EP2503672 - Method of providing the channels used for cooling of a Motor stator [Right-click to bookmark this link] | |||
Former [2012/39] | Motor stator having channels used for cooling and method of providing the channels | ||
[2020/07] | Status | No opposition filed within time limit Status updated on 30.04.2021 Database last updated on 26.07.2024 | |
Former | The patent has been granted Status updated on 22.05.2020 | ||
Former | Grant of patent is intended Status updated on 03.02.2020 | ||
Former | Examination is in progress Status updated on 15.02.2019 | ||
Former | Request for examination was made Status updated on 30.06.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Hamilton Sundstrand Corporation One Hamilton Road Windsor Locks, CT 06096-1010 / US | [2020/26] |
Former [2012/39] | For all designated states Hamilton Sundstrand Corporation One Hamilton Road Windsor Locks, CT 06096-1010 / US | Inventor(s) | 01 /
Pal, Debabrata 1705 Shorewood Drive Hoffman Estates, IL Illinois 60195 / US | [2012/39] | Representative(s) | Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | [2020/26] |
Former [2012/39] | Tomlinson, Kerry John Dehns St Bride's House 10 Salisbury Square London EC4Y 8JD / GB | Application number, filing date | 12160225.4 | 19.03.2012 | [2012/39] | Priority number, date | US201113053297 | 22.03.2011 Original published format: US201113053297 | [2012/39] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2503672 | Date: | 26.09.2012 | Language: | EN | [2012/39] | Type: | A3 Search report | No.: | EP2503672 | Date: | 21.12.2016 | Language: | EN | [2016/51] | Type: | B1 Patent specification | No.: | EP2503672 | Date: | 24.06.2020 | Language: | EN | [2020/26] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 21.11.2016 | Classification | IPC: | H02K3/24, H02K1/20, // H02K7/14 | [2016/25] | CPC: |
H02K3/24 (EP,US);
H02K1/20 (EP,US);
H02K7/14 (EP,US);
Y10T29/49009 (EP,US)
|
Former IPC [2012/39] | H02K3/24, H02K1/20 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/31] |
Former [2012/39] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Verfahren zur Bereitstellung von Kanälen in einem Motorstator, die zur Kühlung verwendet werden | [2020/07] | English: | Method of providing the channels used for cooling of a Motor stator | [2020/07] | French: | Procédé pour fournir les canaux utilisés pour le refroidissement d'un stator de moteur | [2020/07] |
Former [2012/39] | Motorstator mit Kanälen, die zur Kühlung verwendet werden, und Verfahren zur Bereitstellung der Kanäle | ||
Former [2012/39] | Motor stator having channels used for cooling and method of providing the channels | ||
Former [2012/39] | Stator de moteur doté de canaux utilisés pour le refroidissement et procédé pour fournir les canaux | Examination procedure | 19.03.2012 | Date on which the examining division has become responsible | 21.06.2017 | Amendment by applicant (claims and/or description) | 21.06.2017 | Examination requested [2017/31] | 19.02.2019 | Despatch of a communication from the examining division (Time limit: M04) | 28.06.2019 | Reply to a communication from the examining division | 17.07.2019 | Despatch of a communication from the examining division (Time limit: M02) | 27.09.2019 | Reply to a communication from the examining division | 04.02.2020 | Communication of intention to grant the patent | 15.05.2020 | Fee for grant paid | 15.05.2020 | Fee for publishing/printing paid | 15.05.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 19.02.2019 | Opposition(s) | 25.03.2021 | No opposition filed within time limit [2021/22] | Fees paid | Renewal fee | 12.03.2014 | Renewal fee patent year 03 | 10.03.2015 | Renewal fee patent year 04 | 23.03.2016 | Renewal fee patent year 05 | 23.03.2017 | Renewal fee patent year 06 | 23.03.2018 | Renewal fee patent year 07 | 22.03.2019 | Renewal fee patent year 08 | 20.03.2020 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.03.2012 | AL | 24.06.2020 | AT | 24.06.2020 | CY | 24.06.2020 | CZ | 24.06.2020 | DK | 24.06.2020 | EE | 24.06.2020 | ES | 24.06.2020 | FI | 24.06.2020 | HR | 24.06.2020 | IT | 24.06.2020 | LT | 24.06.2020 | LV | 24.06.2020 | MC | 24.06.2020 | MK | 24.06.2020 | NL | 24.06.2020 | PL | 24.06.2020 | RO | 24.06.2020 | RS | 24.06.2020 | SE | 24.06.2020 | SI | 24.06.2020 | SK | 24.06.2020 | SM | 24.06.2020 | TR | 24.06.2020 | BG | 24.09.2020 | NO | 24.09.2020 | GR | 25.09.2020 | IS | 24.10.2020 | PT | 26.10.2020 | GB | 19.03.2021 | IE | 19.03.2021 | LU | 19.03.2021 | [2024/29] |
Former [2024/22] | HU | 19.03.2012 | |
AL | 24.06.2020 | ||
AT | 24.06.2020 | ||
CY | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
MK | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
GB | 19.03.2021 | ||
IE | 19.03.2021 | ||
LU | 19.03.2021 | ||
Former [2023/27] | HU | 19.03.2012 | |
AL | 24.06.2020 | ||
AT | 24.06.2020 | ||
CY | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
GB | 19.03.2021 | ||
IE | 19.03.2021 | ||
LU | 19.03.2021 | ||
Former [2023/24] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CY | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
GB | 19.03.2021 | ||
IE | 19.03.2021 | ||
LU | 19.03.2021 | ||
Former [2022/09] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
GB | 19.03.2021 | ||
IE | 19.03.2021 | ||
LU | 19.03.2021 | ||
Former [2022/07] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
IE | 19.03.2021 | ||
Former [2021/45] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/36] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/20] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/10] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/09] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
IT | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
NL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
PT | 26.10.2020 | ||
Former [2021/04] | AL | 24.06.2020 | |
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
NL | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
Former [2021/01] | FI | 24.06.2020 | |
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
Former [2020/51] | FI | 24.06.2020 | |
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
RS | 24.06.2020 | ||
SE | 24.06.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
Former [2020/50] | FI | 24.06.2020 | |
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
SE | 24.06.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
Former [2020/48] | FI | 24.06.2020 | |
LT | 24.06.2020 | ||
SE | 24.06.2020 | ||
NO | 24.09.2020 | ||
Former [2020/47] | LT | 24.06.2020 | |
NO | 24.09.2020 | Documents cited: | Search | [A]GB1020952 (MARCEL BAYLAC) [A] 13* page 3, line 10 - line 37; figures 8-10 *; | [X]EP0684682 (GEC ALSTHOM LTD [GB]) [X] 1-5 * abstract * * column 2, line 26 - column 3, line 25 * * column 9, line 25 - line 39; figures 3,4,8 *; | [Y]EP1156579 (SODICK CO LTD [JP]) [Y] 7 * figure 3 *; | [Y]EP1276205 (LIEBERMANN ELI [US]) [Y] 8,9 * column 1, line 27 - line 33; figure 1 *; | [XAY]JP2003250239 (NISSAN MOTOR) [X] 1,6,10-12 * abstract * [A] 13 [Y] 7-9 |