EP2511023 - Hydraulically operated setting device with a hydraulic aggregate and a joining method for connecting at least two components [Right-click to bookmark this link] | |||
Former [2012/42] | Hydraulically actuated fastener setting device with a hydraulics system and method for fastening at least two components | ||
[2018/23] | Status | No opposition filed within time limit Status updated on 31.05.2019 Database last updated on 30.07.2024 | |
Former | The patent has been granted Status updated on 22.06.2018 | ||
Former | Grant of patent is intended Status updated on 01.06.2018 | ||
Former | Examination is in progress Status updated on 24.04.2018 | ||
Former | Grant of patent is intended Status updated on 14.12.2017 | ||
Former | Examination is in progress Status updated on 03.02.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Böllhoff Verbindungstechnik GmbH Archimedesstr. 1-4 33649 Bielefeld / DE | [2012/42] | Inventor(s) | 01 /
Draht, Torsten Stadtweg 14a 33758 Schloß Holte / DE | [2018/30] |
Former [2012/42] | 01 /
Draht, Torsten Stadtweg 14 a 33758 Schloß Holte / DE | Representative(s) | Heyer, Volker, et al HWP Intellectual Property Ridlerstrasse 35 80339 München / DE | [2018/30] |
Former [2012/42] | Heyer, Volker Bockhorni & Kollegen Elsenheimerstrasse 49 80687 München / DE | Application number, filing date | 12162094.2 | 29.03.2012 | [2012/42] | Priority number, date | DE20111002058 | 14.04.2011 Original published format: DE102011002058 | [2012/42] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | EP2511023 | Date: | 17.10.2012 | Language: | DE | [2012/42] | Type: | A3 Search report | No.: | EP2511023 | Date: | 13.01.2016 | Language: | DE | [2016/02] | Type: | B1 Patent specification | No.: | EP2511023 | Date: | 25.07.2018 | Language: | DE | [2018/30] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 14.12.2015 | Classification | IPC: | B21J15/02, B21J15/20 | [2012/42] | CPC: |
B21J15/025 (EP,US);
B21J15/20 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/20] |
Former [2012/42] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Hydraulisch betriebenes Setzgerät mit einem Hydraulikaggregat und ein Fügeverfahren zum Verbinden von mindestens zwei Bauteilen | [2012/42] | English: | Hydraulically operated setting device with a hydraulic aggregate and a joining method for connecting at least two components | [2018/23] | French: | Appareil de pose d'éléments de fixation doté d'un agrégat hydraulique et procédé d'assemblage d'au moins deux composants | [2012/42] |
Former [2012/42] | Hydraulically actuated fastener setting device with a hydraulics system and method for fastening at least two components | Examination procedure | 31.03.2016 | Amendment by applicant (claims and/or description) | 31.03.2016 | Examination requested [2016/20] | 07.02.2017 | Despatch of a communication from the examining division (Time limit: M06) | 26.07.2017 | Reply to a communication from the examining division | 15.12.2017 | Communication of intention to grant the patent | 20.04.2018 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 20.04.2018 | Fee for grant paid | 20.04.2018 | Fee for publishing/printing paid | 08.06.2018 | Communication of intention to grant the patent | 14.06.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 07.02.2017 | Opposition(s) | 26.04.2019 | No opposition filed within time limit [2019/27] | Fees paid | Renewal fee | 26.03.2014 | Renewal fee patent year 03 | 27.03.2015 | Renewal fee patent year 04 | 16.03.2016 | Renewal fee patent year 05 | 22.03.2017 | Renewal fee patent year 06 | 21.03.2018 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.03.2012 | AL | 25.07.2018 | CY | 25.07.2018 | CZ | 25.07.2018 | DK | 25.07.2018 | EE | 25.07.2018 | ES | 25.07.2018 | FI | 25.07.2018 | HR | 25.07.2018 | IT | 25.07.2018 | LT | 25.07.2018 | LV | 25.07.2018 | MC | 25.07.2018 | MK | 25.07.2018 | MT | 25.07.2018 | NL | 25.07.2018 | PL | 25.07.2018 | RO | 25.07.2018 | RS | 25.07.2018 | SE | 25.07.2018 | SI | 25.07.2018 | SK | 25.07.2018 | SM | 25.07.2018 | TR | 25.07.2018 | BG | 25.10.2018 | NO | 25.10.2018 | GR | 26.10.2018 | IS | 25.11.2018 | PT | 25.11.2018 | AT | 29.03.2019 | IE | 29.03.2019 | LU | 29.03.2019 | BE | 31.03.2019 | CH | 31.03.2019 | LI | 31.03.2019 | [2022/31] |
Former [2021/32] | HU | 29.03.2012 | |
AL | 25.07.2018 | ||
CY | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
MT | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
TR | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
PT | 25.11.2018 | ||
AT | 29.03.2019 | ||
IE | 29.03.2019 | ||
LU | 29.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
Former [2021/26] | AL | 25.07.2018 | |
CY | 25.07.2018 | ||
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
MT | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
TR | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
PT | 25.11.2018 | ||
AT | 29.03.2019 | ||
IE | 29.03.2019 | ||
LU | 29.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
Former [2020/51] | AL | 25.07.2018 | |
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
MT | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
TR | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
PT | 25.11.2018 | ||
AT | 29.03.2019 | ||
IE | 29.03.2019 | ||
LU | 29.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
Former [2020/29] | AL | 25.07.2018 | |
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
MT | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
TR | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
PT | 25.11.2018 | ||
IE | 29.03.2019 | ||
LU | 29.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
Former [2020/16] | AL | 25.07.2018 | |
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
TR | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
IE | 29.03.2019 | ||
LU | 29.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
Former [2020/11] | AL | 25.07.2018 | |
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
IE | 29.03.2019 | ||
LU | 29.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
LI | 31.03.2019 | ||
Former [2020/09] | AL | 25.07.2018 | |
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
IE | 29.03.2019 | ||
LU | 29.03.2019 | ||
Former [2020/01] | AL | 25.07.2018 | |
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
LU | 29.03.2019 | ||
Former [2019/46] | AL | 25.07.2018 | |
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
MC | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/37] | AL | 25.07.2018 | |
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SI | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/26] | AL | 25.07.2018 | |
CZ | 25.07.2018 | ||
DK | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SK | 25.07.2018 | ||
SM | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/23] | AL | 25.07.2018 | |
CZ | 25.07.2018 | ||
EE | 25.07.2018 | ||
ES | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
SK | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/22] | AL | 25.07.2018 | |
CZ | 25.07.2018 | ||
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RO | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/21] | AL | 25.07.2018 | |
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
IT | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/12] | AL | 25.07.2018 | |
FI | 25.07.2018 | ||
HR | 25.07.2018 | ||
LT | 25.07.2018 | ||
LV | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/11] | FI | 25.07.2018 | |
HR | 25.07.2018 | ||
LT | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/10] | FI | 25.07.2018 | |
LT | 25.07.2018 | ||
NL | 25.07.2018 | ||
PL | 25.07.2018 | ||
RS | 25.07.2018 | ||
SE | 25.07.2018 | ||
BG | 25.10.2018 | ||
NO | 25.10.2018 | ||
GR | 26.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/08] | FI | 25.07.2018 | |
LT | 25.07.2018 | ||
NL | 25.07.2018 | ||
NO | 25.10.2018 | ||
IS | 25.11.2018 | ||
Former [2019/07] | LT | 25.07.2018 | |
NL | 25.07.2018 | ||
Former [2019/04] | NL | 25.07.2018 | Documents cited: | Search | [XA]DE19752367 (EMHART INC [US]) [X] 19,20 * column 9, lines 1-44; figure - *[A] 1-18; | [XA]EP1055466 (BOELLHOFF GMBH [DE]) [X] 19,20 * paragraphs [0018] - [0022]; figure - * [A] 1-18; | [XAI]EP1640081 (BOELLHOFF VERBINDUNGSTECHNIK [DE]) [X] 19,20 * paragraphs [0001] , [0027] , [0041]; figures 2,4 * [A] 1-3,6-18 [I] 4,5; | [XAI]DE102009040126 (BOELLHOFF VERBINDUNGSTECHNIK [DE]) [X] 19,20 * paragraphs [0003] , [0004] , [0014] , [0016] , [0022] , [0042] , [0046] , [0052] , [0054] , [0059]; figures 1,4,5,6,7 * [A] 1-3,6-18 [I] 4,5 | Examination | DE3043149 |