blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2604584

EP2604584 - Method of manufacturing strengthened glass [Right-click to bookmark this link]
Former [2013/25]Strengthened glass, touch panel and method of manufacturing strengthened glass
[2014/16]
StatusNo opposition filed within time limit
Status updated on  29.05.2015
Database last updated on 28.05.2024
Most recent event   Tooltip12.10.2018Lapse of the patent in a contracting state
New state(s): AL
published on 14.11.2018  [2018/46]
Applicant(s)For all designated states
Micro Technology Co. Ltd.
33-14, Tomigaya 1-chome Shibuya-ku
Tokyo 151-0063 / JP
[2013/25]
Inventor(s)01 / Yoshikawa, Minoru
33-14, Tomigaya 1-chome,
Shibuya-ku
Tokyo, Tokyo 151-0063 / JP
 [2013/25]
Representative(s)D'Halleweyn, Nele Veerle Trees Gertrudis
Arnold & Siedsma
Bezuidenhoutseweg 57
2594 AC The Hague / NL
[N/P]
Former [2013/25]D'Halleweyn, Nele Veerle Trees Gertrudis
Arnold & Siedsma
Sweelinckplein 1
2517 GK Den Haag / NL
Application number, filing date12159793.416.03.2012
[2013/25]
Priority number, dateJP2011027608416.12.2011         Original published format: JP 2011276084
[2013/25]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2604584
Date:19.06.2013
Language:EN
[2013/25]
Type: B1 Patent specification 
No.:EP2604584
Date:23.07.2014
Language:EN
[2014/30]
Search report(s)(Supplementary) European search report - dispatched on:EP06.12.2012
ClassificationIPC:C03C15/00, C03C17/00
[2013/25]
CPC:
C03C15/00 (EP,KR,US); C03B33/023 (EP,KR,US); C03B33/07 (EP,KR,US);
C03B33/074 (EP,KR,US); C03C17/002 (EP,KR,US); G06F3/041 (KR);
C03C2218/34 (EP,KR,US); G06F2203/04103 (KR); Y02P40/57 (EP,US);
Y10T428/24488 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2013/25]
TitleGerman:Verfahren zur Herstellung eines verstärkten Glases[2014/16]
English:Method of manufacturing strengthened glass[2014/16]
French:procédé de fabrication de verre renforcé[2014/16]
Former [2013/25]Verstärktes Glas, Berührungstafel und Verfahren zur Herstellung des verstärkten Glases
Former [2013/25]Strengthened glass, touch panel and method of manufacturing strengthened glass
Former [2013/25]Verre renforcé, panneau tactile et procédé de fabrication de verre renforcé
Examination procedure08.10.2013Amendment by applicant (claims and/or description)
08.10.2013Examination requested  [2013/47]
13.11.2013Despatch of a communication from the examining division (Time limit: M04)
10.03.2014Reply to a communication from the examining division
11.04.2014Communication of intention to grant the patent
13.05.2014Fee for grant paid
13.05.2014Fee for publishing/printing paid
11.06.2014Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  13.11.2013
Opposition(s)24.04.2015No opposition filed within time limit [2015/27]
Fees paidRenewal fee
21.03.2014Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU16.03.2012
AL23.07.2014
AT23.07.2014
CY23.07.2014
CZ23.07.2014
DK23.07.2014
EE23.07.2014
HR23.07.2014
LT23.07.2014
LV23.07.2014
MC23.07.2014
MK23.07.2014
MT23.07.2014
PL23.07.2014
RO23.07.2014
RS23.07.2014
SI23.07.2014
SK23.07.2014
SM23.07.2014
TR23.07.2014
BG23.10.2014
NO23.10.2014
GR24.10.2014
IS23.11.2014
PT24.11.2014
IE16.03.2015
LU16.03.2015
[2018/46]
Former [2018/31]HU16.03.2012
AT23.07.2014
CY23.07.2014
CZ23.07.2014
DK23.07.2014
EE23.07.2014
HR23.07.2014
LT23.07.2014
LV23.07.2014
MC23.07.2014
MK23.07.2014
MT23.07.2014
PL23.07.2014
RO23.07.2014
RS23.07.2014
SI23.07.2014
SK23.07.2014
SM23.07.2014
TR23.07.2014
BG23.10.2014
NO23.10.2014
GR24.10.2014
IS23.11.2014
PT24.11.2014
IE16.03.2015
LU16.03.2015
Former [2017/39]HU16.03.2012
AT23.07.2014
CY23.07.2014
CZ23.07.2014
DK23.07.2014
EE23.07.2014
HR23.07.2014
LT23.07.2014
LV23.07.2014
MC23.07.2014
MT23.07.2014
PL23.07.2014
RO23.07.2014
RS23.07.2014
SI23.07.2014
SK23.07.2014
SM23.07.2014
TR23.07.2014
BG23.10.2014
NO23.10.2014
GR24.10.2014
IS23.11.2014
PT24.11.2014
IE16.03.2015
LU16.03.2015
Former [2017/03]AT23.07.2014
CY23.07.2014
CZ23.07.2014
DK23.07.2014
EE23.07.2014
HR23.07.2014
LT23.07.2014
LV23.07.2014
MC23.07.2014
MT23.07.2014
PL23.07.2014
RO23.07.2014
RS23.07.2014
SI23.07.2014
SK23.07.2014
BG23.10.2014
NO23.10.2014
GR24.10.2014
IS23.11.2014
PT24.11.2014
IE16.03.2015
LU16.03.2015
Former [2016/07]AT23.07.2014
CY23.07.2014
CZ23.07.2014
DK23.07.2014
EE23.07.2014
HR23.07.2014
LT23.07.2014
LV23.07.2014
MC23.07.2014
PL23.07.2014
RO23.07.2014
RS23.07.2014
SI23.07.2014
SK23.07.2014
BG23.10.2014
NO23.10.2014
GR24.10.2014
IS23.11.2014
PT24.11.2014
IE16.03.2015
LU16.03.2015
Former [2015/51]AT23.07.2014
CY23.07.2014
CZ23.07.2014
DK23.07.2014
EE23.07.2014
HR23.07.2014
LT23.07.2014
LV23.07.2014
MC23.07.2014
PL23.07.2014
RO23.07.2014
RS23.07.2014
SI23.07.2014
SK23.07.2014
BG23.10.2014
NO23.10.2014
GR24.10.2014
IS23.11.2014
PT24.11.2014
LU16.03.2015
Former [2015/47]AT23.07.2014
CY23.07.2014
CZ23.07.2014
DK23.07.2014
EE23.07.2014
HR23.07.2014
LT23.07.2014
LV23.07.2014
MC23.07.2014
PL23.07.2014
RO23.07.2014
RS23.07.2014
SK23.07.2014
BG23.10.2014
NO23.10.2014
GR24.10.2014
IS23.11.2014
PT24.11.2014
LU16.03.2015
Former [2015/46]AT23.07.2014
CY23.07.2014
CZ23.07.2014
DK23.07.2014
EE23.07.2014
HR23.07.2014
LT23.07.2014
LV23.07.2014
MC23.07.2014
PL23.07.2014
RO23.07.2014
RS23.07.2014
SK23.07.2014
BG23.10.2014
NO23.10.2014
GR24.10.2014
IS23.11.2014
PT24.11.2014
Former [2015/23]AT23.07.2014
CY23.07.2014
CZ23.07.2014
DK23.07.2014
EE23.07.2014
HR23.07.2014
LT23.07.2014
LV23.07.2014
PL23.07.2014
RO23.07.2014
RS23.07.2014
SK23.07.2014
BG23.10.2014
NO23.10.2014
GR24.10.2014
IS23.11.2014
PT24.11.2014
Former [2015/22]AT23.07.2014
CY23.07.2014
DK23.07.2014
HR23.07.2014
LT23.07.2014
LV23.07.2014
PL23.07.2014
RO23.07.2014
RS23.07.2014
BG23.10.2014
NO23.10.2014
GR24.10.2014
IS23.11.2014
PT24.11.2014
Former [2015/12]AT23.07.2014
CY23.07.2014
HR23.07.2014
LT23.07.2014
LV23.07.2014
PL23.07.2014
RS23.07.2014
BG23.10.2014
NO23.10.2014
GR24.10.2014
IS23.11.2014
PT24.11.2014
Former [2015/11]CY23.07.2014
LT23.07.2014
PL23.07.2014
BG23.10.2014
NO23.10.2014
GR24.10.2014
PT24.11.2014
Former [2015/10]LT23.07.2014
BG23.10.2014
NO23.10.2014
Former [2015/08]LT23.07.2014
Documents cited:Search[XI]JP2011136855  (OPTREX KK) [X] 1-3 * abstract * [I] 4-6;
 [P]JP2011136855  ;
 [A]US4911743  (BAGBY JOHN P [US]) [A] 1-6 * figures 5A-5E *;
 [XP]WO2012027133  (CORNING INC [US], et al) [XP] 5,6 * figures 1-2; example - *;
 [A]TW201121911  (WINTEK CORP [TW]) [A] 1-6 * abstract *;
 [AP]WO2011163450  (CORNING INC [US], et al) [AP] 1-6 * figure 1; claim - *
 [P]  - DATABASE WPI, 0, Derwent World Patents Index, vol. 2011, no. 47, Database accession no. 2011-H79395, & JP2011136855 A 20110714 (OPTREX CO LTD) [P] * abstract *
ExaminationUS2011183116
by applicantJP2011164508
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.