27.02.2019 | Fee for publishing/printing paid | 27.02.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 18.01.2018 | Opposition(s) | 13.01.2020 | No opposition filed within time limit [2020/12] | Fees paid | Renewal fee | 26.02.2014 | Renewal fee patent year 03 | 02.03.2015 | Renewal fee patent year 04 | 26.02.2016 | Renewal fee patent year 05 | 22.02.2017 | Renewal fee patent year 06 | 22.02.2018 | Renewal fee patent year 07 | 18.02.2019 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.02.2012 | AL | 10.04.2019 | AT | 10.04.2019 | CY | 10.04.2019 | CZ | 10.04.2019 | DK | 10.04.2019 | EE | 10.04.2019 | ES | 10.04.2019 | FI | 10.04.2019 | HR | 10.04.2019 | IT | 10.04.2019 | LT | 10.04.2019 | LV | 10.04.2019 | MC | 10.04.2019 | MK | 10.04.2019 | MT | 10.04.2019 | NL | 10.04.2019 | PL | 10.04.2019 | RO | 10.04.2019 | RS | 10.04.2019 | SE | 10.04.2019 | SI | 10.04.2019 | SK | 10.04.2019 | SM | 10.04.2019 | TR | 10.04.2019 | BG | 10.07.2019 | NO | 10.07.2019 | GR | 11.07.2019 | IS | 10.08.2019 | PT | 10.09.2019 | [2022/32] |
Former [2022/27] | HU | 28.02.2012 | |
AL | 10.04.2019 | ||
AT | 10.04.2019 | ||
CY | 10.04.2019 | ||
CZ | 10.04.2019 | ||
DK | 10.04.2019 | ||
EE | 10.04.2019 | ||
ES | 10.04.2019 | ||
FI | 10.04.2019 | ||
HR | 10.04.2019 | ||
IT | 10.04.2019 | ||
LT | 10.04.2019 | ||
LV | 10.04.2019 | ||
MC | 10.04.2019 | ||
MT | 10.04.2019 | ||
NL | 10.04.2019 | ||
PL | 10.04.2019 | ||
RO | 10.04.2019 | ||
RS | 10.04.2019 | ||
SE | 10.04.2019 | ||
SI | 10.04.2019 | ||
SK | 10.04.2019 | ||
SM | 10.04.2019 | ||
TR | 10.04.2019 | ||
BG | 10.07.2019 | ||
NO | 10.07.2019 | ||
GR | 11.07.2019 | ||
IS | 10.08.2019 | ||
PT | 10.09.2019 | ||
Former [2020/49] | AL | 10.04.2019 | |
AT | 10.04.2019 | ||
CZ | 10.04.2019 | ||
DK | 10.04.2019 | ||
EE | 10.04.2019 | ||
ES | 10.04.2019 | ||
FI | 10.04.2019 | ||
HR | 10.04.2019 | ||
IT | 10.04.2019 | ||
LT | 10.04.2019 | ||
LV | 10.04.2019 | ||
MC | 10.04.2019 | ||
NL | 10.04.2019 | ||
PL | 10.04.2019 | ||
RO | 10.04.2019 | ||
RS | 10.04.2019 | ||
SE | 10.04.2019 | ||
SI | 10.04.2019 | ||
SK | 10.04.2019 | ||
SM | 10.04.2019 | ||
TR | 10.04.2019 | ||
BG | 10.07.2019 | ||
NO | 10.07.2019 | ||
GR | 11.07.2019 | ||
IS | 10.08.2019 | ||
PT | 10.09.2019 | ||
Former [2020/26] | AL | 10.04.2019 | |
AT | 10.04.2019 | ||
CZ | 10.04.2019 | ||
DK | 10.04.2019 | ||
EE | 10.04.2019 | ||
ES | 10.04.2019 | ||
FI | 10.04.2019 | ||
HR | 10.04.2019 | ||
IT | 10.04.2019 | ||
LT | 10.04.2019 | ||
LV | 10.04.2019 | ||
NL | 10.04.2019 | ||
PL | 10.04.2019 | ||
RO | 10.04.2019 | ||
RS | 10.04.2019 | ||
SE | 10.04.2019 | ||
SI | 10.04.2019 | ||
SK | 10.04.2019 | ||
SM | 10.04.2019 | ||
TR | 10.04.2019 | ||
BG | 10.07.2019 | ||
NO | 10.07.2019 | ||
GR | 11.07.2019 | ||
IS | 10.08.2019 | ||
PT | 10.09.2019 | ||
Former [2020/17] | AL | 10.04.2019 | |
AT | 10.04.2019 | ||
CZ | 10.04.2019 | ||
DK | 10.04.2019 | ||
EE | 10.04.2019 | ||
ES | 10.04.2019 | ||
FI | 10.04.2019 | ||
HR | 10.04.2019 | ||
IT | 10.04.2019 | ||
LT | 10.04.2019 | ||
LV | 10.04.2019 | ||
NL | 10.04.2019 | ||
PL | 10.04.2019 | ||
RO | 10.04.2019 | ||
RS | 10.04.2019 | ||
SE | 10.04.2019 | ||
SK | 10.04.2019 | ||
SM | 10.04.2019 | ||
TR | 10.04.2019 | ||
BG | 10.07.2019 | ||
NO | 10.07.2019 | ||
GR | 11.07.2019 | ||
IS | 10.08.2019 | ||
PT | 10.09.2019 | ||
Former [2020/14] | AL | 10.04.2019 | |
AT | 10.04.2019 | ||
CZ | 10.04.2019 | ||
DK | 10.04.2019 | ||
EE | 10.04.2019 | ||
ES | 10.04.2019 | ||
FI | 10.04.2019 | ||
HR | 10.04.2019 | ||
IT | 10.04.2019 | ||
LT | 10.04.2019 | ||
LV | 10.04.2019 | ||
NL | 10.04.2019 | ||
PL | 10.04.2019 | ||
RO | 10.04.2019 | ||
RS | 10.04.2019 | ||
SE | 10.04.2019 | ||
SK | 10.04.2019 | ||
SM | 10.04.2019 | ||
BG | 10.07.2019 | ||
NO | 10.07.2019 | ||
GR | 11.07.2019 | ||
IS | 10.08.2019 | ||
PT | 10.09.2019 | ||
Former [2020/12] | AL | 10.04.2019 | |
AT | 10.04.2019 | ||
CZ | 10.04.2019 | ||
DK | 10.04.2019 | ||
EE | 10.04.2019 | ||
ES | 10.04.2019 | ||
FI | 10.04.2019 | ||
HR | 10.04.2019 | ||
IT | 10.04.2019 | ||
LT | 10.04.2019 | ||
LV | 10.04.2019 | ||
NL | 10.04.2019 | ||
PL | 10.04.2019 | ||
RO | 10.04.2019 | ||
RS | 10.04.2019 | ||
SE | 10.04.2019 | ||
SK | 10.04.2019 | ||
BG | 10.07.2019 | ||
NO | 10.07.2019 | ||
GR | 11.07.2019 | ||
IS | 10.08.2019 | ||
PT | 10.09.2019 | ||
Former [2020/11] | AL | 10.04.2019 | |
AT | 10.04.2019 | ||
CZ | 10.04.2019 | ||
DK | 10.04.2019 | ||
EE | 10.04.2019 | ||
ES | 10.04.2019 | ||
FI | 10.04.2019 | ||
HR | 10.04.2019 | ||
LT | 10.04.2019 | ||
LV | 10.04.2019 | ||
NL | 10.04.2019 | ||
PL | 10.04.2019 | ||
RO | 10.04.2019 | ||
RS | 10.04.2019 | ||
SE | 10.04.2019 | ||
SK | 10.04.2019 | ||
BG | 10.07.2019 | ||
NO | 10.07.2019 | ||
GR | 11.07.2019 | ||
IS | 10.08.2019 | ||
PT | 10.09.2019 | ||
Former [2020/10] | AL | 10.04.2019 | |
AT | 10.04.2019 | ||
CZ | 10.04.2019 | ||
DK | 10.04.2019 | ||
ES | 10.04.2019 | ||
FI | 10.04.2019 | ||
HR | 10.04.2019 | ||
LT | 10.04.2019 | ||
LV | 10.04.2019 | ||
NL | 10.04.2019 | ||
PL | 10.04.2019 | ||
RO | 10.04.2019 | ||
RS | 10.04.2019 | ||
SE | 10.04.2019 | ||
BG | 10.07.2019 | ||
NO | 10.07.2019 | ||
GR | 11.07.2019 | ||
IS | 10.08.2019 | ||
PT | 10.09.2019 | ||
Former [2020/09] | AL | 10.04.2019 | |
AT | 10.04.2019 | ||
CZ | 10.04.2019 | ||
DK | 10.04.2019 | ||
ES | 10.04.2019 | ||
FI | 10.04.2019 | ||
HR | 10.04.2019 | ||
LT | 10.04.2019 | ||
LV | 10.04.2019 | ||
NL | 10.04.2019 | ||
PL | 10.04.2019 | ||
RS | 10.04.2019 | ||
SE | 10.04.2019 | ||
BG | 10.07.2019 | ||
NO | 10.07.2019 | ||
GR | 11.07.2019 | ||
IS | 10.08.2019 | ||
PT | 10.09.2019 | ||
Former [2020/04] | AL | 10.04.2019 | |
AT | 10.04.2019 | ||
ES | 10.04.2019 | ||
FI | 10.04.2019 | ||
HR | 10.04.2019 | ||
LT | 10.04.2019 | ||
LV | 10.04.2019 | ||
NL | 10.04.2019 | ||
PL | 10.04.2019 | ||
RS | 10.04.2019 | ||
SE | 10.04.2019 | ||
BG | 10.07.2019 | ||
NO | 10.07.2019 | ||
GR | 11.07.2019 | ||
IS | 10.08.2019 | ||
PT | 10.09.2019 | ||
Former [2020/03] | AL | 10.04.2019 | |
AT | 10.04.2019 | ||
ES | 10.04.2019 | ||
FI | 10.04.2019 | ||
HR | 10.04.2019 | ||
LT | 10.04.2019 | ||
LV | 10.04.2019 | ||
NL | 10.04.2019 | ||
PL | 10.04.2019 | ||
RS | 10.04.2019 | ||
SE | 10.04.2019 | ||
BG | 10.07.2019 | ||
NO | 10.07.2019 | ||
GR | 11.07.2019 | ||
PT | 10.09.2019 | ||
Former [2019/52] | AL | 10.04.2019 | |
ES | 10.04.2019 | ||
FI | 10.04.2019 | ||
HR | 10.04.2019 | ||
LT | 10.04.2019 | ||
LV | 10.04.2019 | ||
NL | 10.04.2019 | ||
PL | 10.04.2019 | ||
RS | 10.04.2019 | ||
SE | 10.04.2019 | ||
BG | 10.07.2019 | ||
NO | 10.07.2019 | ||
GR | 11.07.2019 | ||
PT | 10.09.2019 | ||
Former [2019/51] | AL | 10.04.2019 | |
ES | 10.04.2019 | ||
FI | 10.04.2019 | ||
HR | 10.04.2019 | ||
LT | 10.04.2019 | ||
LV | 10.04.2019 | ||
NL | 10.04.2019 | ||
RS | 10.04.2019 | ||
SE | 10.04.2019 | ||
BG | 10.07.2019 | ||
NO | 10.07.2019 | ||
GR | 11.07.2019 | ||
PT | 10.09.2019 | ||
Former [2019/50] | AL | 10.04.2019 | |
ES | 10.04.2019 | ||
FI | 10.04.2019 | ||
HR | 10.04.2019 | ||
LT | 10.04.2019 | ||
LV | 10.04.2019 | ||
NL | 10.04.2019 | ||
RS | 10.04.2019 | ||
SE | 10.04.2019 | ||
NO | 10.07.2019 | ||
GR | 11.07.2019 | ||
PT | 10.09.2019 | ||
Former [2019/48] | ES | 10.04.2019 | |
FI | 10.04.2019 | ||
LT | 10.04.2019 | ||
NL | 10.04.2019 | ||
SE | 10.04.2019 | ||
NO | 10.07.2019 | ||
PT | 10.09.2019 | ||
Former [2019/47] | ES | 10.04.2019 | |
FI | 10.04.2019 | ||
LT | 10.04.2019 | ||
NL | 10.04.2019 | ||
NO | 10.07.2019 | ||
Former [2019/44] | NL | 10.04.2019 | Documents cited: | Search | [A]EP0966117 (NEC CORP [JP]) [A] 1-15 * column 4, paragraph 21 - column 7, paragraph 37; figures 1,2 *; | [A]WO03042722 (UNIV MARYLAND [US], et al) [A] 1-15 * page 7, line 17 - page 8, line 19 ** page 15, line 3 - page 16, line 17; figures 1,2,4 *; | [IA]US2009317079 (YOSHIDA NOBUHIDE [JP]) [I] 1,2,4-10,12-15 * page 7, paragraph 116 - page 9, paragraph 166; figures 6,8,10, 15, 17 * [A] 3,11 |