EP2503344 - Energy Consumption Management [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 19.09.2014 Database last updated on 06.07.2024 | Most recent event Tooltip | 12.10.2018 | Lapse of the patent in a contracting state New state(s): AL | published on 14.11.2018 [2018/46] | Applicant(s) | For all designated states Reactive Technologies Limited 9400 Garsington Road Oxford Business Park Oxford, OX4 2HN / GB | [2013/45] |
Former [2012/39] | For all designated states Reactive Technologies Limited Unit 2 14 Weller Street London SE1 1QU / GB | Inventor(s) | 01 /
Borrett, Marc 8 Spencer Road Poole, Dorset BH13 7EU / GB | 02 /
Huomo, Heikki Riekkotie 13 90650 Oulu / FI | [2012/39] | Representative(s) | Price, Christopher EIP Fairfax House 15 Fulwood Place London WC1V 6HU / GB | [2012/39] | Application number, filing date | 12161124.8 | 23.03.2012 | [2012/39] | Priority number, date | GB20110004986 | 24.03.2011 Original published format: GB 201104986 | [2012/39] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2503344 | Date: | 26.09.2012 | Language: | EN | [2012/39] | Type: | B1 Patent specification | No.: | EP2503344 | Date: | 13.11.2013 | Language: | EN | [2013/46] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 17.07.2012 | Classification | IPC: | G01R21/133, H02J3/04, H02J3/06, H02J3/14, H02J3/18, H02J13/00, G06Q10/06, G06Q50/06 | [2013/24] | CPC: |
G06Q10/06 (EP,US);
G06Q10/06312 (CN,KR);
H02J3/14 (EP,CN,GB,KR,US);
G06Q50/06 (EP,CN,KR,US);
H02J4/00 (KR,US);
H02J2310/12 (EP);
H02J2310/14 (EP);
Y02B70/30 (EP,US);
Y02B70/3225 (EP,KR,US);
|
Former IPC [2012/39] | G01R21/133, H02J3/04, H02J3/06, H02J3/14, H02J3/18, H02J13/00, G06Q10/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2012/39] | Title | German: | Energieverbrauchsverwaltung | [2012/39] | English: | Energy Consumption Management | [2012/39] | French: | Gestion de la consommation d'énergie | [2012/39] | Examination procedure | 23.03.2012 | Examination requested [2012/39] | 08.10.2012 | Despatch of a communication from the examining division (Time limit: M04) | 18.02.2013 | Reply to a communication from the examining division | 03.06.2013 | Communication of intention to grant the patent | 27.09.2013 | Fee for grant paid | 27.09.2013 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 08.10.2012 | Opposition(s) | 14.08.2014 | No opposition filed within time limit [2014/43] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.03.2012 | AL | 13.11.2013 | BG | 13.11.2013 | CY | 13.11.2013 | EE | 13.11.2013 | LT | 13.11.2013 | LV | 13.11.2013 | MC | 13.11.2013 | MK | 13.11.2013 | MT | 13.11.2013 | RO | 13.11.2013 | RS | 13.11.2013 | SI | 13.11.2013 | SK | 13.11.2013 | SM | 13.11.2013 | NO | 13.02.2014 | GR | 14.02.2014 | IS | 13.03.2014 | [2018/46] |
Former [2018/31] | HU | 23.03.2012 | |
BG | 13.11.2013 | ||
CY | 13.11.2013 | ||
EE | 13.11.2013 | ||
LT | 13.11.2013 | ||
LV | 13.11.2013 | ||
MC | 13.11.2013 | ||
MK | 13.11.2013 | ||
MT | 13.11.2013 | ||
RO | 13.11.2013 | ||
RS | 13.11.2013 | ||
SI | 13.11.2013 | ||
SK | 13.11.2013 | ||
SM | 13.11.2013 | ||
NO | 13.02.2014 | ||
GR | 14.02.2014 | ||
IS | 13.03.2014 | ||
Former [2016/32] | HU | 23.03.2012 | |
BG | 13.11.2013 | ||
CY | 13.11.2013 | ||
EE | 13.11.2013 | ||
LT | 13.11.2013 | ||
LV | 13.11.2013 | ||
MC | 13.11.2013 | ||
MT | 13.11.2013 | ||
RO | 13.11.2013 | ||
RS | 13.11.2013 | ||
SI | 13.11.2013 | ||
SK | 13.11.2013 | ||
SM | 13.11.2013 | ||
NO | 13.02.2014 | ||
GR | 14.02.2014 | ||
IS | 13.03.2014 | ||
Former [2016/31] | BG | 13.11.2013 | |
CY | 13.11.2013 | ||
EE | 13.11.2013 | ||
LT | 13.11.2013 | ||
LV | 13.11.2013 | ||
MC | 13.11.2013 | ||
MT | 13.11.2013 | ||
RO | 13.11.2013 | ||
RS | 13.11.2013 | ||
SI | 13.11.2013 | ||
SK | 13.11.2013 | ||
SM | 13.11.2013 | ||
NO | 13.02.2014 | ||
GR | 14.02.2014 | ||
IS | 13.03.2014 | ||
Former [2016/28] | CY | 13.11.2013 | |
EE | 13.11.2013 | ||
LT | 13.11.2013 | ||
LV | 13.11.2013 | ||
MC | 13.11.2013 | ||
MT | 13.11.2013 | ||
RO | 13.11.2013 | ||
RS | 13.11.2013 | ||
SI | 13.11.2013 | ||
SK | 13.11.2013 | ||
SM | 13.11.2013 | ||
NO | 13.02.2014 | ||
GR | 14.02.2014 | ||
IS | 13.03.2014 | ||
Former [2016/27] | CY | 13.11.2013 | |
EE | 13.11.2013 | ||
LT | 13.11.2013 | ||
LV | 13.11.2013 | ||
MC | 13.11.2013 | ||
MT | 13.11.2013 | ||
RO | 13.11.2013 | ||
RS | 13.11.2013 | ||
SI | 13.11.2013 | ||
SK | 13.11.2013 | ||
SM | 13.11.2013 | ||
NO | 13.02.2014 | ||
IS | 13.03.2014 | ||
Former [2016/24] | CY | 13.11.2013 | |
EE | 13.11.2013 | ||
LT | 13.11.2013 | ||
LV | 13.11.2013 | ||
MT | 13.11.2013 | ||
RO | 13.11.2013 | ||
RS | 13.11.2013 | ||
SI | 13.11.2013 | ||
SK | 13.11.2013 | ||
SM | 13.11.2013 | ||
NO | 13.02.2014 | ||
IS | 13.03.2014 | ||
Former [2016/22] | CY | 13.11.2013 | |
EE | 13.11.2013 | ||
LT | 13.11.2013 | ||
LV | 13.11.2013 | ||
MT | 13.11.2013 | ||
RS | 13.11.2013 | ||
SI | 13.11.2013 | ||
SK | 13.11.2013 | ||
SM | 13.11.2013 | ||
NO | 13.02.2014 | ||
IS | 13.03.2014 | ||
Former [2016/12] | CY | 13.11.2013 | |
EE | 13.11.2013 | ||
LT | 13.11.2013 | ||
LV | 13.11.2013 | ||
MT | 13.11.2013 | ||
RS | 13.11.2013 | ||
SI | 13.11.2013 | ||
SK | 13.11.2013 | ||
NO | 13.02.2014 | ||
IS | 13.03.2014 | ||
Former [2015/14] | CY | 13.11.2013 | |
EE | 13.11.2013 | ||
LT | 13.11.2013 | ||
LV | 13.11.2013 | ||
RS | 13.11.2013 | ||
SI | 13.11.2013 | ||
SK | 13.11.2013 | ||
NO | 13.02.2014 | ||
IS | 13.03.2014 | ||
Former [2014/37] | CY | 13.11.2013 | |
EE | 13.11.2013 | ||
LT | 13.11.2013 | ||
LV | 13.11.2013 | ||
RS | 13.11.2013 | ||
SK | 13.11.2013 | ||
NO | 13.02.2014 | ||
IS | 13.03.2014 | ||
Former [2014/36] | CY | 13.11.2013 | |
EE | 13.11.2013 | ||
LT | 13.11.2013 | ||
LV | 13.11.2013 | ||
RS | 13.11.2013 | ||
NO | 13.02.2014 | ||
IS | 13.03.2014 | ||
Former [2014/26] | CY | 13.11.2013 | |
LT | 13.11.2013 | ||
LV | 13.11.2013 | ||
RS | 13.11.2013 | ||
NO | 13.02.2014 | ||
IS | 13.03.2014 | ||
Former [2014/25] | LT | 13.11.2013 | |
LV | 13.11.2013 | ||
RS | 13.11.2013 | ||
NO | 13.02.2014 | ||
IS | 13.03.2014 | ||
Former [2014/24] | LT | 13.11.2013 | |
RS | 13.11.2013 | ||
NO | 13.02.2014 | ||
IS | 13.03.2014 | ||
Former [2014/23] | LT | 13.11.2013 | |
NO | 13.02.2014 | ||
IS | 13.03.2014 | ||
Former [2014/20] | LT | 13.11.2013 | |
NO | 13.02.2014 | Documents cited: | Search | [X]US2004046455 (MURGUIA JOSE TOMAS ORTEGA [MX]); | [X]US2009043519 (BRIDGES SETH W [US], et al) |